07-16-2020
CITY OF GRAND TERRACE
PLANNING COMMISSION/SITE AND ARCHITECTURAL REVIEW BOARD
AGENDA
Council ChambersRegular Meeting6:30 PM
Grand Terrace Civic Center
PUBLIC ADVISORY: THE COUNCIL CHAMBER IS NOW OPEN TO THE PUBLIC!!
On June 12, 2020 the County of San Bernardino has decided to move forward with
reopening its Board of Supervisors meetings to the public. The City is following the
the Planning Commission meeting of July 16, 2020 is now
open to the public. Please pursuant to State guidelines, face masks are recommended,
social distancing will be practiced, and occupancy limits will be enforced.
Please note that Pursuant to Section3 of Executive Order N-29-20, issued by Governor
Newsom on March 17, 2020, the regular meeting of the Planning Commission/Site and
Architectural Review Board for July 16, 2020 will also be conducted telephonically
through Zoom and broadcast live on the Cibsite.
If you would like to participate telephonically and speak on an agenda item, you can
access the meeting by dialing the following telephone number and you will be placed in
the waiting room, muted until it is your turn to speak:
*67 1-669-900-9128
Enter Meeting ID: 835 4169 6360
Password: 016264
NOTE: Your phone number will appear on the screen unless you first dial *67
before dialing the numbers as shown above.
The City wants you to know that you can also submit your comments by email to
ccpubliccomment@grandterrace-ca.gov. To give the City Clerk adequate time to
print out your comments for consideration at the meeting, please submit your written
comments prior t
Office at (909) 824-6621 by 5:00 p.m.
If you wish to have your comments read to the Planning Commissioners during the
appropriate Public Comment period, please indicate in the Subje
and list the item number you wish to comment on. Comments that you
want read to the Planning Commission will be subject to the three minute time limitation
(approximately 350 words).
Pursuant to the Executive Order, and in compliance with the Americans with Disabilities
Act, if you need special assistance to participate in the Planning Commission/Site and
-
6621 within 48 hours of the meeting.
City of Grand TerracePage 1
Agenda Grand Terrace Planning Commission/Site and Architectural Review Board July 16, 2020
The City of Grand Terrace thanks you in advance for taking all precautions toprevent
spreading the COVID-19 virus.
CALL TO ORDER
Convene the Meeting of the Planning Commission and Site and Architectural Review
Board.
PLEDGE OF ALLEGIANCE
ROLL CALL
Attendee Name Present Absent Late Arrived
Chairman Edward A. Giroux
Vice-Chairman Jeremy Briggs
Commissioner Jeffrey McConnell
Vacant
Vacant
APPROVAL OF AGENDA
PUBLIC ADDRESS
Public address to the Commission shall be limited to three minutes unless extended by
the Chairman. Should you desire to make a longer presentation, please make written
request to be agendized to the Director of Planning and Development Services.
This is the opportunity for members of the public to comment on any items not
appearing on the regular agenda. Because of restrictions contained in California Law,
the Planning Commission may not discuss or act on any item not on the agenda but
may briefly respond to statements made or ask a question for clarification. The
Chairman may also request a brief response from staff to questions raised during public
comment or may request a matter be agendized for a future meeting.
City of Grand Terrace Page 2
Agenda Grand Terrace Planning Commission/Site and Architectural Review Board July 16, 2020
A.CONSENT CALENDAR
1. Approval of Minutes Regular Meeting 05/21/2020
DEPARTMENT: CITY CLERK
2. Approval of Minutes Regular Meeting 06/18/2020
DEPARTMENT: CITY CLERK
B.ACTION ITEMS
None.
C.PUBLIC HEARINGS
1. Conditional Use Permit 19-01, Site and Architectural Review 19-03 and Environmental
19-05; a Proposal to Establish a Trailer/Container Storage Facility, Located 520 Feet
from Vivienda Avenue and South of the Santa Ana River Tail (APN's: 0275-191-06 and
0275-191-30) (Continued from 5-21-2020 and 6-18-2020)
RECOMMENDATION:
1) Conduct a public hearing; and
2) Consider Adoption of A RESOLUTION OF THE PLANNING COMMISSION/SITE
AND ARCHITECTURAL REVIEW BOARD OF THE CITY OF GRAND
TERRACE, CALIFORNIA, ADOPTING A MITIGATED NEGATIVE
DECLARATION (ENVIRONMENTAL 19-05) PURSUANT TO THE
CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) AND APPROVING
CONDITIONAL USE PERMIT 19-01 AND SITE AND ARCHITECTURAL
REVIEW 19-03 TO DEVELOP A TRAILER/CONTAINER STORAGE FACILITY
FOR A MAXIMUM OF 650 PARKING SPACES FOR EMPTY SEMI-TRAILERS,
SHIPPING AND STORAGE CONTAINERS, AND CHASSIS USE ON A 21.92-
-191-06 AND
0275-191-30 IS CURRENTLY UNDEVELOPED AND IS LOCATED
APPROXIMATELY 520 FEET NORTH OF VIVIENDA AVENUE AND SOUTH
OF THE SANTA ANA RIVER TRAIL IN THE NORTHWESTERN PORTION OF
THE CITY
DEPARTMENT: PLANNING & DEVELOPMENT SERVICES
City of Grand Terrace Page 3
Agenda Grand Terrace Planning Commission/Site and Architectural Review Board July 16, 2020
D.PRESENTATIONS
1. Presentation Regarding Nonconforming Use & Building Regulations in the Grand
Terrace Municipal Code, and Nonconforming Uses & Buildings in Grand Terrace
RECOMMENDATION:
Receive and file.
DEPARTMENT: PLANNING COMMISSION/SITE AND ARCHITECTURAL REVIEW
BOARD
E. INFORMATION TO COMMISSIONERS
F. INFORMATION FROM COMMISSIONERS
ADJOURN
Adjourn to the next scheduled meeting of the Site and Architectural Review
Board/Planning Commission to be held on August 6, 2020 at 6:30 p.m.
City of Grand Terrace Page 4
A.1
CITY OF GRAND TERRACE
PLANNING COMMISSION/SITE AND ARCHITECTURAL REVIEW BOARD
MINUTES
Council ChambersRegular Meeting6:30 PM
CALL TO ORDER
Vice-Chair Edward Giroux convened the Regular Meeting of the Planning and
Commission/Site and Architectural Review Board for Thursday, May 21, 2020.
PLEDGE OF ALLEGIANCE
The Pledge of Allegiance was led by Commissioner Jeffrey McConnell.
Attendee NameTitleStatusArrived
Edward A. GirouxVice-ChairPresent
Tara CesenaCommissionerPresent
Jeffrey McConnellCommissionerPresent
Jeremy BriggsCommissionerPresent
David AlanizCommissionerPresent
Steven WeissPlanning & Development Services DirectorPresent
Robert KhuuAssistant City AttorneyPresent
Haide AguirreAssistant PlannerPresent
Debra ThomasCity ClerkPresent
INSTALLATION OF COMMISSIONER
David Alaniz, newly appointed Planning Commissioner was administered the Oath of
Office by Debra Thomas, City Clerk.
SELECTION OF NEW OFFICERS
1.Motion:Nomination for Chairperson
Commissioner Briggs moved, with a second by Jeffrey McConnell, to nominate Vice-
Chair Edward Giroux to serve as the Planning Commission Chairman.
City of Grand TerracePage 1
Packet Pg. 5
A.1
Minutes Grand Terrace Planning Commission/Site and Architectural Review Board May 21, 2020
RESULT: ADOPTED \[UNANIMOUS\]
MOVER: Jeremy Briggs, Commissioner
SECONDER: Jeffrey McConnell, Commissioner
AYES: Giroux, Cesena, McConnell, Briggs, Alaniz
2. Motion: Nomination for Vice-Chair
Commissioner McConnell moved to nominate Commissioner Jeremy Briggs to serve as
Vice-Chair.
Commissioner Cesena made a substitute motion to nominate herself to serve as Vice-
Chair.
Robert Khuu, Assistant City Attorney explained to the Planning Commission how the
process works when a substitute motion is made before a second is received on the
original motion
first.
dies due to lack of a second.
Commissioner McConnell moved, with a second from Commissioner Jeremy Briggs, to
nominate Commissioner Jeremy Briggs to serve as Vice-Chair.
RESULT: ADOPTED \[3 TO 2\]
MOVER: Jeffrey McConnell, Commissioner
SECONDER: Jeremy Briggs, Commissioner
AYES: Edward A. Giroux, Jeffrey McConnell, Jeremy Briggs
NAYS: Tara Cesena, David Alaniz
RECESS FOR REORGANIZATION
Chairman Giroux recessed the regular meeting of the Planning Commission/Site and
Architectural Review Board at 6:38 p.m.
Chairman Giroux reconvened the regular meeting of the Planning Commission/Site and
Architectural Review Board at 6:56 p.m.
Minutes Acceptance: Minutes of May 21, 2020 6:30 PM (CONSENT CALENDAR)
APPROVAL OF AGENDA
Motion: Motion: May 21, 2020 Approval of Agenda
City of Grand Terrace Page 2
Packet Pg. 6
A.1
Minutes Grand Terrace Planning Commission/Site and Architectural Review Board May 21, 2020
RESULT: ADOPTED \[4 TO 0\]
AYES: Edward A. Giroux, Tara Cesena, Jeffrey McConnell, Jeremy Briggs
ABSTAIN: David Alaniz
PRESENTATIONS
None.
PUBLIC ADDRESS
None.
A.CONSENT CALENDAR
1. Approval of Minutes Special Meeting 10/24/2019
RESULT: ACCEPTED \[4 TO 0\]
MOVER: Jeremy Briggs, Commissioner
SECONDER: Tara Cesena, Commissioner
AYES: Edward A. Giroux, Tara Cesena, Jeffrey McConnell, Jeremy Briggs
ABSTAIN: David Alaniz
2. Approval of Minutes Special Meeting 12/12/2019
RESULT: ACCEPTED \[4 TO 0\]
MOVER: Jeremy Briggs, Commissioner
SECONDER: Tara Cesena, Commissioner
AYES: Edward A. Giroux, Tara Cesena, Jeffrey McConnell, Jeremy Briggs
ABSTAIN: David Alaniz
3. Approval of Minutes Regular Meeting 02/20/2020
RESULT: ACCEPTED \[4 TO 0\]
MOVER: Jeremy Briggs, Commissioner
Minutes Acceptance: Minutes of May 21, 2020 6:30 PM (CONSENT CALENDAR)
SECONDER: Tara Cesena, Commissioner
AYES: Edward A. Giroux, Tara Cesena, Jeffrey McConnell, Jeremy Briggs
ABSTAIN: David Alaniz
B.ACTION ITEMS - NONE
None.
City of Grand Terrace Page 3
Packet Pg. 7
A.1
Minutes Grand Terrace Planning Commission/Site and Architectural Review Board May 21, 2020
C.PUBLIC HEARINGS
1. Zoning Code Amendment 20-01 and Specific Plan 20-01 to Amend Title 18 of the
Grand Terrace Municipal Code and Barton Road Specific Plan to Regulate Uses
Proposing Hours of Operation Any Time Between 11:00 P.M. and 6:00 A.M., and a
Related Environmental Determination Pursuant to CEQA Regulation Section
15061(B)(3)
Haide Aguirre, Assistant Planner gave the PowerPoint presentation for this item.
Commissioner Cesena directed Staff to make sure that applicant is provided with the
appeal process spelled out when filing an application for an Administrative CUP/CUP.
and process.
Chairman Giroux opened the public hearing at 7:19 p.m.
Chairman Giroux closed the public hearing at 7:20 p.m.
Staff would like to recommend a modification to the proposed Municipal Code and the
Barton Road Specific Plan Amendments to include the following:
effective date of the
ordinance with operational hours between 11:00 p.m. and 6:00 a.m. are
Commissioner Cesena moves to approve the resolution recommending adoption
of the ordinance to the City Council with the requirement that the above stated
language be included with the ordinance to the extent for both the specific plan
amendment and code amendment and giving staff direction to make sure the
language fits within the larger scheme of the proposed changes.
1) CONDUCT A PUBLIC HEARING, AND
2) ADOPT A RESOLUTION OF THE PLANNING COMMISSION OF
THE CITY OF GRAND TERRACE RECOMMENDING THAT THE CITY
COUNCIL MAKE A DETERMINATION THAT ZONING CODE
Minutes Acceptance: Minutes of May 21, 2020 6:30 PM (CONSENT CALENDAR)
AMENDMENT 20-01 AND SPECIFIC PLAN AMENDMENT 20-01 ARE
EXEMPT, PURSUANT TO SECTION 15061(B)(3) OF TITLE 14 OF THE
CALIFORNIA CODE OF REGULATIONS, FROM THE CALIFORNIA
ENVIRONMENTAL QUALITY ACT; AND RECOMMENDING THAT THE
CITY COUNCIL ADOPT ZONE CODE AMENDMENT 20-01, WHICH
AMENDS CHAPTER 18.06 (DEFINITIONS), CHAPTER 18.33 (C2
GENERAL BUSINESS DISTRICT) SECTION 18.33.020 (PERMITTED
USES) AND SECTION 18.33.030 (CONDITIONAL PERMITTED USES)
OF TITLE 18 OF THE GRAND TERRACE MUNICIPAL CODE, AND
City of Grand Terrace Page 4
Packet Pg. 8
A.1
Minutes Grand Terrace Planning Commission/Site and Architectural Review Board May 21, 2020
RECOMMENDING THAT THE CITY COUNCIL ADOPT SPECIFIC PLAN
AMENDMENT 20-01, WHICH AMENDS THE BARTON ROAD SPECIFIC
PLAN (TABLE I, LAND USE MATRIX) TO ESTABLISH
REQUIREMENTS FOR BUSINESSES PROPOSING TO OPERATE AT
ANY TIME BETWEEN 11:00 P.M AND 6:00 A.M.
RESULT: APPROVED \[UNANIMOUS\]
MOVER: Tara Cesena, Commissioner
SECONDER: Jeremy Briggs, Commissioner
AYES: Giroux, Cesena, McConnell, Briggs, Alaniz
2. Conditional Use Permit 19-01, Site and Architectural Review 19-03 and Environmental
19-05; a Proposal to Establish a Trailer/Container Storage Facility, Located 520 Feet
from Vivienda Avenue and South of the Santa Ana River Tail (APN's: 0275-191-06 and
0275-191-30)
Chairman Giroux and Commissioner McConnell recused themselves from Agenda Item
No. C.1 Conditional Use Permit 19-01, Site and Architectural Review 19-03 and
Environmental 19-05.
