Loading...
F.7_Barton Road Streetscape Plan_KTUACity of Grand Terrace City Council Presentation January 12, 2021 Jacob Leon, KTUA Project Manager •The Barton Road Streetscape Plan (Plan) will help guide the City to implement . •The Plan as new projects are discussed and/or implemented such as active transportation, urban greening, or commercial and mixed-used developments. •Will include . •Barton Road is being transformed into a corridor that will and at any of the numerous destinations found along and adjacent to the corridor. •Recent transportation efforts were completed as part of a partnership with Caltrans. These include a roundabout, signage, landscaping, and sidewalk improvement, all of which support the efforts presented in this Plan. Barton Road Vivienda AvenueMt. Vernon AvenueArlissDriveCanal Street The MIDAS Program clearly outlines the city’s ambitious goals for Grand Terrace’s future. Barton Road serves as a gateway to the city at large and to other proposed projects such as: ●Grand Terrace Town Square ●The Gateway (Lewis Project) ●Barton & Vivienda Parcels ●Gage Canal Class 1/Linear Park ●Update to Barton Road Specific Plan. Barton Road is an arterial street that provides vital connections to destinations throughout the city. Existing conditions include: •Bi-directional travel, two lanes each direction with a center turn lane o Traffic counts: close to 30,000 ADT •Traffic signals at key intersections•Relatively consistent right-of-way of 72-74 feet curb-to-curb•Sidewalks and planted parkways•Street lighting •Site map for general comments •Interactive display boards •Prize wheel for participating ●Enhanced sidewalks (pavers, brick, or concrete score patterns) ●Street trees and landscaping ●Sidewalk art, where possible ●Wayfinding signage ●Gateway monument ●Pedestrian-scale lighting What did we hear? •Streetscape design concepts based on feedback collected by community/City. Two major design themes: o Concept 1 includes the section between Vivienda Avenue and Canal Street. o Concept 2 includes the section between Canal Street and Arliss Drive.•The designs vary slightly to create a unique environment for those travelling through the corridor.•They build upon the design precedent set by the recent Caltrans improvements at the Interstate 215 interchange. •Final design decisions and implementation will be decided when the City sees the opportunity i.e., new development project. ●Enhanced crossings (stamped-brick patterns) ●Black metal materials (lighting, signage) ●Landscaping ●Variety of rock textures and colors ●Mountain silhouette Inspiration: Barton Road and I-215 Features Barton Road Vivienda AvenueMt. Vernon AvenueArlissDriveCanal Street ●Encompasses the section of Barton Road between Vivienda Avenue and Canal Street. ●Provides access to Grand Terrace Town Square Center and other ongoing projects such as “Canal Square.” ●Recommendations include enhanced sidewalk pavement, street trees that provide shade while minimizing business visual obstruction, new parkway landscaping, pedestrian-scale lighting, and other outdoor furnishings where appropriate. Concept 1 Concept 1 1 2 3 4 1 2 3 4 Street trees Enhanced landscaping in parkway Enhanced sidewalk paving pattern Pedestrian-scale lighting with banner option Concept 1 Concept 1 1-2 Years of Tree Growth Concept 1 5 Years of Tree Growth Concept 1 10 Years of Tree Growth Concept 1 Concept 1 Concept 1 Barton Road Vivienda AvenueMt. Vernon AvenueArlissDriveCanal Street ●Encompasses the section between Canal Street and Arliss Drive. ●Provides access to multiple shopping centers. ●Recommendations include enhanced sidewalk pavement, street trees, new parkway landscaping, pedestrian-scale lighting, and other outdoor furnishings where appropriate. ●Gateway opportunity in a proposed center media between Mt. Vernon Avenue and Arliss Drive. Concept 2 Concept 2 1 2 3 4 1 2 3 4 Street trees Enhanced landscaping in parkway Enhanced sidewalk paving pattern Pedestrian-scale lighting with banner option Concept 2 Concept 2 1-2 Years of Tree Growth Concept 2 5 Years of Tree Growth Concept 2 10 Years of Tree Growth Concept 2 Concept 2 Concept 2 Supporting Features Supporting Features Supporting Features Supporting Features Gateway Opportunity: East End of Barton Road Gateway Opportunity: East End of Barton Road •Barton Road has the potential to be into a corridor with a The city can leverage new development projects to help implement this. •The between Vivienda Avenue and Arliss Drive is a major win in terms of “implementability.” •It’s an exciting time for Grand Terrace! •Team will make necessary edits to graphics and information presented in the report. •Funding sources will be included in the final report: i.e. •can be leveraged to help implement improvements along Barton Road. Happy to answer any questions you may have. Thank you! City of Grand Terrace City Council Presentation January 12, 2021 Jacob Leon, KTUA Project Manager