G.7 HSIP Change OrdersBackground •In 2016 the City received award of a grant for $435,500 to improve the safety of five intersections along the Mt. Vernon Corridor. •In December 2019 Caltrans approved the E-76 for Construction of the Mt. Vernon Safety Project estimated at $325,000 as part of the HSIP Cycle 8 Mt. Vernon Corridor Intersection Improvement Project FEDERAL ID: HSIPL-5421(005) IT E M N O. ITEM DESCRIPTION ESTIMATE 1 Fund Obligation $8,000 2 Preliminary Engineering $36,000 3 Grant Administration/Bidding Support $10,000 4 Construction $325,000 5 Construction Management/Inspection $36,500 6 Staff Coordination $20,000 TOTAL $435,500 Background HR Green, Inc. Gary Yeo, Construction Services Manager Alan DeWitt, Infrastructure Inspector Responsible for Project Management, Inspection, and Change Order Recommendations Mt. Vernon Safety Improvement Project Mt. Vernon Safety Improvement Project Mt. Vernon Safety Improvement Project Raised Crosswalk Table or Speed Table Question 1.Drainage 2.ADA 3.Emergency Access 4.Street Classification Mt. Vernon Safety Improvement Project Mt. Vernon Safety Improvement Project Mt. Vernon Safety Improvement Project Mt. Vernon Safety Improvement Project Mt. Vernon Safety Improvement Project Mt. Vernon Safety Improvement Project Mt. Vernon Safety Improvement Project Mt. Vernon Safety Improvement Project Remaining Funding Available E-76 Actual Available Contract Award Available Additional Funds Preliminary Engineering $24,956 $24,956 Construction $398,300 $376,300 $268,350 $107,950 Construction Engineering $22,000 Total $423,256 1.0 Asphalt Concrete Remove and Replace $8,232.00 1.1 Additional Asphalt Mill and Overlay $30,525.00 1.2 Streetlight Mast Arms $7,500.00 1.3 Streetlight Foundations $6,200.00 1.4 Additional Concrete Curb $2,701.23 1.5 Payment and Performance Bonds $7,000.00 2.1 Canal Street Crack and Slurry Seal $10,400.00 2.2 Additional Striping on Mt. Vernon Intersections $6,500.00 2.3 Crack and Slurry Seal 3 -Mt. Vernon Intersections $28,800.00 Total $107,858.23 Proposed Change Orders 1 and 2 Resolution Findings 1.C.O. #1 is complete, except for backordered streetlight poles. 2.C.O. #2 is important and necessary to complete the installation of enhanced crosswalks. 3.Contractor's work and proposed C.O. #2's work, if approved, will be completed in October. It is not practical to rebid the small amount of remaining work, which will take a minimum of 3 months. 4.If the Project were re-bid, then the cost of procurement, preparation of bid documents, the bidding process, and the cost of work will likely exceed the available HSIP grant funds. 5.There are a limited number of firms that would be interested in a small contract. 6.The Contractor has used the Agreement's used unit prices where possible and has provided reasonable change order prices for work requested 7.Caltrans Local Assistance, which oversees the use of federal funds, found the use of the existing contract acceptable for completing the work. Staff Recommendation •Approval of a Resolution Approving Change Orders to TSR Construction for Grand Terrace/Mount Vernon Intersection Improvements, Which Adjusts Quantities, Adds Extra Work; And, Therefore, Increases Total Compensation by $107,858.23; and Authorizing City Manager to Sign Such Change Orders Discussion