Steve Weiss, Planning & Services Development Director gave the PowerPoint
presentation for this item.
Vice-Chairman Briggs opened the public hearing at 8:52 p.m.
David Mlynarski, Transtech, provided a PowerPoint presentation on behalf of the
Applicant and Property Owner, Grand Terrace I.
PUBLIC COMMENT
The following members of the public telephoned through Zoom to express their
opposition to the project:
Mayor Pro Tem Isaac Suchil
Rita Schwartz
Isaac Steinline
Bobbie Forbes
William Mahany
Minutes Acceptance: Minutes of May 21, 2020 6:30 PM (CONSENT CALENDAR)
Debra Thomas, City Clerk, stated for the record that a copy of each email received has
been placed at the dais in front of each Planning Commissioner. The City received
thirteen (13) emails from members of the public in opposition to the project as follows:
Bobbie Forbes
Rob Macias
William Mahaney
Catherine Guthrie
City of Grand Terrace Page 5
Packet Pg. 9
A.1
Minutes Grand Terrace Planning Commission/Site and Architectural Review Board May 21, 2020
Don Smith
Jennifer Katuls
Martha Macias
Juanita Odenbaugh
Javier Montano Sr.
Virginia Fernandez
Janese Makshanoff
John Odenbaugh
Jane Valencia
Bobbie Forbes
William Mahaney
Debra Thomas, City Clerk, stated for the record that a copy of each email received has
been placed at the dais in front of each Planning Commissioner. The City received one
(1) email from a member of the public in opposition to the project as follows:
Khanh Tran
Jeffrey McConnell, Grand Terrace expressed his opposition to the project.
Vice-Chairman Briggs closed the public hearing at 10:45 p.m.
Vice-Chairman Briggs moved, with a second from Commissioner Alaniz to continue the
public hearing to June 18, 2020.
1) CONDUCT A PUBLIC HEARING; AND
2) CONSIDER ADOPTION OF A RESOLUTION OF THE PLANNING
COMMISSION/SITE AND ARCHITECTURAL REVIEW BOARD OF THE CITY
OF GRAND TERRACE, CALIFORNIA, ADOPTING A MITIGATED NEGATIVE
DECLARATION (ENVIRONMENTAL 19-05) PURSUANT TO THE
CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) AND APPROVING
CONDITIONAL USE PERMIT 19-01 AND SITE AND ARCHITECTURAL
REVIEW 19-03 TO DEVELOP A TRAILER/CONTAINER STORAGE FACILITY
FOR A MAXIMUM OF 650 PARKING SPACES FOR EMPTY SEMI-TRAILERS,
SHIPPING AND STORAGE CONTAINERS, AND CHASSIS USE ON A 21.92-
Minutes Acceptance: Minutes of May 21, 2020 6:30 PM (CONSENT CALENDAR)
-191-06 AND
0275-191-30 IS CURRENTLY UNDEVELOPED AND IS LOCATED
APPROXIMATELY 520 FEET NORTH OF VIVIENDA AVENUE AND SOUTH
OF THE SANTA ANA RIVER TRAIL IN THE NORTHWESTERN PORTION OF
THE CITY
RESULT: CONTINUED Next: 6/18/2020 6:30 PM
City of Grand Terrace Page 6
Packet Pg. 10
A.1
Minutes Grand Terrace Planning Commission/Site and Architectural Review Board May 21, 2020
D.INFORMATION TO COMMISSIONERS
None.
E. INFORMATION FROM COMMISSIONERS
Vice-Chairman Briggs requested that the following return to the Planning Commission
for discussion:
Non-conforming grandfather clause and changes to the Municipal Code
Vice-Chairman asked Alan French, Senior Civil Engineer if the parking lot striping at
Richard Rollins park will be completed before organized sports activities.
Engineer French stated it will not happen before July 1, 2020 and will depend on when
funding becomes available.
Commissioner McConnell requested that the following return to the Planning
Commission for discussion:
Educate the applicant and their options when they apply for a CUP, identify the
process
Information on the process for the Planning Commission to bring forward agenda
items to the City Council.
Chairman Giroux requested more training for the Planning Commission as a whole and
asked the Planning Commission if they would agree. He also requested that each
Planning Commissioner return to the next meeting with a list of items each
Commissioner would like to see staff coordinate training on for the Planning
Commission. He also suggested that the Planning Commission participate in regional
training that is held close to the area. Chairman Giroux asked if the Commissioners
would like a copy of Planning Commission duties.
ADJOURN
Minutes Acceptance: Minutes of May 21, 2020 6:30 PM (CONSENT CALENDAR)
Adjourn to the next scheduled meeting of the Site and Architectural Review
Board/Planning Commission to be held on August 15, 2019 at 6:30 p.m.
City of Grand Terrace Page 7
Packet Pg. 11
A.2
CITY OF GRAND TERRACE
PLANNING COMMISSION/SITE AND ARCHITECTURAL REVIEW BOARD
MINUTES
Council ChambersRegular Meeting6:30 PM
CALL TO ORDER
Debra Thomas, City Clerk convened the Regular Meeting of the Planning
Commission/Site and Architectural Review Board for Thursday, June 18, 2020 at 6:30
p.m.
PLEDGE OF ALLEGIANCE
The Pledge of Allegiance was led by Commissioner Tara Ceseña.
Attendee NameTitleStatusArrived
Edward A. GirouxChairmanAbsent
Jeremy BriggsVice-ChairmanAbsent
Tara CeseñaCommissionerPresent
Jeffrey McConnellCommissionerPresent
David AlanizCommissionerPresent
Steven WeissPlanning & Development Services DirectorPresent
Robert KhuuAssistant City AttorneyPresent
Haide AguirreAssistant PlannerPresent
Debra ThomasCity ClerkPresent
Robert Khuu, Assistant City Attorney explained to the Planning Commission that dueto
the absence of ChairmanEd Giroux and Vice-ChairmanJeremy Briggs, it will need to
select a temporary Acting Chair for the June 18, 2020 Planning Commission meeting.
Commissioner Jeffrey McConnell moved, with a second from Commissioner David
Alaniz, to select Commissioner Tara Ceseña as Acting Chair.
RESULT:ADOPTED \[UNANIMOUS\]
MOVER:Jeffrey McConnell, Commissioner
SECONDER:David Alaniz, Commissioner
AYES:TaraCeseña, Jeffrey McConnell, David Alaniz
ABSENT:Edward A. Giroux, Jeremy Briggs
City of Grand TerracePage 1
Packet Pg. 12
A.2
Minutes Grand Terrace Planning Commission/Site and Architectural Review Board June 18, 2020
APPROVAL OF AGENDA
1. Motion: Motion: June 18, 2020 Approval of Agenda
RESULT: ADOPTED \[UNANIMOUS\]
MOVER: Jeffrey McConnell, Commissioner
SECONDER: David Alaniz, Commissioner
AYES: Tara Ceseña, Jeffrey McConnell, David Alaniz
ABSENT: Edward A. Giroux, Jeremy Briggs
PUBLIC ADDRESS
David Mlynarski, asked what options are available to an applicant who has followed all
of the rules, filed applications, has been working with staff in a very cooperative manner,
agreeing to expansion of notification radiuses and other public hearing type requests, in
order to make hearings as broad ranging and as fair as possible. What does an
applicant do when all they are seeking is an expeditious processing of its application? It
appears the body is having difficulty in bringing an item forward. Mr. Mlynarski asked
the City to get back to him and let him know if the body is unable to hold an expeditious
hearing, and what options does an applicant have in order to do so.
Bobbie Forbes, Grand Terrace asked everyone in the Council Chamber to use whatever
power they have to help with the illegal fireworks in town. She asked the community to
phone calls to the non-emergency number
email to the City Clerk if an address is obtained. It is out of control this year and is only
going to get worse in the next three weeks.
rk on
behalf of the community to bring in new business. She also thanked it for notifying the
community and making all of its letters appropriate during this very difficult time. She
appreciates the Planning Commission not rushing its decisions, taking its time, and
Minutes Acceptance: Minutes of Jun 18, 2020 6:30 PM (CONSENT CALENDAR)
making sure new business is right for the City.
City of Grand Terrace Page 2
Packet Pg. 13
A.2
Minutes Grand Terrace Planning Commission/Site and Architectural Review Board June 18, 2020
A.CONSENT CALENDAR
2. Approval of Minutes Regular Meeting 05/21/2020
Robert Khuu, Assistant City Attorney conveyed that staff would like the Consent
Calendar continued to a meeting when there is a full Commission available to have
input.
Commissioner McConnell moved, with a second from Commissioner Alaniz to continue
the Consent Calendar to the next scheduled Planning Commission meeting.
RESULT: ADOPTED \[UNANIMOUS\]
MOVER: Jeffrey McConnell, Commissioner
SECONDER: David Alaniz, Commissioner
AYES: Tara Ceseña, Jeffrey McConnell, David Alaniz
ABSENT: Edward A. Giroux, Jeremy Briggs
B.ACTION ITEMS
None.
C.PUBLIC HEARINGS
1. Conditional Use Permit 19-01, Site and Architectural Review 19-03 and Environmental
19-05; a Proposal to Establish a Trailer/Container Storage Facility, Located 520 Feet
from Vivienda Avenue and South of the Santa Ana River Tail (APN's: 0275-191-06 and
0275-191-30) (Continued from 5-21-2020)
Due to lack of a quorum, this public hearing did not move forward.
RESULT: NO ACTION TAKEN
Minutes Acceptance: Minutes of Jun 18, 2020 6:30 PM (CONSENT CALENDAR)
D.PRESENTATIONS
Non-Conforming Uses and Buildings Update Presented by Haide Aguirre, Assistant
Planner
Steve Weiss, Planning & Development Services Director explained that this item was
requested by the entirety of the Planning Commission. As two (2) members are absent,
staff requested that the item be continued.
City of Grand Terrace Page 3
Packet Pg. 14
A.2
Minutes Grand Terrace Planning Commission/Site and Architectural Review Board June 18, 2020
Commissioner Alaniz moved, with a second from Commissioner McConnell to move the
presentation to the next scheduled Planning Commission meeting.
RESULT: ADOPTED \[UNANIMOUS\]
MOVER: Jeffrey McConnell, Commissioner
SECONDER: David Alaniz, Commissioner
AYES: Tara Ceseña, Jeffrey McConnell, David Alaniz
ABSENT: Edward A. Giroux, Jeremy Briggs
E. INFORMATION TO COMMISSIONERS
None.
F. INFORMATION FROM COMMISSIONERS
Commissioner McConne
Commissioner Alaniz thanked the residents who came out and apologized that they
were not able to hear Agenda Item C.1.
Acting Chair Ceseña also thanked the residents who came out to hear Agenda Item
C.1.
Assistant City Attorney Khuu explained to the residents that due to the lack of a quorum
because Commissioner McConnell has a conflict of interest on Agenda Item C.1, there
would only be two (2) commissioners that could act on the item tonight.
ADJOURN
Adjourn to the next scheduled meeting of the Planning Commission/Site and
Minutes Acceptance: Minutes of Jun 18, 2020 6:30 PM (CONSENT CALENDAR)
Architectural Review Board to be held on July 9, 2020 at 6:30 p.m.
_________________________________ _________________________________
Tara Ceseña, Acting Chair Debra L. Thomas, City Clerk
City of Grand Terrace Page 4
Packet Pg. 15
C.1
AGENDA REPORT
MEETING DATE:July 16, 2020
TITLE:Conditional Use Permit 19-01, Site and Architectural Review
19-03 and Environmental 19-05; a Proposal to Establish a
Trailer/Container Storage Facility, Located 520 Feet from
Vivienda Avenue and Southof the Santa Ana River Tail
(APN's: 0275-191-06 and 0275-191-30) (Continued from 5-
21-2020 and 6-18-2020)
PRESENTED BY:Steven Weiss, Planning & Development Services Director
RECOMMENDATION:Conduct a public hearing; and
2)Consider Adoption of A RESOLUTION OF THE
PLANNING COMMISSION/SITE AND ARCHITECTURAL
REVIEW BOARD OF THE CITY OF GRAND TERRACE,
CALIFORNIA, ADOPTING A MITIGATED NEGATIVE
DECLARATION (ENVIRONMENTAL 19-05) PURSUANT
TO THE CALIFORNIA ENVIRONMENTAL QUALITY ACT
(CEQA) AND APPROVING CONDITIONAL USE PERMIT
19-01 AND SITE AND ARCHITECTURAL REVIEW 19-03
TO DEVELOP A TRAILER/CONTAINER STORAGE
FACILITY FOR A MAXIMUM OF 650 PARKING SPACES
FOR EMPTY SEMI-TRAILERS, SHIPPING AND STORAGE
CONTAINERS, AND CHASSIS USE ON A 21.92-ACRE
EL NUMBERS \[APNs\] 0275-
191-06 AND 0275-191-30 IS CURRENTLY
UNDEVELOPED AND IS LOCATED APPROXIMATELY
520 FEET NORTH OF VIVIENDA AVENUE AND SOUTH
OF THE SANTA ANA RIVER TRAIL IN THE
NORTHWESTERN PORTION OF THE CITY
2030 VISION STATEMENT:
This item supports Goal 3 to Promote Economic Development by establishing a use that
is consistent with the Industrial Zoning District designation.
BACKGROUND:
On Thursday, May 21, 2020, the Planning Commission held a public hearing on
Conditional Use Permit (CUP 19-01), Site and Architectural Review (SA 19-03, filed by
-1, Inc. (Applicant), and a Draft Mitigated Negative Declaration
proposing to develop a trailer/container storage facility located approximately 520 feet
north of Vivienda Avenue and south of the Santa Ana River Trail in the northwestern
Packet Pg. 16
C.1
portion of the City, zoned M2-Industrial with an AG-2-Overlay District and FP-Floodplain
Overlay District (Project). The May 21, 2020 Planning Commission Staff Report is
attached for reference.
The project will provide a maximum of 650 parking spaces on 21.92 acres for semi-
trailers, shipping and storage containers, and chassis. The Project description includes
the future construction of a trailer/office and a light maintenance building, both will be
subject to an administrative conditional use permit review application. All traffic to/from
the site will be routed from Barton Road (from either La Cadena Drive or the I-
215/Barton Road Interchange) onto North Terrace Avenue to the project site.
