Loading...
Azure Hills Seventh Day Adventist Church 1983-32-1 .,-__ , AGREEMENT Contract GTC#83-32-1 - G This AGREEMENT, made and entered into this 26th day of January , 1984, by and between the CITY OF GRAND TERRACE, hereinafter referred to as "City", and the AZURE HILLS SEVENTH DAY ADVENTIST CHURCH, hereinafter referred to as "Church". 3 WHEREAS, the City and the Church entered into an Agreement on October 26, 198, in which the Church granted the City access for ingress and egress purposes to City 's fire station for emergency vehicles and the City agreed to certain improvements, and WHEREAS, bids received on January_10, 1984,- for said improvements are " considerably higher than estimated, NOW, THEREFORE, the City and the Church mutually agree to amend Paragraphs 3 and 4 of the "Covenants" of the original Agreement (GTC83-32) as follows: "3. Church's Share of Construction Costs. Church agrees to reimburse City for the Church's share of the total cost of said improvements as shown on the attached Exhibit "B", revised as of January 26, 1984, within thirty (30) days after receipt of an itemized statement as presented by the contractor constructing and installing said improvements, to Church from City." "4. Cost Over Estimate. City agrees that the costs of said improvements shall not exceed the costs shown on the revised Exhibit "B" and the summary sheet attached thereto." IN WITNESS WHEREOF, the parties hereto have executed this Agreement on the date and year first above written. "CHURCH" "CITY" Azure Hills Seventh Day City of Grand Terrace Adventis Church By ' A- By \\,\\ k\ ---. Mayor By ae.f,),t—_,d luso c 'r p ATTEST. _ C' `' r (,, „___,__ e-A...exi-'(-7---- ' 7- (2,-,:r, F. City Crk - , Approved as to form ��t - Ci A torney 1/26/84 EXHIBIT "B" (GT083-32-1) 12 242 Revised - Based on Proposal of Lowest Bidder Azure Hills Church Parking Lot - Cost breakdown & allocation Item Unit Item No Description Unit Quantity Price Price Church City 1 Conc block retaining S F 925 9 75 9,018 75 9,018 75 wall--w'ly side of parking lot 2 Conc block ret wall S.F 615 9 75 5,996 25 5,996 25 along bldg 3 Conc curb only 8" L F. 95 7 20 684 00 684 00 along e'ly s/parking lot 4 Conc curb & gutter L F 62 7 50 465 00 465 00 6" per Std 116 5 Conc curb only L F 71 7 20 511 20 511 20 6" parking lot 6 Collar around S D Ea 2 110 00 220 00 220 00 Connection 7 Catch basin - Std Ea 1 4,900 00 4,900 00 4,900 00 Plan No D-72 8 Modify & reinforce Ea 1 640 00 640 00 640 00 exist catch basin 9 12" Dia VCP (Sch L F 116 21 00 2,436 00 2,436 00 40) parking lot 10 8" Dia VCP (Sch. L F 55 21 00 1,155 00 1,155 00 40) Parking lot 11 AC paving, street Ton 11 25 40 279 40 279 40 Barton Rd in front driveway 1/26/84 12 242 Azure Hills Church Parking Lot - Cost Breakdown & allocation Item Unit Item No Description Unit Quantity Price Price Church City 12 Cl 2 Base Material Ton 27 6 55 176 85 176 85 @ D/W on Barton Rd (440 S.F ) 13 AC paving-parking Ton 340 25 40 8,636 00 8,636 00 lot, excl truck i In 14 Cl 2 base, parking Ton 990 6 55 6,484 50 6,484 50 lot excl truck In 15 AC removal parking S F 28,000 0 13 57 14/ 3,640 00 2,079 90 1,560 10 lot, incl truck 42 86 In 16 Conc drive appr S F 450 2 00 25/75 900 00 225 00 675 00 from Barton Rd remove 17 Conc drive appr S F 500 2.15 25/75 1,075 00 268.75 806 25 from Barton Rd replace 18 AC paving - parking Ton 221 25 40 5,613 40 5,613 40 lot, truck lane 19 Cl 2 base mat. Ton 527 6 55 3,451 85 3,451 85 truck In parking lot 20 Guard rail @ L F. 332 8 60 2,855 20 2,855 20 Bldg & easement 21 Relocate light Ea. 1 500 00 500 00 500 00 22 Wheel stops Ea 36 14 00 504 00 504 00 1/26/84 12.242 t Azure Hills Church Parking Lot - Cost Breakdown & allocation Item Unit Item No Description Unit Quantity Price Price Church City 23. Adjust sewer clean Ea 1 215.00 215.00 215 00 out 24 Relocate fence L S. L.S 320 00 320.00 320 00 25 Install li" L.F. 110 1 50 165.00 165.00 Waterline 26 Install 2" L F. 110 4.70 517 00 517 00 Elec conduit 27 Remove stumps L S. L S. 860.00 50/50 860 00 430 00 430.00 28 Earthwork C Y L S 12,530 60 85/ 12,530 60 10,651 01 1,879 59 . 15 29 Striping L S. L $ 200.00 200 00 200 00 74,950 00 53,717 56 21,232 44 Azure Hills Parking Lot 1/12/84 SUMMARY OF COSTS Church City Construction Costs 53,717.56 21,232 44 Engineering Costs 4,525.00 Total Costs 53,717.56 25,757 44 Contingencies 5,371 76 2,575.74 TOTAL COSTS, Est. $ 59,089.22 $ 28,333.18 City Share 32 4% Church Share 67 6%