During the Public Hearing held on May 21, 2020, the Planning Commission, and the
public raised questions about the Project. The Planning Commission then continued
the project to its meeting of June 18, 2020, but the meeting was cancelled due to lack of
quorum. Responses and clarifications to the questions have been included in the
ANALYSIS:
The Planning Commission has the authority to approve the proposed entitlement, as
submitted for its consideration at the May 21, 2020, meeting, proposing to develop a
trailer/container storage, subject to future administrative review and approval by the City
for the office and light maintenance building. The report, and attachments (as amended
and clarified below) from May 21, 2020, meeting are attached to this report.
Further, during the May 21, 2020, meeting there were questions and comments relating
to this Project. The Responses to those questions and comments are included in Table
attached to this report.
Further, the following conditions of approval have been modified:
from 6:00 a.m. to 10:00 p.m. and a total of twelve employees. No business activities
United States Occupational safety and Health Administration (OSHA) to permit an
the noise and frequency of standard back up apparatus. Said apparatus shall be
reviewed and approved by OSHA and the Director of Planning and Development
Services
Condition of Approval No. 16 will be deleted and addressed in the Community Benefits
Agreement.
Packet Pg. 17
C.1
requirements of the San Bernardino County Fire Department, Office of the Fire Marshal
Community Safety Division, including the conditions of approval contained in their
Permit Number: FPLN-2019-00163. The Applicant shall resubmit plans to SBCF as
indicated on the Fire Comments dated October 07, 2019, attached hereto as Exhibit 3.
Condition of Approval No. 26 has been revised. The Santa Ana River Trailhead entry
structure and monument sign size, style, and location shall be reviewed and approved
as identified in the Community Benefit Agreement.
Condition of Approval No. 27 has been included: Project traffic shall continue on
Terrace Avenue and shall not enter residential streets at Vivienda Avenue and Walnut
Avenue.
Condition of Approval No. 29 has been included. The applicant or assignee shall submit
a security camera plan that demonstrates onsite and offsite monitoring. Plan shall be
reviewed and approved by the Planning and Development Services Director prior to the
issuance of a certificate of use and occupancy.
The Conditions of Approval from Building and Safety have been revised since the
construction of the structures will be submitted separately with an administrative
conditional use permit.
ENVIRONMENTAL REVIEW:
Pursuant to the California Environmental Quality Act (CEQA), an Initial Study has been
prepared for the above-described project. Based on the Initial Study and supporting
information, the City intends to adopt a Mitigated Negative Declaration. The project will
not have a significant effect on the environment due to the incorporation of standard
conditions and mitigation measure(s) related to: Biological, Cultural, and Tribal Cultural
Resources, Geology/Soils, and Hydrology/Water Quality.
PUBLIC NOTICE:
The public hearing notice was published in the Grand Terrace City News, posted in
three public places, and mailed to property owners within a 1,500-foot radius of the site.
Fourteen comments were received at the public hearing held on May 21, 2020.
As a courtesy, even though there is no requirement to publish, post and mail a public
hearing notice for a continued item to a date certain. there was concern raised by the
public and the Planning Commission at the May 21, 2020, because of COVID-19
attendance restrictions, that notice lacked clear information whether the public had an
adequate opportunity to physically attend or provide comment or phone in. On June 4,
2020, a subsequent public hearing notice was posted in the Grand Terrace City News
and mailed to property owners describing the date of the continued hearing to June 18,
2020 with COVID restriction and instructions for comment or speaking. As of the
preparation of this staff report, the Council Chambers was still closed to the public and
Packet Pg. 18
C.1
the public hearing was cancelled for lack of quorum.
For the July 16, 2020 Planning Commission, Public Hearing notices have again been
sent to residents and property owners within 1,500 feet from the project site. Notice and
publication were also posted on the City website and the community posting boards and
published in the newspaper. A complete copy of the staff report and environmental
determination is available on the City Website at:
https://www.grandterraceca.gov/departments/planning_development_services
As of the posting of this agenda, thirteen additional comments have been received.
RECOMMENDATION:
Staff recommends the Planning Commission considers adoption of the attached
Resolution approving the project.
ATTACHMENTS:
Resolution_Trailer Container Storage Facility (DOCX)
Exhibits to the Resolution (PDF)
Responses to Comments and Questions (DOCX)
Landscape Enhancement Exhibit (PDF)
17164 truck trailer storage site plan rev 2 (PDF)
05-21-2020 PC Cont SR (PDF)
NOI Commnets from Colton and Responses (PDF)
Asphalt Grindings RAP (Recycled Asphalt Pavement Info.) (PDF)
APPROVALS:
Steven Weiss Completed 07/08/2020 1:59 PM
Robert Khuu Completed 07/08/2020 2:54 PM
Steven Weiss Completed 07/08/2020 2:58 PM
Planning Commission/Site And Architectural Review Board Pending 07/16/2020 6:30
PM
Packet Pg. 19
C.1.a
RESOLUTION NO. 2020-XX
A RESOLUTION OF THE PLANNING COMMISSION/SITE AND ARCHITECTURAL
REVIEW BOARD OF THE CITY OF GRAND TERRACE, CALIFORNIA, ADOPTING A
MITIGATED NEGATIVE DECLARATION (ENVIRONMENTAL 19-05) PURSUANT TO
THE CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) AND APPROVING
CONDITIONAL USE PERMIT 19-01 AND SITE AND ARCHITECTURAL REVIEW 19-
03 TO DEVELOP A TRAILER/CONTAINER STORAGE FACILITY FOR A MAXIMUM
OF 650 PARKING SPACES FOR EMPTY SEMI-TRAILERS, SHIPPING AND
STORAGE CONTAINERS, AND CHASSIS USE ON A 21.92-ACRE SITE
-191-06 AND 0275-191-30 IS
CURRENTLY UNDEVELOPED AND IS LOCATED APPROXIMATELY 520 FEET
NORTH OF VIVIENDA AVENUE AND SOUTH OF THE SANTA ANA RIVER TRAIL IN
THE NORTHWESTERN PORTION OF THE CITY
WHEREAS, the Applicant, Grand T-
develop a trailer/container storage facility (Project). The Project will provide a maximum
of 650 parking spaces for semi-trailers, shipping and storage containers, and chassis
located approximately 520 feet north of Vivienda Avenue and south of the Santa Ana
River trail in the northwestern portion of the City; and
WHEREAS, the site is zoned M2-Industrial within the AG-2 Overlay District, and
the FP-Floodplain Overlay District; and
WHEREAS, pursuant to the California Environmental Quality Act (CEQA), an Initial
Study has been prepared for the above-described Project. Based on the Initial Study and
supporting information, the City intends to adopt a Mitigated Negative Declaration. The
Project will not have a significant effect on the environment due to the incorporation of
standard conditions and mitigation measure(s) related to: Biological, Cultural, and Tribal
Cultural Resources, Geology/Soils, and Hydrology/Water Quality; and
WHEREAS, on May 21, 2020, the Planning Commission conducted a duly noticed
public hearing on the Project at the Grand Terrace Council Chambers located at 22795
Barton Road, Grand Terrace, California 92313; and the Commission continued the
th
Project to the June 18, 2020, Planning Commission meeting; and
WHEREAS, on June 18, 2020, the Planning Commission public hearing was
cancelled due to lack of quorum; and
WHEREAS, on July 16, 2020, the Planning Commission conducted a public
hearing on the Project at the Grand Terrace Council Chambers located at 22795 Barton
Attachment: Resolution_Trailer Container Storage Facility \[Revision 2\] (CUP 19-01, SA 19-03 and E 19-05)
Road, Grand Terrace, California 92313; and
WHEREAS, all legal prerequisites to the adoption of this Resolution have
occurred.
Packet Pg. 20
C.1.a
NOW THEREFORE, BE IT RESOLVED by the Planning Commission of the City
of Grand Terrace:
1. The recitals set forth above are true and correct and incorporated herein by this
reference.
2. Pursuant to the California Environmental Quality Act (CEQA), an Initial Study has
been prepared for the above-described Project. Based on the Initial Study and
supporting information, a Mitigated Negative Declaration (Environmental 19-05)
has been prepared. The Project will not have a significant effect on the
environment due to the incorporation of standard conditions and mitigation
measure(s) under Mitigated Negative Declaration (Environmental 19-05) related
to: Biological, Cultural, and Tribal Cultural Resources, and Geology/Soils. The
Project site is consistent with the applicable general plan designation and all
applicable general plan policies as well as with applicable zoning designation and
regulations, the proposed site is located within city limits measuring no more than
five acres substantially surrounded by urban uses, the Project site has no value as
habitat for endangered, rare or threatened species, the approval of the Project
would not result in any significant effects relating to traffic, noise, air quality, or
water quality, and the site can be adequately served by all required utilities and
public services.
3. Based upon all oral and written comments and reports and presentations made by
City staff and members of the public, including any, attachments and exhibits, the
Planning Commission/Site and Architectural Review Board finds as follows with
respect Conditional Use Permit 19-01:
a. The proposed use will not be detrimental to the health, safety, morals,
comfort or general welfare of the persons residing or working within the
neighborhood of the proposed Project or within the city. The proposed truck
trailer storage facility is consistent with the M2-Industrial zoning, the
Agricultural-2 Overlay, and the Floodplain Overlay District Requirements.
The proposed development plan meets applicable development standards
of the Agricultural-2 Overlay District, including the setbacks required for a
truck storage facility are complementary to surrounding uses. The Applicant
is required to comply with San Bernardino County standards related to the
California Restricted Materials Requirements by the State of California
Department for Ground Water Protection Area to ensure ground water is
not impacted.
b. The proposed use will not be injurious to property or improvements in the
Attachment: Resolution_Trailer Container Storage Facility \[Revision 2\] (CUP 19-01, SA 19-03 and E 19-05)
neighborhood or within the city. The proposal does not include any site
improvements at this time; however, the proposed use will be compliant with
applicable Grand Terrace Municipal Codes and standards established by
the underlying zoning and overlay districts. The Project has been
Packet Pg. 21
C.1.a
conditioned to obtain a legal access easements from adjacent property
owners including the site improvements required by the San Bernardino
County Fire, Riverside Highland Water improvements, and prior to obtaining
a Certificate of Occupancy, and initiating any activities on site. Conditions
of Approval have been established regulating activities and use will not be
injurious to the property or the neighborhood. The proposed use will be
consistent with the latest adopted General Plan. The Project is consistent
with the intended land uses of the City and the Municipal Code. The
proposed site is zoned M2-industrial with and AG-2 Agricultural-2 Overlay
District and FP-Flooding Overlay District. The proposed truck storage
facility is consistent with the latest adopted General Plan and Zoning Code,
which conditionally allows a trailer storage facility. The proposed trailer
storage facility will be consistent with the Land Use Element because it
promotes economic development and reduces trailers from parking in
unauthorized neighborhoods. As provided below, the Applicant has
voluntarily agreed to carry out and pay for certain community benefits
outside the scope of a standard development plan with amenities such as
a Community Garden with a grove of fruit trees; a trail connection to the
Santa Ana River Trail with an ornate sign, access road improvements and
a teaching amphitheater at Fitness Park. The Applicant has also voluntarily
committed to making a monetary donation for future City street
maintenance.
c. The use is consistent with the Industrial zoning designation and compatible
with other surrounding uses.
d. Conditions necessary to secure the purposes of the Grand Terrace
Municipal Code and General Plan have been applied to the Project.
4. Based upon all oral and written comments and reports and presentations made by
City staff and members of the public, including any, attachments and exhibits, the
Planning Commission/Site and Architectural Review Board finds as follows with
respect to Site and Architectural Review 19-03:
a. The Project is consistent with the intent of the Grand Terrace Municipal Code
and General Plan. The proposed truck trailer storage facility is consistent with
the General Plan Floodplain Industrial designation which supports storage and
distribution facilities. Regulations allow uses to operate free of overly excessive
noise, dust, odor or other nuisances. The Project is consistent with the Land
Use Element to provide for a mix of industrial land uses designed to generate
employment opportunities while promoting non-polluting industry within the
present land use pattern. The Project is consistent with the Circulation Element
Attachment: Resolution_Trailer Container Storage Facility \[Revision 2\] (CUP 19-01, SA 19-03 and E 19-05)
which provides for the current and long-term efficient movement of people and
goods within and through the City, including a well-maintained roadway system
within the ultimate right-of-way along the street frontage. Terrace Avenue will
provide main access to the Project site and a no truck access sign will be place
Packet Pg. 22
C.1.a
at Vivienda Avenue and Walnut Avenue to keep traffic away from the residential
neighborhoods. The Project will comply with the Noise Element which goal is to
protect the residents from excessive noise. The site will be utilized for storage
and light maintenance and inspections; therefore, the Project will not cause
significant noise impacts to adjacent neighborhoods. In compliance with the
Open Space and Conservation Element, the Applicant has prepared a Water
Quality Management Plan and a Preliminary Soils Engineering Investigation
Report.
The Project complies with the Municipal Code, M2-Industrial Zoning which
supports various manufacturing and industrial uses to operate free of overly
excessive noise, dust, odor or other nuisances and can be made compatible to
other (nonindustrial) district. The proposed truck storage facility is consistent
with the zoning designation and will not create significant impacts to the
adjacent uses. The site will be developed in compliance with the Municipal
Code, Floodplain requirements and subject to the regulation of the review and
approval of the Federal emergency Management Agency (FEMA).
b. The location and configuration of the development plan associated with this
Project are visually harmonious with this site and surrounding sites and
structures, that they do not interfere with the neighbors' privacy, that they do
not unnecessarily block scenic views from other structures and/or public areas
and are in scale with the townscape and natural landscape of the area.
c. The architectural design of structures, their materials, and colors are visually
harmonious with the surrounding development, natural landforms, are
functional for the Project and are consistent with the Grand Terrace Municipal
Code. The proposed structures for future development will be reviewed with
an Administrative Conditional Use Review Application and will be compliant
with the general architectural guidelines for all development established by the
M2-Industrial and Flooding Zoning.
d. The plan for landscaping and open spaces provides a functional and visually
pleasing setting for the structures on this site and is harmonious with the natural
landscape of the area and nearby developments. The Applicant is proposing
landscape on the west side of the property, along Vivienda Avenue and
perimeter fencing covered with vines. The streetscape will include drought
tolerant planting and trees compliant with the Municipal Code requirements and
with the most recent Model Water Efficient Landscape Ordinance by the State
of California. Overall, the landscaping and open spaces will be visually
pleasing, harmonious within the Agricultural-2 Overlay zoning and provide
functionality for the community. The Project also includes improvements
Attachment: Resolution_Trailer Container Storage Facility \[Revision 2\] (CUP 19-01, SA 19-03 and E 19-05)
outside the scope of a standard development plan with amenities such as a
Community Garden with a grove of fruit trees; a trail connection to the Santa
Ana River Trail with an ornate sign, access road improvements and a teaching
amphitheater at Fitness Park.
Packet Pg. 23
C.1.a
e. There is no indiscriminate clearing of property, destruction of trees or natural
vegetation or the excessive and unsightly grading of hillsides, thus the natural
beauty of the City, its setting and natural landforms are preserved.
f. The design and location of all signs associated with this Project are consistent
with the scale and character of the building to which they are attached or
otherwise associated with and are consistent with the Grand Terrace Municipal
Code.
g. Conditions of approval for this Project necessary to secure the purposes of the
Grand Terrace Municipal Code and General Plan have been applied to the
Project.
BE IT FURTHER RESOLVED that, based on the forgoing, upon all oral and written
comments and reports and presentations made by City staff and members of the public,
including any, attachments and exhibits, Environmental 19-05, Conditional Use Permit
19-01, and Site and Architectural Review 19-03 are hereby approved subject to the
following conditions:
1. Conditional Use Permit 19-01 is approved to conduct truck trailer storage of empty
trailers on a 21-acre property located approximately 520 feet north of Vivienda
Avenue and south of the Santa Ana River trail in the northwestern portion of the
city. This approval is granted based on the application materials submitted by GT-
received March 3, 2020. This approval includes development of a trailer/container
storage facility. The Project will provide a maximum of 650 parking spaces for
semi-trailers, shipping and storage containers, and chassis. The application
materials are approved as submitted and conditioned herein and shall not be
further altered except as modified by these conditions of approval and mitigation
measures, and unless reviewed and approved by the affected departments.
2. Prior to issuance of a certificate of use and occupancy, the Applicant has
voluntarily agreed to and shall enter into a Community Benefit Agreement (CBA)
with the City, subject to City Attorney approval as to form, in which the Applicant
will pay for and provide certain community amenities to the City. For the purposes
of the CBA, such community amenities shall include, but not be limited to, a
Community Garden located on a portion of the property with raised community
garden beds and a grove of fruit trees and related improvements, including, but
not limited to, the provision of water to such garden and access road
improvements; a pedestrian trail connection to the Santa Ana River Trail with an
ornate sign and related improvements, including, but not limited to, access road
Attachment: Resolution_Trailer Container Storage Facility \[Revision 2\] (CUP 19-01, SA 19-03 and E 19-05)
improvements; a teaching amphitheater at the Grand Terrace Fitness Park
(located at 21937 Grand Terrace Road, Grand Terrace, CA 92313) and related
improvements; and a monetary donation for future City streets maintenance in an
Packet Pg. 24
C.1.a
amount to be provided in aCommunity Benefit Agreement for City Council
consideration and approval.
3. The proposed business hours will be Monday thru Friday from 6:00 a.m. to 10:00
p.m. and a total of twelve employees. No business activities shall be conducted
after 10:00 p.m. except for emergency purposes only.
th
4. If not appealed, this approval shall become effective on the eleventh (11) day
thth
following such eleventh (11) day when the eleventh (11) day is not a city
business day. This approval shall expire twelve (12) months from the date of
adoption of this resolution unless building permits have been issued and a
substantial investment in reliance of those permits has occurred; all conditions of
approval have been met; or a time extension has been granted by the City, in
accordance with Chapter 18.63 of the Zoning Code. Time extensions shall be filed
at least sixty (60) days prior to the expiration date.
5. Minor modifications to this approval which are determined by the Planning and
Development Services Director to be in substantial conformance with the approved
site plan, and which do not intensify or change the use or require any deviations
from adopted standards, may be approved by the Planning and Development
Services Director upon submittal of an application and the required fee consistent
with the Grand Terrace Municipal Code.
6. The Applicant shall defend, indemnify, and hold harmless the City of Grand
Terrace and its officers, employees, and agents from and against any claim,
action, or proceeding against the City of Grand Terrace, its officers, employees,
or agents to attack, set aside, void, or annul any approval or condition of approval
of the City of Grand Terrace concerning this Project, including but not limited
to any approval or condition of approval of the Planning Commission, or
Planning and Development Services Director. The City shall promptly notify the
Applicant of any claim, action, or proceeding concerning the Project and the
City shall cooperate fully in the defense of the matter. The City reserves the
right, at its own option, to choose its own attorney to represent the City, its
officers, employees, and agents in the defense of the matter.
7. Upon approval of these conditions and prior to becoming final and binding, the
content shall be prepared by the Planning and Development Services Department.
8. Under no condition shall there be stockpiling of material prior to the issuance of
the first grading permit and related conditions of approval for the grading permit.
Attachment: Resolution_Trailer Container Storage Facility \[Revision 2\] (CUP 19-01, SA 19-03 and E 19-05)
9. If exhibits, and written conditions are inconsistent, the written conditions shall
prevail.
Packet Pg. 25
C.1.a
10.The Applicant or authorized agent shall apply to the United States Occupational
Safety and Health Administration (OSHA) to permit an alternative to back up
se and
frequency of standard back up apparatus. Said apparatus shall be reviewed and
approved by OSHA and the Director of Planning and Development Services prior
to the issuance of the first certificate of use and occupancy
11. Heavy maintenance of trailers shall be strictly prohibited.
12. Operational activities associated with the Project shall comply with the regulations
Code.
13. The Applicant shall comply with all applicable Federal, State, County and Local
Codes, at all times.
14. The Applicant shall obtain legal and physical access across adjacent properties to
the public roadway, which may include Railroad Access Road or utilize the
enda Avenue, and shall include access rights for the
City for the purpose of allowing access for all City vehicles, including police, fire,
and other emergency vehicles. The document(s) recording the road access
easement shall be prepared by the Applicant for review and approval by the City
Engineer prior to recordation. The Vivienda Avenue legal access improvements
shall be determined and reviewed by the City Engineer.
15. Access rights shall be granted to the City for the purpose of allowing access over
private drives within the development for all City vehicles, including police, fire, and
other emergency vehicles. The document(s) recording this access shall be
prepared by the Applicant for review and approval by the City Engineer, prior to
recordation.
16. Prior to the issuance of a grading permit, the Applicant shall obtain written legal
and physical access rights, by way of easement(s) or other similar document(s),
(i) from Southern California Edison for Project activities, including, but not limited
to, construction, use, access, trailer storage, and related activities; (ii) from
Southern California Edison for all activities associated with the Community
Garden, including, but not limited to, construction and maintenance thereof by the
Applicant and City, and use and access thereof by the public and the City; (iii) from
San Bernardino County Flood Control District for a pedestrian trail connection to
the Santa Ana River Trail and related activities, including, but not limited to,
construction and maintenance thereof by the Applicant and City, and use and
access thereof by the public and the City, and construction and maintenance of
Attachment: Resolution_Trailer Container Storage Facility \[Revision 2\] (CUP 19-01, SA 19-03 and E 19-05)
any related signage by the Applicant and City; and (iv) from Burlington Northern
Santa Fe Railroad for the purpose legal and physical access across adjacent
properties to the public roadway pursuant to Conditions 11 and 12. Such
easement(s) or other similar document(s) permission contemplated by this
Packet Pg. 26
C.1.a
Condition 13 shall be subject to review and approval by the City Engineer and shall
be recorded with the San Bernardino County Assessor-Recorder-
office
17. Division and
shall be renewed annually for as long as the business remains in operation
18. The Applicant shall comply with all requirements of the City of Grand Terrace
Building and Safety Division, including the conditions of approval contained in the
1.
19. The Applicant shall comply with all requirements of the City of Grand Terrace
Public Works Director, including the conditions of approval contained in the
20. The Applicant shall comply with all requirements of the San Bernardino County
Fire Department, Office of the Fire Marshal Community Safety Division, including
the conditions of approval contained in their Permit Number: FPLN-2019-00163.
The Applicant shall resubmit plans to SBCF as indicated on the Fire Comment
dated October 07, 2019, attached hereto as Exhibit 3.
21. Prior to the issuance of a Certificate of Occupancy by the Building and Safety
Division, the Applicant shall provide a will service letter and obtain all requisite
permits and clearances from Riverside Highland Water Company (RHWCO).
22. Prior to obtaining clearances form the San Bernardino County Fire Department,
Office of the Fire Marshal Community Safety Division and clearances from the
Riverside Highland Water Company (RHWCO) shall be completed.
23. Prior to the issuance of building permits, the Applicant shall obtain all clearances
from Burrtec for trash collection services.
24. Prior to the issuance of building permits, the Applicant shall comply with all the
requirements of the City of Colton Water and Wastewater Department, relating to
sewer service requirements.
25. The Applicant or assignee shall provide a Project delivery staging and operating
schedule to the City for the purpose of avoiding stacking of trucks and trailers at
major City intersections. The schedule shall be submitted for review and approval
by the Planning and Development Services Department on a quarterly basis for
the first three calendar years of operation commencing on the date that the Project
Attachment: Resolution_Trailer Container Storage Facility \[Revision 2\] (CUP 19-01, SA 19-03 and E 19-05)
use begins operating.
Packet Pg. 27
C.1.a
26.The Applicant shall avoid truck or trailer movement during Grand Terrace traffic
peak hours between 6:30 a.m. to 8:30 a.m. and 4:30 p.m. and 6:30 p.m. Truck
stacking from Terrace Avenue to Barton Road shall be prohibited.
27. Project truck traffic shall continue exclusively on Terrace Avenue and shall not
enter residential streets at Vivienda Avenue and Walnut Avenue.
28. The Planning and Development Services Director shall periodically evaluate the
Project use to ensure it is operated in a manner consistent with the conditions of
approval, including the mitigation measures included in the initial study dated
March 2020. If adverse traffic impacts are identified, the Conditional Use Permit
shall be reviewed, pursuant to Section 18.83.032 (Revisions or modifications).
29. The trash enclosure shall be no less than six feet in height, constructed of
decorative block walls, with solid metal gates attached to posts, embedded in
concrete.
30. The Applicant shall comply with the Mitigation Measures included on the Mitigation
Monitoring and Reporting Program Checklist of the Initial Study dated March 2020,
attached hereto as Exhibit 4.
a. Biological Resources, BIO-1
b. Cultural Resources, CUL-1
c. Geology and Soils, GEO-1
d. Hydrology and Water Quality, SC HYD-1, 2, & 3
e. Tribal Cultural Resources, TRC-1
31. The Applicant shall comply with the following Hydrology and Water Quality
Conditions included on the Initial Study:
SC HYD-1: Prior to the issuance of a grading permit, the Project Applicant shall
file and obtain a Notice of Intent (NOI) with the Regional Water Quality Control
Board (RWQCB) in order to be in compliance with the State National Pollutant
Discharge Elimination System (NPDES) General Construction Storm Water Permit
for discharge of surface runoff associated with construction activities. Evidence
Number) shall be submitted to the City of Grand Terrace for coverage under the
NPDES General Construction Permit. The NOI shall address the potential for an
extended and discontinuous construction period based on funding availability. This
measure shall be implemented to the satisfaction of the Director of the City
Engineering Division of the Public Works Department or designee.
SC HYD-2: Prior to the issuance of a grading permit, the Project Applicant shall
Attachment: Resolution_Trailer Container Storage Facility \[Revision 2\] (CUP 19-01, SA 19-03 and E 19-05)
submit to the City of Grand Terrace a Storm Water Pollution Prevention Plan
(SWPPP). The SWPPP shall include a surface water control plan and erosion
control plan citing specific measures to control onsite and offsite erosion during
the entire grading and construction period. In addition, the SWPPP shall
Packet Pg. 28
C.1.a
emphasize structural and nonstructural Best Management Practices (BMPs) to
control sediment and nonvisible discharges from the site. The SWPPP shall
include inspection forms for routine monitoring of the site during both the grading
and construction phases to ensure National Pollutant Discharge Elimination
System (NPDES) compliance and that additional BMPs and erosion control
measures will be documented in the SWPPP and utilized if necessary. The
SWPPP shall address the potential for an extended and discontinuous
construction period based on funding availability. The SWPPP shall be kept on site
for the entire duration of Project construction and shall be available to the local
RWQCB for inspection at any time. BMPs to be implemented may include the
following:
Sediment discharges from the site may be controlled by the following:
sandbags, silt fences, straw wattles and temporary basins (if deemed
necessary), and other discharge control devices. The construction and
condition of the BMPs shall be periodically inspected during construction,
and repairs shall be made when necessary as required by the SWPPP.
Materials that have the potential to contribute to nonvisible pollutants to
storm water must not be placed in drainage ways and must be contained,
elevated, and placed in temporary storage containment areas.
All loose piles of soil, silt, clay, sand, debris, and other earthen material shall
be protected in a reasonable manner to eliminate any discharge from the
site. Stockpiles shall be surrounded by silt fences and covered with plastic
tarps.
In addition, the construction contractor shall be responsible for performing
and documenting the application of BMPs identified in the SWPPP. Weekly
inspections shall be performed on sandbag barriers and other sediment
control measures called for in the SWPPP. Monthly reports and inspection
logs shall be maintained by the contractor and reviewed by the City of Grand
Terrace and the representatives of the State Water Resources Control
Board. In the event that it is not feasible to implement specific BMPs, the
City of Grand Terrace can make a determination that other BMPs will
provide equivalent or superior treatment either on or off site.
This measure shall be implemented to the satisfaction of the Director of the City
of Grand Terrace Engineering Division of the Public Works Department or his/her
designee.
SC HYD-3: Prior to issuance of a grading permit, the Project Applicant shall submit
evidence to the City that the Low Impact Development (LID) Best Management
Practices (BMPs) specified in the Final Water Quality Management Plan
(Preliminary WQMP) approved by the City of Grand Terrace shall be written into
Attachment: Resolution_Trailer Container Storage Facility \[Revision 2\] (CUP 19-01, SA 19-03 and E 19-05)
the grading and development plans submitted to the City for review and approval
to manage water quality and hydrologic effects of the proposed Project.
Specifically, the LID BMPs shall be implemented to ensure the Project meets or
exceeds the minimum design capture volume of the site.
Packet Pg. 29
C.1.a
Periodic maintenance of LID BMPs during Project occupancy and operation shall
be in accordance with the schedule outlined in the Final WQMP. This measure
shall be implemented to the satisfaction of the Director of the City Engineering
Division of the Public Works Department or designee.
32. Prior to the issuance of a certificate of Use and Occupancy, the Applicant shall
submit three (3) copies of landscape and irrigation plan to the Planning and
Development Services Department for review and approval. The landscape and
Landscape Ordinance (Chapter 15.56) Landscaping Standards contained in
Chapter 18.60 of the Zoning Code, in compliance with the most recent version of
the State Model Ordinance, and the Landscape Enhancement Exhibit, which is
attached hereto as Exhibit 5. The plans shall demonstrate the following:
a. The proposed parkway trees shall comply with the list of approved trees
contained on Chapter 12.28 Street and Parkway Trees of the Municipal
Code.
b. Ensure that proposed plant material, at maturity, will maintain clear line
c. Plant material adheres to spacing recommendations based on plant and
shrub species.
d. Note the material that will placed in planter areas, i.e. mulch, decorative
rock, etc.
e. Irrigation shall be located along the vines fencing along the north, west, and
south perimeter of the property. Vines planting material shall be a minimum
15-gallon.
f. The south privacy fence located between the future Community Garden and
the business parking area shall be planted with vines and irrigated.
g. The proposed landscape shall incorporate a drip irrigation system.
h. Irrigation shall be included in the raised Community Garden beds and the
community fruit tree grove.
i. A water spigot shall be located at the future Community Garden area.
j. Include a legend: type of species, including common and scientific name of
the planting, size, landscape percentage.
k. All trees shall be a minimum size of 15-gallon, having a minimum height of
eight feet at the time of planting.
l. Shrubs shall be a minimum of 1-gallon size at the time of planting.
m. Ground cover shall be healthy, dense foliage, and well routed cuttings, or
one-gallon container plants.
n. The spacing of trees and shrubs shall be appropriate for the species used.
o. Twenty percent of planting material shall be pollinating plants.
Attachment: Resolution_Trailer Container Storage Facility \[Revision 2\] (CUP 19-01, SA 19-03 and E 19-05)
p. Approval must be obtained for removal of all trees having a trunk diameter
of 10 inches or more measured 48 inches above existing grade.
q. Submit an initial deposit of $2,000 deposit for landscape plan check review.
Packet Pg. 30
C.1.a
33.The proposed storage shed, and shade shelters, size, style, and location shall be
reviewed and approved by the Planning and Development Services Department
prior to construction.
34. Proposed lighting shall not produce any glare onto adjoining properties and shall
be shielded as may be required. Lighting shall not exceed eighteen feet in height
from the finished grade and shall be designed to reflect away from residential
district and public roadways. A photometric plan shall be included in the
construction plans for review.
35. Prior to the construction of perimeter fencing on shared property lines, the
Applicant shall submit a Fence/Wall Agreement signed by the adjacent property
owners.
36. The Applicant shall comply with the California Restricted Materials Requirements
by the State of California Department of Pesticide Regulation for Ground Water
Protection Area. Prior to initiating trailer storage and prior to obtaining a Certificate
of Occupancy by the Building and Safety Division. Copies of such clearances shall
be provided to the Planning and Development Services Department and the
Building and Safety Division.
37. The Applicant shall comply with the National Pollutant Discharge Elimination
System (NPDES).
38. The proposed 900 square foot office trailer and 4,800 square foot maintenance
building for future development, shall be reviewed and approved through an
Administrative Conditional Use Permit. The Applicant shall obtain easement holder
clearances prior to the construction of any structures located within any easement.
39. The location and method of screening for all roof-mounted and building-mounted
equipment shall be demonstrated on the elevations. All equipment shall be
screened from public view and designed to be an integral component of the
building design. All roof-mounted equipment shall be screened from view by
parapet walls or other architectural means. The Applicant shall demonstrate to the
satisfaction of the Planning and Development Services Director that no roof-
mounted equipment will be visible from the public right-of-way.
40. Any future water well shall be reviewed and approved by City Departments and
agencies, including obtaining applications and clearances by San Bernardino
County Environmental Health Services Department. A copy of such certificates
shall be provided to the Planning and Development Services Division and the
Building and Safety Division.
Attachment: Resolution_Trailer Container Storage Facility \[Revision 2\] (CUP 19-01, SA 19-03 and E 19-05)
41. Any future changes in on-site activities shall require submittal, review, and
approval of a modified conditional use permit.
Packet Pg. 31
C.1.a
42.Any future development on the site,including alterations, conversions, remodels,
and new structures shall require compliance with the Municipal Code and the
Floodplain Ordinance.
43. All ground mounted equipment, including backflow devices, shall be screened in a
manner that does not impede traffic visibility.
44. The Applicant shall be responsible for regular and ongoing upkeep and
maintenance of the site.
45. All contractors shall acquire a valid City business license and be in compliance
with all City codes.
46. The Santa Ana River Trailhead entry structure and monument sign size, style, and
location shall be reviewed and approved as identified in the Community Benefit
Agreement.
47. The Applicant shall complete and carry out, as applicable, all community amenities
identified in the Community Benefit Agreement (CBA) and as provided in Condition
2 within the timeframes identified in the CBA.
48. The Applicant shall obtain a sign permit prior to the installation of any business
signs.
49. The applicant or assignee shall submit a security camera plan that demonstrates
onsite and offsite monitoring. Plan shall be reviewed and approved by the
Planning and Development Director prior to the issuance of a certificate of use and
occupancy.
PASSED AND ADOPTED by the Planning Commission of the City of Grand Terrace,
th
California, at a regular meeting and public hearing held on the 16 day of July 2020.
AYES:
NOES:
ABSENT:
ABSTAIN:
Attachment: Resolution_Trailer Container Storage Facility \[Revision 2\] (CUP 19-01, SA 19-03 and E 19-05)
RECUSE: Chairman Giroux
Commissioner McConnell
Packet Pg. 32
C.1.a
ATTEST:
__________________________ __________________________
Steven A. Weiss Jeremy Briggs
Planning Development Services Acting Chairman
Director
STATE OF CALIFORNIA )
COUNTY OF SAN BERNARDINO )
CITY OF GRAND TERRACE )
I Steven Weiss of the CITY OF GRAND TERRACE, CALIFORNIA, DO HEREBY
CERTIFY that the foregoing Resolution, being Resolution No. 2020-XX was duly passed,
approved and adopted by the Planning Commission, approved and signed by the
Chairman, and attested by the Planning and Development Services Director, at the
th
regular meeting of said Planning Commission held on the 16 day of July, 2020, and that
the same was passed and adopted by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
RECUSE: Chairman Giroux
Commissioner McConnell
th
Executed this 16 day of July 2020, at Grand Terrace, California.
Attachment: Resolution_Trailer Container Storage Facility \[Revision 2\] (CUP 19-01, SA 19-03 and E 19-05)
___________________________
Steven A. Weiss, AICP
Planning and Development Services
Director
Packet Pg. 33
C.1.b
Building and Safety Conditions of Approval
Date: March 18, 2020
File No:Conditional Use Permit 19-01
Applicant: GrandT-1 Inc., represented by Patrick O’ Brien
Address of Applicant:1040S.Mt. Vernon Ave., Suite G-285 Colton, CA 92324
APN: 0275-191-06 & 30
Provide four (4)sets of construction plans and documentation for plan review of the
proposed project. Below you will find a list of the plans and documents Building and Safety
will need forplan review. The initialplan review will take approximately two weeks on most
projects.
Provide the following sets of plans and documents.
Building and Safety submittalrequired at first plan review.
(4)Architectural Plans
(4)Structural Plans
(2)Structural Calculations
(4)Plot/Site Plans
(4)Electrical Plans
(4)ElectricalLoad Calculations
(4) Plumbing Plans/Isometrics, Water, Sewer and Gas
(4)Mechanical Plans
(4)Mechanical Duct Layout Plans
(2)Roof and Floor Truss Plans if applicable
(2)Title 24 Energy Calculations
Attachment: Exhibits to the Resolution (CUP 19-01, SA 19-03 and E 19-05)
(4)Rough and Precise Grading Plans
(2)Water QualityManagement Plan, (WQMP) and Erosion Control Plan.
(2)Stormwater Pollution Prevention Plan(SWPPP)
(2)Best Management Plan (BMP)
Packet Pg. 34
C.1.b
Building and Safety Conditions of Approval
Building & Safety General Information
All structures shall be designed in accordance with the currently adopted building codesby
the State of Californiaand City of Grand Terrace Municipal Code as adoptedat time of plan
submittal.Note if a new code has been adopted priorto the submittal, then all structures
shall be designed to the current model code year.
TheDeveloper/Owner is responsible for the coordination of the final occupancy. The
Developer/Owner shall obtain clearances from each department and division prior to
requesting a final building inspection from Building & Safety. Each agency shall signthe
bottom of theJob Cardor Certificate of Occupancy Clearance Form.
Building & Safety inspection requests can be made twenty-four(24) hours in advance for
next day inspection. Please contact 909-825-3825. You may also request inspections at
the Building &Safetycounter.
All construction sites must be protected by a security fenceand screening. The fencing
and screening shall be maintained at all times to protect pedestrians.
Temporary toilet facilities shall be provided for construction workers.The toilet facilities
shall be maintained in a sanitary condition. Construction toilet facilities of the non sewer
type shall conform toANSI ZA.3.
Construction projects which require temporary electrical power shall obtain an Electrical
Permit fromBuilding& Safety. No temporary electrical power will be granted to a project
unless one of the following items isin place and approved by Building & Safety and the
Planning Division.
(A)Installation of a construction trailer, or,
(B)Security fenced area where the electrical power will be located.
Installation of construction/salestrailers must be located on private property. No trailers
Attachment: Exhibits to the Resolution (CUP 19-01, SA 19-03 and E 19-05)
can be located in the public street right of way.
S
eparate plan submittals and permits are required for all accessory structuresincluding but
not limited topatios, block walls, storage buildings, community playgrounds, etc.
Pursuant to the California Business and Professions Code Section 6735, most projects are
required to be designed by a California Licensed Architect or Engineer. The project owner
or developer should review the section of the California Codes and comply with the
regulation.
Packet Pg. 35
C.1.b
Building and Safety Conditions of Approval
Building & SafetyConditions
1.Prior to theissuance of a building permit, the applicant shall pay all
DevelopmentImprovement Fee’s tothe City; this alsoincludesschool fees
and outside agency feesincluding but not limited to Colton Wastewater,
Riverside-HighlandWaterCo.and utilities. Copies of receipts shall be
provided to Building & Safety priorto permit issuance.
2.All on site utilities shall be underground to the new proposed structureunless
prior approval has been obtained by the utility company or the City.
3.Prior to issuanceof Building Permits, on site water service shall be installed
andapprovedby the responsible agency. On site fire hydrants shall be
approved by the Fire Department. No flammable materialswill be allowed on
the site until the fire hydrants areinstalledand approved.
4.Prior to issuance of building permits, site gradingcertification and pad
certifications shall be submitted to Building & Safety.Prior to concrete
placement, submit a certification for the finish floor elevation and setbacksof
the structures. The certification needs to reflect that the structureis in
conformancewith the Precise Grading Plans. Compaction reports shall
accompany pad certifications.The certifications are required to be signed by
the engineer of record.
5.Prior to issuance of building permits, provide Building & Safety with a will
serviceletter from Riverside Highland Water District.
6.All construction projectsshall comply with the National Pollutant Discharge
Elimination Systems (NPDES), and the San Bernardino County MS-4 Storm
Water Permit.
7.Provide civil engineering drawings fordedication of 15foot of right of way and
Attachment: Exhibits to the Resolution (CUP 19-01, SA 19-03 and E 19-05)
all public right of way improvementsincluding curb, gutter and half street
width improvements. Civil engineering drawings and dedication shall be
submitted to Public Worksto be checkedby the City Engineer and recorded
with theCounty Recorder’s office before permits are issued.
8.Depending on the location of the curb and gutter, the utilities located in the
public right of way in frontoftheproperty,along Michigan St., may need to be
relocated.Pleasecontact Edison andthetelephone/cable company to
determine the desired location for theutilities.
Packet Pg. 36
C.1.b
Building and Safety Conditions of Approval
9.Prior to building permit issuance,the applicant shall establish haul services
for construction waste material with Burrtec to facilitate the recycling of all
recoverable/recyclablematerial as mandated under the California Green
Code and City of Grand Terrace Municipal Code.
10.The applicant shall submit acompletedConstruction & Demolition (C&D)
WasteDiversion Program/ Waste Management Plan (WMP) form along with
the required C&D deposit based per square footage of construction and/or
demolitionprior to building permit issuance.
11.Project with new landscape areas of 500 square feetor more are subjectto
the 2015 Model Water Efficient Landscape Ordinance (MWELO).
Attachment: Exhibits to the Resolution (CUP 19-01, SA 19-03 and E 19-05)
Packet Pg. 37
C.1.b
Public Works Conditions
Date: 5-13-20
Applicant:GrantT-1, Inc., represented by Patrick O’Brien
Address of Applicant:3090 Pullman Street, Costa Mesa, Ca, 92626
Site Location: Terrace Avenue, approx. 385 feet north of Vivienda Ave
Case # CUP 19-01, SAR 19-03, EA 19-05
Provide two (2) construction plans and required documentation for review of the proposed project.
Below is a list of theplans and documentsPublic Works will need forplan review. The initial plan
review will take approximately three weeks on most projects. You have received acase number:CUP
19-01for the proposed project, this number will be needed to obtain information regarding your plan
review. Plan review fees and permit fees will be charged at the time plans are approved and are ready to
issue. Provide the following sets of plans and documents.
Public Works/Engineering submittalsrequired at first plan review.
(1)Grant Deed showing all easements.
(1)Water Plans.
(4)Street improvement plans prepared by a licensed Civil Engineer.
(4) Approved TentativePlan
(4)Utility Plans
(4)Sewer Plans
(4) Grading Plans and Erosion Control Plan
(2) Drainage Report and FinalWater Quality Management Plan, (WQMP)
(2) Stormwater Pollution Prevention Plan
All work performed in the public right of way shall comply with the San Bernardino County Public
Works Standardsorstandards of the latest update of the Greenbook as approved by thePublic Works
Attachment: Exhibits to the Resolution (CUP 19-01, SA 19-03 and E 19-05)
Director or City Engineer.
Public Works inspection requests can be made twenty-four (24) hours in advance for next day
inspection. Please contact (909) 825-3825. You may also request inspections at the Building & Safety
public counter.
Installation of construction/sales trailers must be located on private property. No trailers, equipment or
materialcan be inthe public street right of way.
Packet Pg. 38
C.1.b
Public Works Conditions
1.All proposed publicstreet improvements shall be designed by persons registered and licensed
pursuant to the Business and Professions Codeand all street work will require a contactor
licensed in the State of California and insured pursuant to the City’s insurance requirements.
2.The applicantshall dedicateright of wayand/or construct all missing or damaged public
improvements.The missingor damaged public improvements shall include, but are not limited
to, pavement, curb, gutter, sidewalk, driveway approach, and streetlights as directed by the
Public Works Department.
3.Install centrally located concrete ornamental streetlights in the right of way and pay one-year
energy cost for streetlights.Coordinate with Southern California Edison and the City of Grand
Terracefor cost and locations. Streetlightsshall be LED type.
4.Provide half street width paving overlay after utility installations on the entire length of the
project.Minimum 2-inchasphalt overlay with an asphalt grind. All grindings shall be recycled.
5.The Applicant shall submit proposed sewer plans to the City of Colton Wastewater Department
and Public Works for plan review. Applicant shall pay all plan review fees and permit fees for
the sewer review to the City of Coltonand Public Works. Please provide a written “Will Serve”
letter and sewer plans to the City of Grand Terrace for approval before any permits are issued.
6.The applicant shall submit proposed water plans to the Riverside Highland Water Company and
Public Works for plan review. Applicant shall pay all plan review fees and permit fees for the
water review to Riverside Highland Water Companyand Public Works. Please provide a written
“Will Serve” letter and plans to the Cityof Grand Terrace for approval before any permits are
issued.
7.Applicant shall submit proposed water plans for fire hydrants to the Countyof San Bernardino
Fire Department for plan review and approval. Applicant shall pay all plan review fees and
permit fees for the fire hydrant system review to the County of San Bernardino Fire Department.
8.Provide additional 20 feet right of way dedication on Terrace Avenuewhich is classified as a
Local Roadwith 60feet ultimate width the entire length of the property.Street improvements
Attachment: Exhibits to the Resolution (CUP 19-01, SA 19-03 and E 19-05)
will be required to extend beyond the frontage of the project to blend and taper the pavement for
traffic and address street flows for drainage. Provide full width paving sectionandcurb, gutter,
sidewalk, streetlights along project frontage and signage and striping per standard 104.
9.T
ruck guide signs shall be posted at intersections and in the area around Terrace to keep truck
traffic on Terrace and Barton Road as directed by the City Engineer.
10.The exhibit is showing a partial Knuckle, however, the access under the railroad is conditioned
to be gated by another project so a full truck turning cul-de-sac will be neededper standard 120
or Riverside County standard 800.
Packet Pg. 39
C.1.b
11.Terrace from southpropertyline to Walnut shall have a Paved Road Section perstandard 114a
and a barrier on the west side at a grade difference offour feet or greater below the existing road
grade. Type of barrier to be approved by City of Colton and Grand Terrace.
12.The curb returns and ramps on Terrace Aveshall be constructed per San Bernardino County
Standard 110. The radius of these curbs shall be 50 feet.
13.Minimum driveway grades shall be consistent with San Bernardino CountyStandard131.
Riverside County Standard driveway approach can also be used.
14.A truck haul permit shall be required if more than 50 cubic yards of earth is to be hauled on City
Street. Additional conditions, such as truck route approval, traffic controls, bonding, and or
street cleaning may be required by the City engineer.
15.The geotechnical report recommendations for on-and off-siteexcavation, compaction, slope
stability and paving sections shall be submitted. The date ofthe report shall be placed on the title
sheetsof the streetplans.
16.Monumentation: If any activity on this project will disturb anyland survey monuments, the
disturbed monumnetation shall be located andreferenced by or under the direction of a licensed
land surveyor or a registered civil engineer authorized to practice land surveying prior to
commencement of any activity with the potential to disturb the monumnetation, and a corner
record or record of survey of the references shall be filled with theCounty.
17.All construction projects shall comply with the National Pollutant Discharge Elimination
Systems (NPDES)and the current San Bernardino County MS4 permit.
18.The subdivider shall protectdownstream propertiesfrom damages caused by alteration of the
drainage patterns, i.e., concentration or diversion of flow. Protection shall be provided by
constructing adequate drainage facilities including enlarging existing facilities and/or by securing
a drainage easement.The subdivider shall provide mitigation measures to be incorporated into
the development to prevent flooding of the site and downstream properties. The retention of the
post-development runoff from the 100-yearevent shall be required as part of the drainage
improvements for this project.
Attachment: Exhibits to the Resolution (CUP 19-01, SA 19-03 and E 19-05)
19.The subdivider shall accept and properly disposeof all off-site drainage flowing onto or through
the site. In the event the Public Works Department permits the use of streets for drainage
purposes, the provisions of City/CountyOrdinance will apply.
Packet Pg. 40
C.1.b
San Bernardino County Fire Department
Community Safety Division
Plan Review Comments
Date Reviewed:10/07/2019
Reviewed By:Mike Havens
Project Type:Fire Planning/DRC
Permit Number:FPLN-2019-00163
Project Name:GrandT-1 CUP 19-01
Project Description:Conditional Use Permit for an outdoors trailer storage yard.
Location:0 VIVIENDA AVE
GRAND TERRACE, CA 92313
APN:0275191060000
Dear Applicant,
San Bernardino County Fire Department has completed review of the proposed project. Please see the
FIRE COMMENTS attachment below.
Redline Plans can be downloaded from the San Bernardino County EZ Online Permitting (EZOP) system at
http://av-ezop.sbcounty.gov. Guidance on how to access and navigate the EZOP portal can be found at
http://wp.sbcounty.gov/ezop/faqs/videos/.
If you have any questions please contact County Fire at (909) 386-8400.
Sincerely,
The Office of the Fire Marshall
Attachment: Exhibits to the Resolution (CUP 19-01, SA 19-03 and E 19-05)
Community Safety Division
San Bernardino County Fire Department
Page 1 of 3
v.19.02.0
Packet Pg. 41
C.1.b
Review Date:10/07/2019
Permit Number:FPLN-2019-00163
Location:0 VIVIENDA AVE
GRAND TERRACE, CA 92313
APN:0275191060000
FIRE COMMENTS
Access
The development shall have a minimum of ____2____ points of vehicular access. These are for fire/emergency
equipment access and for evacuation routes. a. Single Story Road Access Width. All buildings shall have access
provided by approved roads, alleys and private drives with a minimum twenty-six (26) foot unobstructed width and
vertically to fourteen (14) feet six (6) inches in height. Other recognized standards may be more restrictive by
requiring wider access provisions. b. Multi-Story Road Access Width. Buildings three (3) stories in height or more
shall have a minimum access of thirty (30) feet unobstructed width and vertically to fourteen (14) feet six (6) inches
in height.
Secondary Access Paved
Prior to building permits being issued to any new structure, the secondary access road shall be paved or an all-
weather surface and shall be installed as specified in the General Requirement conditions including width, vertical
clearance and turnouts.
Hydrant Marking
Blue reflective pavement markers indicating fire hydrant locations shall be installed as specified by the Fire
Department. In areas where snow removal occurs or non-paved roads exist, the blue reflective hydrant marker shall
be posted on an approved post along the side of the road, no more than three (3) feet from the hydrant and at least
six (6) feet high above the adjacent road.
Standard W-2 ONSITE FIRE PROTECTION WATER SYSTEMS
This standard establishes minimum requirements for installation and maintenance of all private fire hydrants and
appliances related to an onsite fire protection system.
Standard A-2 FIRE APPARATUS ACCESS ROAD DESIGNATION AND MARKING
This standard applies to the marking of all Fire Department access roadways for new construction and development.
Existing roadways identified as fire access roadways or otherwise required for emergency access shall also be
marked per this standard.
Standard A-1 FIRE APPARATUS ACCESS ROAD DESIGN, CONSTRUCTION AND MAINTENANCE
This standard shall apply to the design, construction and maintenance of all new fire apparatus access roads within
the jurisdiction, as well as fire apparatus access roads at existing facilities when applied at the discretion of the fire
code official.
Additional Requirements
Attachment: Exhibits to the Resolution (CUP 19-01, SA 19-03 and E 19-05)
In addition to the Fire requirements stated herein, other onsite and offsite improvements may be required which
cannot be determined from tentative plans at this time and would have to be reviewed after more complete
improvement plans and profiles have been submitted to this office.
Fire Inspection will be required during Hydrant installation.
1.Indicate on Plans the Turning radius as required on Standard A-1
2.Fire lane to be 26 ft, indicate on plans on all drive aisles.
3.Resubmit Plans.
Page 2 of 3
v.19.02.0
Packet Pg. 42
Grand Terrace Trailer/Container Storage Project
City of Grand Terrace
Appendix J – Mitigation Monitoring and Reporting Program
MITIGATION MONITORING AND REPORTING PROGRAM CHECKLIST
Project Name:Grand Terrace Trailer/Container Storage Project Applicant: GrandT-1,
Date:March 2020
Verified
Responsible for Timing of Date/
Mitigation Measure No. / Implementing Action Monitoring Verification Method of Verification Initials
Biological Resources
BIO-1 If project activities are planned during the Planning and Prior to issuance of Evidence the required pre-
bird nesting season (February 1 to August Development grading, stockpiling construction survey has been
31), a nesting bird survey shall be conducted Services Director or or construction completed, and (as applicable),
within three days (72 hours) prior to any Designeepermits.the establishment and
ground-disturbing activities, including, but maintenance of appropriate
not limited to demolition, clearing, buffers
grubbing, and/or rough grading, to ensure
birds protected under the Migratory Bird
Treaty Act (MBTA) are not disturbed by on-
site activities. Any such survey(s) shall be
conducted by a qualified biologist. If no
active nests are found, no additional actions
related to this measure are required. If
active nests are found, the nest locations
shall be mapped by the biologist. The
nesting bird species shall be documented
and, to the degree feasible, the nesting
stage (e.g., incubation of eggs, feeding of
young, near fledging) determined. Based on
the species present and surrounding
habitat, a no-disturbance buffer shall be
established around each active nest. The
buffer shall be identified by a qualified
biologist and confirmed by the City; non-
raptor bird species nests shall be buffered at
least 280 feet, while raptor nests shall be
buffered at least 820 feet. No construction
or ground disturbance activities shall be
conducted within the buffer until the
Mitigation Monitoring and Reporting Program
Grand Terrace Trailer/Container Storage Project
City of Grand Terrace
Appendix J – Mitigation Monitoring and Reporting Program
Project Name:Grand Terrace Trailer/Container Storage Project Applicant: GrandT-1,
Date:March 2020
Verified
Responsible for Timing of Date/
Mitigation Measure No. / Implementing Action Monitoring Verification Method of Verification Initials
biologist has determined the nest is no
longer active and has informed the City and
construction supervisor that activities may
resume. This measure shall be implemented
to the satisfaction of the Planning and
Development Director or designee.
Cultural Resources
CUL-1 Prior to issuance of grading permits, the Planning and Prior to issuance of Submittal of plans including the
applicant shall provide evidence to the City Development grading or required language.
that the following note is included on the Services Director or stockpiling permits.
Evidence appropriate notification
grading plans/documents:Designee
of the SMBMI has been
“In the event that cultural resources are completed (as required).
discovered during project activities, all work
Submittal of evidence that a
in the immediate vicinity of the find (within
Monitoring and Treatment Plan
a 60-foot buffer) shall cease and a qualified
has been developed (as required)
archaeologist meeting Secretary of Interior
for any previously undetected on-
standards shall be hired to assess the find.
site cultural resource and
Work on the project outside of the buffered
evidence that provisions of the
area may continue during this assessment
plan have been appropriately
period. Additionally, the San Manuel Band
completed.
of Mission Indians Cultural Resources
Department (SMBMI) shall be contacted, as
detailed in Mitigation Measure TCR-1,
regarding any pre-contactfinds and be
provided information after the
archaeologist makes his/her initial
assessment of the nature of the find, so as
to provide Tribal input with regard to
significance and treatment.
If significant pre-contact cultural resources,
as defined by CEQA (as amended, 2019), are
Mitigation Monitoring and Reporting Program
Grand Terrace Trailer/Container Storage Project
City of Grand Terrace
Appendix J – Mitigation Monitoring and Reporting Program
Project Name:Grand Terrace Trailer/Container Storage Project Applicant: GrandT-1,
Date:March 2020
Verified
Responsible for Timing of Date/
Mitigation Measure No. / Implementing Action Monitoring Verification Method of Verification Initials
discovered and avoidance cannot be
ensured, the archaeologist shall develop a
Monitoring and Treatment Plan, the drafts
of which shall be provided to SMBMI for
review and comment, as detailed in
Mitigation Measure TCR-1. The
archaeologist shall monitor the remainder
of the project and implement the Plan
accordingly.
If unanticipated human remains or funerary
objects are encountered during any
activities associated with the project, work
in the immediate vicinity (within a 100-foot
buffer of the find) shall cease and the
County Coroner shall be contacted pursuant
to State Health and Safety Code §7050.5 and
that code enforced for the duration of the
project.”
Geology/Soils/Paleontology
GEO-1 Prior to issuance of grading permits, the City Planning and Prior to issuance of Submittal of plans including the
shall verify that the following note is Development grading or required language.
included on the grading plans: Services Director or stockpiling permits.
As warranted, evidence
Designee
“If paleontological resources are appropriate notification a
encountered during the course of ground qualified paleontologist has been
disturbance, work within 60 feet of the find contacted and appropriate
shall be halted and an exclusionary buffer buffers have been established.
shall be established. A paleontologist shall
Submittal of evidence that any
be contacted to assess the find for scientific
previously undetected on-site
significance. No ground-disturbing activity
paleontological resource has
within the 60-foot exclusionary buffer may
occur without the consent of the
Mitigation Monitoring and Reporting Program
Grand Terrace Trailer/Container Storage Project
City of Grand Terrace
Appendix J – Mitigation Monitoring and Reporting Program
Project Name:Grand Terrace Trailer/Container Storage Project Applicant: GrandT-1,
Date:March 2020
Verified
Responsible for Timing of Date/
Mitigation Measure No. / Implementing Action Monitoring Verification Method of Verification Initials
paleontologist and the City of Grand Terrace been appropriately recorded,
Planning and Development Director. If recovered, curated, and reported.
determined to be significant, the fossil(s)
shall be collected from the field. The
paleontologist may also make
recommendations regarding additional
mitigation measures, such as
paleontological monitoring. Scientifically
significant resources shall be prepared to
the point of identification, identified to the
lowest taxonomic level possible, cataloged,
and curated into the permanent collections
of a museum repository. If scientifically
significant paleontological resources are
collected, a report of findings shall be
prepared to document the collection.”
This measure shall be implemented to the
satisfaction of the City of Grand Terrace
Planning Director or his/her designee.
Tribal Cultural Resources
TCR-1 Prior to the issuance of grading permits, the Planning and Prior to issuance of Submittal of plans including the
applicant shall provide evidence to the City Development grading or required language.
the following language is included on final Services Director or stockpiling permits.
Evidence appropriate notification
grading documents:Designee
of the SMBMI has been
“The San Manuel Band of Mission Indians completed (as required).
Cultural Resources Department (SMBMI)
Submittal of evidence that a
shall be contacted, as detailed in Mitigation
Monitoring and Treatment Plan
Measure CUL-1, of any pre-contact cultural
has been developed (as required)
resources discovered during project
for any previously undetected on-
implementation, and be provided
site cultural resource and
information regarding the nature of the find,
Mitigation Monitoring and Reporting Program
Grand Terrace Trailer/Container Storage Project
City of Grand Terrace
Appendix J – Mitigation Monitoring and Reporting Program
Project Name:Grand Terrace Trailer/Container Storage Project Applicant: GrandT-1,
Date:March 2020
Verified
Responsible for Timing of Date/
Mitigation Measure No. / Implementing Action Monitoring Verification Method of Verification Initials
so as to provide Tribal input with regard to evidence that provisions of the
significance and treatment. Should the find plan have been appropriately
be deemed significant, as defined by CEQA completed.
(as amended, 2015), a cultural resources
Monitoring and Treatment Plan shall be
created by the archaeologist, in
coordination with SMBMI, and all
subsequent finds shall be subject to this
Plan. This Plan shall allow for a monitor to be
present that represents SMBMI for the
remainder of the project, should SMBMI
elect to place a monitor on site.
Any and all archaeological/cultural
documents created as a part of the project
(isolate records, site records, survey reports,
testing reports, etc.) shall be supplied to the
applicant and Lead Agency for
dissemination to SMBMI. The Lead Agency
and/or applicant shall, in good faith, consult
with SMBMI throughout the life of the
project.”
Mitigation Monitoring and Reporting Program
Responses to the Comments/Questions Raised at the May 21, 2020 Planning Commission Hearing
Conditional Use Permit 18-04
Page 1 of 22
Issue Raised /Request Made Current Basis for Requirement Procedure to Address Issue
Requirement/Status
1 Trucks potentially getting lost in Operator will implement procedures
No designated truck route in
Per CEQA Guidelines
neighborhood/ it could happen, Did and
Section 15064(f)(5) neighborhoods
environmental document address? site
neighborhoods
Despite past events, there
signage may be installed on local
is no reasonable evidence
streets indicating travel restrictions.
to support the claim that
trucks for this project will
intentionally enter these
neighborhoods.
ЉЊЋЍА͵ЉЉЉЎΉЏЉАЋЏЎ͵Њ
Responses to the Comments/Questions Raised at the May 21, 2020 Planning Commission Hearing
Conditional Use Permit 18-04
Page 2 of 22
Issue Raised /Request Made Current Basis for Requirement Procedure to Address Issue
Requirement/Status
2 How long will the construction period be? The Air Quality analysis Chapter 18.83 0 Conditional No exceedance of SCAQMD daily
(page 44, Appendix A of the Use Permit, Section 18.83.090 emission thresholds was identified
IS/MND) anticipates up to 65 Expiration and Extensions in the technical Air Quality report
days of construction prepared for the project (see
including site preparation, The approval of a permanent IS/MND, Appendix A; therefore, no
grading, and pavement conditional use permit significant air quality or health risk
installation. application shall automatically impact would result from the
expire one year from the date of construction or operation of the
The approval is for 12 its approval unless: proposed uses. No mitigation is
months with two 12-month a. All conditions of approval are required.
time extension can be met; or
requested sixty days prior to b. Sufficient investment has
the approval date expiration. been completed and building This approval
permits are issued; or (12) months from the date of
c. Business license is issued in adoption of this resolution unless
accordance with the Grand permits have been issued and a
Terrace Municipal Code. substantial investment in reliance of
those permits has occurred; all
In the case the applicant is not conditions of approval have been
able to comply with subsections met; or a time extension has been
a, b, or c, then the applicant gran
shall apply for an extension of with Chapter 18.63 of the Zoning
the one-year compliance period Code. Time extensions shall be
prior to the end of that year filed at least sixty (60) days prior to
period.
Air Quality analysis:
Constructions assumptions
used to develop Air Quality and
Health Risk Modeling.
ЉЊЋЍА͵ЉЉЉЎΉЏЉАЋЏЎ͵Њ
Responses to the Comments/Questions Raised at the May 21, 2020 Planning Commission Hearing
Conditional Use Permit 18-04
Page 3 of 22
Issue Raised /Request Made Current Basis for Requirement Procedure to Address Issue
Requirement/Status
3 Assurance no lights occurring during The construction Chapter 18.60 Off-street Condition of Approval No. 31,
construction. assumptions (Table G, Parking, Section 18.60.040 Proposed lighting shall not produce
Appendix A) anticipated Design Standards (c) any glare onto adjoining properties
Place hours of construction and be clear to operation of construction 1. Lighting shall be designed to and shall be shielded as may be
include daylight savings time equipment 8 hours per day reflect away from residential required. Lighting shall not exceed
during the construction districts and public roadways, 2. eighteen feet in height from the
period. shall not exceed eighteen feet finished grade and shall be
in height measured from the designed to reflect away from
This should provide sufficient finished grade of the parking residential district and public
daylight hours to avoid the surface, roadways. A photometric plan shall
use of night lighting. The 3. no light shall create be included in the construction
applicant will comply with the illumination on an adjacent plans for review.
noise ordinance and property which exceeds five
construction will take place foot-candles (measured at Condition of Approval No. 11.
from 7:00 a.m. to 8:00 p.m. ground level). Operational activities associated
with the Project shall comply with
In addition, lighting for the Chapter 18-74.030 - Noise the regul
project shall not create Standards, Section 8.108.040 Ordinance, Chapter 8.108 of the
spillover illumination on Special Activities (C) Noises Grand Terrace Municipal Code.
adjacent property owners for sources associated with or
more than five foot candles. vibration created by .
construction, repair or
A construction schedule will remodeling or grading of any
be provided by the applicant real property or during
in compliance with the authorized seismic surveys,
conditions of approval provided said activities do not
take place between the hours of
8:00 p.m. and 7:00 a.m. on
weekdays, including Saturday,
or at any time on Sunday or a
national holiday.
ЉЊЋЍА͵ЉЉЉЎΉЏЉАЋЏЎ͵Њ
Responses to the Comments/Questions Raised at the May 21, 2020 Planning Commission Hearing
Conditional Use Permit 18-04
Page 4 of 22
Issue Raised /Request Made Current Basis for Requirement Procedure to Address Issue
Requirement/Status
4 Wells onsite, who do they belong to? Existing wells are proposed to The destruction, re
All existing wells have been
be abandoned. Owner must destruction of any well requires a
identified that occupy the
formally state intentions to San valid permit from and the work must
site. There will be no
Bernardino Division of be performed by a licensed
production or use of any
Environmental and Health California State Contractor as
wells for the intended
Services (DEHS), in writing, for appropriate to the activity to be
operation. All wells to be
any abandoned well(s) on engaged in (i.e. C
abandoned shall be done in
subject property. Owner shall
compliance with regulatory
have 30 days from receipt of
requirements of the County
acknowledgement letter from
and State.
DEHS to declare intentions.
5 Stacking of trailers the trailers and the Containers will not be stacked. It is
Stacking of empty chassis or
chassis can be stacked 12 feet high. Will It is possible that empty chassis they are limited to a certain number
containers was modeled in
the stacking reduce the use of the yard? would be stacked 2 high. These of 460
the Project Description.
Could this result in more trailers stored units would be in the most
further away from homes? northerly area of the site,
farthest away from any
residential area.
ЉЊЋЍА͵ЉЉЉЎΉЏЉАЋЏЎ͵Њ
Responses to the Comments/Questions Raised at the May 21, 2020 Planning Commission Hearing
Conditional Use Permit 18-04
Page 5 of 22
Issue Raised /Request Made Current Basis for Requirement Procedure to Address Issue
Requirement/Status
6 Distinguish mature versus non mature The site will be utilized for For noise associated with It was determined that noise from this
trees and vines on fencing. Was the storage, light maintenance, the installation of fencing: activity would not exceed any
fencing for screening or was there a sound and inspection; therefore, the the technical Noise study established City standard; therefore, no
issue associated with putting fencing up? Project will not cause a prepared for the project significant impact would
significant noise impacts to (see IS/MND, Appendix F) mitigation was required. The noise
adjacent neighborhoods anticipated the worst-case associated with this activity Due to the
Noise associated with the did noise during construction lower intensity equipment used
not trigger mitigation of a would be during project the construction of any project fencing,
solid block wall. grading activities. noise from this activity would not
exceed levels anticipated during
Project installation of fencing: construction.
various sections of the
Section 8.108.050 of the
Ordinance outline the
prohibition of noise related to
selected activities. Vines and
trees are required to be a
minimum 15- gallon size
The required vine fence is a
requirement to address the
outdoor storage, but not to
mitigate noise.
ЉЊЋЍА͵ЉЉЉЎΉЏЉАЋЏЎ͵Њ
Responses to the Comments/Questions Raised at the May 21, 2020 Planning Commission Hearing
Conditional Use Permit 18-04
Page 6 of 22
Issue Raised /Request Made Current Basis for Requirement Procedure to Address Issue
Requirement/Status
7 Community Garden- what is basic There is no CEQA impact Rough cost for 54 raised Community input will be warranted
monetary value of the community garden? related to this issue. planter beds at $800 per because it will be a community garden.
CEQA does not require the raised planter bed is There will be no community garden
consideration of social or $43,200 and 23 fruit trees without the community
economic impacts unless at $225 per tree is $5,175.
those impacts result in an
identified environmental Proceeds can be used to
impact support community garden
club.
ЉЊЋЍА͵ЉЉЉЎΉЏЉАЋЏЎ͵Њ
Responses to the Comments/Questions Raised at the May 21, 2020 Planning Commission Hearing
Conditional Use Permit 18-04
Page 7 of 22
Issue Raised /Request Made Current Basis for Requirement Procedure to Address Issue
Requirement/Status
8 Trucks getting lost with GPS Keep truck traffic on Public Works Condition of Approval No.
Per CEQA Guidelines
Terrace Avenue and away
9. Truck guide signs shall be posted at
Section 15064(f)(5).
from the residential areas
intersections and in the area around
on Walnut Avenue and
Despite past events, there
Terrace to keep truck traffic on Terrace
Vivienda Avenue.
is no reasonable evidence
and Barton road as directed by the City
to support the claim that
Engineer.
Signs prohibiting truck
trucks for this project will
traffic are conditioned to be
intentionally enter these
A condition of approval will be included
will be placed at Vivienda
neighborhoods.
to require all project traffic to stay on
Avenue and Walnut Avenue
Terrace Avenue towards Barton Road.
Drivers will be instructed
and trained to use the truck
route per the project
approval.
They will also be trained to
avoid using GPS as their
basis for accessing the
project.
9 our responses Appendix I to the IS/MND Improvements to North Public Works conditions address safety
Grand Terrace City Staff met Terrace and clarification
of North Terrace with paving and the
with Colton staff on two regarding utilities and
installation of guardrails or
occasions addressing easements.
in select locations to the satisfaction of
both agencies.
\\
ЉЊЋЍА͵ЉЉЉЎΉЏЉАЋЏЎ͵Њ
Responses to the Comments/Questions Raised at the May 21, 2020 Planning Commission Hearing
Conditional Use Permit 18-04
Page 8 of 22
Issue Raised /Request Made Current Basis for Requirement Procedure to Address Issue
Requirement/Status
10What is the total value of the project after There is no CEQA impact To determine property tax At completion, the property will be
completion? related to this issue. CEQA generation.
reassessed. T
does not require the
added to the property taxes
consideration of social or
assessed property value). Community
economic impacts unless
Benefit enhancement alone are
those impacts result in an
approximately $522,000. On site
identified environmental.
improvements have not been
fulltime jobs.
ЉЊЋЍА͵ЉЉЉЎΉЏЉАЋЏЎ͵Њ
Responses to the Comments/Questions Raised at the May 21, 2020 Planning Commission Hearing
Conditional Use Permit 18-04
Page 9 of 22
11Forklift beeps - how is this addressed and if Table K of the Noise Study Chapter 18.40 M2 Condition of Approval No. 10 The
the houses are 300 to 600 feet away. (Appendix F) identifies the Industrial District, Section applicant or authorized agent shall
maximum noise level 18.40.010 Purpose, the apply to
There is a condition in the project generated by a forklift is purpose of the M2 district is Safety and Health Administration
resolution. assumed to be to provide for the (OSHA) to permit an alternative to
approximately 85 dBA Lmax development of medium
at 50 ft. At 630 ft, noise manufacturing and for the purpose of lessening the noise
levels generated from these industrial uses. The and frequency of standard back up
activities would be regulations of this district apparatus. Said apparatus shall be
attenuated by 22 dBA, or are intended to allow reviewed and approved by OSHA and
below the threshold. various manufacturing and the Director of Planning and
industrial uses which Development Services prior to the
Existing nighttime ambient operate free of overly issuance of the first certificate of use
noise levels in the vicinity of excessive noise, dust, odor, and occupancy
the residence currently reach or other nuisances and can
up to 69 dBA L2 and 64 dBA be made compatible to The County of San Bernardino noise
L8. Therefore, intermittent other (nonindustrial) standards were used to evaluate noise
nighttime noise levels from districts. generated by forklift operations in the
container/trailer and chassis City of Grand Terrace because the
dropoff and pickup activities
loud or excessive n
would not be substantially
dissimilar to existing
intermittent noise levels at
comments related to potential forklift
the residences in Grand
noise, the following condition was
Terrace.
developed:
The nearest residents are
As the noise level from forklifts would
located over 370 feet.
noise standard, single
The Initial Study show less
than a significant impact to
no impact. forklifts will be addressed with
advanced noise muffling. The following
condition has been identified to
The forklifts will include a
minimize noise from forklift operations
technology approved from
to the maximum extent feasible:
OSHA that minimizes noise.
Prior to the issuance of grading or
building permi
ЉЊЋЍА͵ЉЉЉЎΉЏЉАЋЏЎ͵Њ
Responses to the Comments/Questions Raised at the May 21, 2020 Planning Commission Hearing
Conditional Use Permit 18-04
Page 10 of 22
submitted first, the applicant shall
provide evidence to the Planning and
Development Services Director that an
application has been submitted to the
United States Occupational Safety and
Health Administration (OSHA) to permit
an alternati
forklifts and/or yard goats for the
purpose of lessening the noise and
frequency of standard back
apparatus.
equipment shall be reviewed and
approved by OSHA and the Director of
Development Services prio
issuance of the first certificate of use
and occupancy.
ЉЊЋЍА͵ЉЉЉЎΉЏЉАЋЏЎ͵Њ
Responses to the Comments/Questions Raised at the May 21, 2020 Planning Commission Hearing
Conditional Use Permit 18-04
Page 11 of 22
Issue Raised /Request Made Current Basis for Requirement Procedure to Address Issue
Requirement/Status
12Clarifying questions about crushed asphalt Technical report attachment The project will utilize acceptable cover
Acceptable cover material,
versus, Decomposed Granite or Slag. outlines acceptable health material th
public works criteria shall
risk considering the use of project initiation
be applied.
asphalt versus slag
13Signs on Vivienda do we have proper truck As a result of the Barton Keep truck traffic on Public Works Condition of Approval No.
signage. Terrace Avenue and away 9. Truck guide signs shall be posted at
Road interchange project,
from the residential areas intersections and in the area around
which is nearing completion,
on Walnut Avenue and Terrace to keep truck traffic on Terrace
signs are being installed in
Vivienda Avenue. and Barton road as directed by the City
appropriate locations to
Engineer.
advise trucks the residential
neighborhoods prohibit truck
Appropriate education and
traffic
the drivers shall be implemented.
No gas tanks on site? AQMD requirement for Onsite equipment shall comply with up
14No underground tanks are
alternative vehicle and to date Air Quality Management District
proposed.
reduction of diesel requirements
particulate.
The vehicles will be electric
or clean diesel engines in the
yard.
Did San Bernardino Fire Department want The project driveway meets Per Condition of Approval
15The Planning and
two gates (point to study)? San Bernardino County Fire applicant shall resubmit plans to San
Development Services
access requirements as an Bernardino County F
Department confirmed San
acceptable single point of with the Conditions of Approval
Bernardino County Fire will
access. established by the Fire Department
require one point of access.
under Permit Number FPLN
00163.
ЉЊЋЍА͵ЉЉЉЎΉЏЉАЋЏЎ͵Њ
Responses to the Comments/Questions Raised at the May 21, 2020 Planning Commission Hearing
Conditional Use Permit 18-04
Page 12 of 22
Issue Raised /Request Made Basis for Requirement Procedure to Address Issue
Current
Requirement/Status
16Clarification regarding type of vehicles in The traffic study It has been determined The project will utilize modern
traffic study and difference between 5 and there is no basis for tor a compliant trailers that will be empty.
differentiates between 3 and
4 axle trucks within this project requirement that effects any
4 axles as a necessary basis
operational aspects.
for analysis as it will not
affect the results of the traffic
impact analysis.
How much time people will be allowed in Undetermined currently. Will be identified within the Community
17There is no CEQA impact
community garden The community will assess Benefit Agreement with an
related to this issue
how the garden will implementation plan.
operate.
Questions about who maintains garden Undetermined currently. The Agreement will be considered by
18There is no CEQA impact
and The community will assess the City
related to this issue.
how the garden will
operate.
ЉЊЋЍА͵ЉЉЉЎΉЏЉАЋЏЎ͵Њ
Responses to the Comments/Questions Raised at the May 21, 2020 Planning Commission Hearing
Conditional Use Permit 18-04
Page 13 of 22
Issue Raised /Request Made Basis for Requirement
Current Procedure to Address Issue
Requirement/Status
19Project Monitoring Applicant or agent required Chapter 18.83 Conditional A condition of approval has been
Use Permits, Section
to submit an operation report included requiring the applicant to
18.83.080 Revocation
that outlines condition provide a quarterly delivery staging and
compliance for City review. operating schedule.
Any CUP may be revoked if
An operations program' shall
any of the following actions
Condition of Approval No. 25 The
be developed and submitted
occur:
Applicant or assignee shall provide a
to the City and adhered to by
A. Any violation of a
Project delivery staging and operating
all users of the container
schedule to the City for the purpose of
storage facility. Operators
required condition of
avoiding
will not be allowed to access
approval
at major City intersections. The
any local roadways other
B. Any federal, state, or
schedule shall be submitted for review
than Terrace Avenue and
local law or ordinance is
and approval by the Planning and
Barton Road.
violated in connection with
Development Services Department on
a conditionally permitted
a quarterly basis for the first three
Enforcement will be the
use.
calendar years of operation
obligation of the operator's
commencing on th
and local law enforcement
The Planning Commission
Project use begins operating.
agency.
shall hold a public hearing
to consider the proposed
revocation. The Planning
Commission makes a
recommendation to the City
Council regarding
revocation of the conditional
permitted use. The City
Council shall hold a public
hearing and make a final
determination to revoke,
amend, or leave unchanged
the subject conditional use
permit.
ЉЊЋЍА͵ЉЉЉЎΉЏЉАЋЏЎ͵Њ
Responses to the Comments/Questions Raised at the May 21, 2020 Planning Commission Hearing
Conditional Use Permit 18-04
Page 14 of 22
Issue Raised /Request Made Current Basis for Requirement Procedure to Address Issue
Requirement/Status
Operational hours. The proposed business Normal operating hours. Condition of Approval No. 3
20
hours have been revised
from Monday thru Friday Hours of operation modified to have no
from 6:00 a.m. to 10:00 p.m. business activity conducted weekends
and a total of twelve
employees. No business The proposed business hours will be
activities shall be conducted Monday thru
after 10:00 p.m. except for 10:00 p.m. and a total of twelve
emergency purposes only. employees. No business activities s
be conducted after 10:00 p.m. except
No business activities will be for emergency purposes only.
conducted on the weekends
21Patterns of how the trailer move The applicant will be required Truck stacking from Terrace Condition of Approval No. 26 The
Avenue to Barton Road Applicant shall avoid truck or trailer
to avoid movement of the
shall be prohibited. movement during Grand Terrace traffic
trailers during high peak
peak hours between 6:30 a.m. to 8:30
traffic hours
a.m. and 4:30 p.m. and 6:30 p.m.
22No weekend construction work The proposed business Normal operating hours Conditions of Approval No. 3 The
proposed business hours will be
hours will be Monday thru
Monday thru
Friday from 6:00 a.m. to
10:00 p.m. and a total of twelve
10:00 p.m.
employees. No business activities shall
be conducted after 10:00 p.m. except
No business activities will
for emergency purposes only.
take place on the weekends.
ЉЊЋЍА͵ЉЉЉЎΉЏЉАЋЏЎ͵Њ
Responses to the Comments/Questions Raised at the May 21, 2020 Planning Commission Hearing
Conditional Use Permit 18-04
Page 15 of 22
Issue Raised /Request Made Basis for Requirement Procedure to Addr
Current
Requirement/Status
23Stacking (stand by time) of trucks offsite The truck drivers will be No Standby or queuing Condition of Approval No. 26 The
because of truck drivers, what kind of based on stacking time is applicant or assignee shall avoid truck
certified.
drivers will be driving these trucks, delivery, assumed. or trailer movement during Grand
and pickup. Terrace traffic peak hours between
Stacking of vehicles or
6:30 a.m. to 8:30 a.m. and 4:30 p.m.
queuing into the project
and 6:30 p.m. Truck stacking from
entrance was not considered
Terrace Avenue to Barton Road shall
a potential impact as there is
be prohibited.
ample distance from the
entrance onto Terrace
Drive.
25Security cameras and security onsite. There are security cameras No specific requirement Included within the operation plan to be
submitted with project conditions.
proposed on-site
26Security cameras on Terrace road to help There is no requirement. No specific requirement. Staff will include a condition requiring
elevate or reduce illegal dumping on and off
camera location shall be determined by
the Director of Planning and
Development Services.
ЉЊЋЍА͵ЉЉЉЎΉЏЉАЋЏЎ͵Њ
Responses to the Comments/Questions Raised at the May 21, 2020 Planning Commission Hearing
Conditional Use Permit 18-04
Page 16 of 22
Issue Raised /Request Made Procedure to Address Issue
Current
Basis for Requirement
Requirement/Status
27Will there be guard rails on Terrace Road In response to the City of The project will be Public Works Condition of Approval No.
to make it safer that it is now? conditioned to provide a 11 Terrace from south
Colton (comments A6-8), the
minimum roadway width of Walnut shall have a Paved Road
following project condition
26 feet along Terrace Section per standard 114a
was identified (IS/MND,
Avenue. Typical vehicle barrier on the west side at a grade
Appendix I)
traffic lanes are 12 feet difference of four feet or greater below
wide. With a minimum of 26 the existing road
feet of pavement width, to be approved by City of Colton and
there is adequate lane Grand Terrace.
width to accommodate
traffic at local street posted
Addition of traffic control signs along
speed rates. As depicted on
the Terrace Avenue
Addition of acceptable guardrail,
with the City of Grand
fencing or barrier along the western
Terrace, the project
edge of Terrace Avenue from Barton
applicant has designed the
Road to the point where Terrace Road
project to provide this same
is elevated above the adjacent railroad.
roadway width on Terrace
Addition/replacement of delineators, as
Avenue in Grand Terrace.
needed, adjacent to the existing
The proposed improvement
railroad
will include the following:
Restriping of the turning/stop lane
26 feet of pavement width
intersection at Terrace and Barton
consisting of a grind and
Road; and
overlay or shoulder
Additional traffic signage at Barton
widening (subject to soils
Road indicating turning restrictions and
testing and inspection).
track traffic ahead.
Restriping of the centerline
The improvements will be maintained
in Terrace Avenue;
by the City of Grand Terrace for the
portion of Terrace Avenue north of
Vivienda Avenue. Once installed,
maintenance of Terrace Avenue south
of Vivienda Avenue will be the
responsibility of the City
ЉЊЋЍА͵ЉЉЉЎΉЏЉАЋЏЎ͵Њ
Responses to the Comments/Questions Raised at the May 21, 2020 Planning Commission Hearing
Conditional Use Permit 18-04
Page 17 of 22
Issue Raised /Request Made Basis for Requirement Procedure to Address Issue
Current
Requirement/Status
28What time does WCA landscape open? Not a CEQA requirement. There is no specific The proposed trailer
requirement. operating outside
West Coast Arborist hours are Monday thru
Friday from 6:30 a.m. to 4:30 p.m.
29Will there be any improvements to the The Traffic Impact Analysis Improvements to North Refer to R
street, residents have talked about how Terrace will be implement
does not identify safety
unsafe these streets are and putting big and widened as identified.
mitigation as the project
rigs is going to create problems how the project will be conditioned to allow
incorporate project design
much are you spending on streets. only right
features such as roadway
from intersection of Barton Road and
improvements.
Terrace Avenue. This will eliminate the
movements referenced by the City of
Colton.
30rucks can go anywhere There are adopted truck This project will not allow The operator may dictate truck routes
trucks in adjacent for drivers delivering/departing the site.
paths that prohibit trucks
neighborhoods.
from running daily operations
As appropriate, the operator of th
through neighborhoods.
project may sanction drivers who
deviate from established truck routes or
violate operating procedures.
Furthermore, it is reasonable to
anticipate that with the conditioned
Terrace Avenue improvements, the
identified route will provide the most
direct, safest, and efficient route to the
site.
It is speculative to assume trucks will
take a less direct, more constrained
and time
established neighborhoods when an
improved route exists,
ЉЊЋЍА͵ЉЉЉЎΉЏЉАЋЏЎ͵Њ
Responses to the Comments/Questions Raised at the May 21, 2020 Planning Commission Hearing
Conditional Use Permit 18-04
Page 18 of 22
Issue Raised /Request Made Basis for Requirement Procedure to Address Issue
Current
Requirement/Status
31Will there be a loss in property values? This is not a CEQA issue. Not applicable Not applicable
CEQA does not require the
consideration of social or
economic impacts (e.g.
property values) unless
those impacts result in an
identified environmental
impact. One would have to
link physical changes
resulting from the economic
effect. This analysis would
need to be supported by
opinion, argument, or
hearsay.
Per CEQA Guidelines
Section
trace a chain of cause and
effect from a proposed
decision on a project through
anticipated economic or
social changes resulting from
the project to physical
changes caused in turn by
the economic or social
analysis would always focus
on the provable and not the
underlying social/economic
change.
ЉЊЋЍА͵ЉЉЉЎΉЏЉАЋЏЎ͵Њ
Responses to the Comments/Questions Raised at the May 21, 2020 Planning Commission Hearing
Conditional Use Permit 18-04
Page 19 of 22
Issue Raised /Request Made Basis for Requirement Procedure to Address Issue
Current
Requirement/Status
32Will there be a guard rail on Terrace Road See responses to City of Refer to No. 27
added?
Colton comment letter
(IS/MND, Appendix I)
33Concerned about accidents. See response to City of New development is Public Works
required to provide roadway sidewalks curb and gutter and safety
Colton comments regarding
and sidewalk demarcation improvements which
improvements to Terrace
improvements. modernizes Terrace Avenue.
Avenue and directional
restrictions to/from Barton
Road.
ЉЊЋЍА͵ЉЉЉЎΉЏЉАЋЏЎ͵Њ
Responses to the Comments/Questions Raised at the May 21, 2020 Planning Commission Hearing
Conditional Use Permit 18-04
Page 20 of 22
Issue Raised /Request Made Basis for Requirement
Current Procedure to Address Issue
Requirement/Status
3495 trucks per day in the environmental Section 3.17 of the IS: The TIA measures trips in Using this traffic data, and taking into
document passenger car equivalents
account cumulative projects in the
(PCE). The concept of
projectspecific TIA (IS/MND, Cities of Colton, Grand Terrace an
PCEs
Appendix G) was prepared to
nearby areas of the City and County of
accounts for the larger
assess potential circulation
Riverside, the TIA determined that
impact of trucks on traffic
impacts associated with the
project-
operations by assigning
proposed project.
associated with development and
each type of truck a PCE
operation of the proposed use would
factor that represents the
The trip factor was based on
NOT exceed the established standard
number of passenger
a survey of two similar uses.
for intersections or roadway section
vehicles that could travel
The worst-case scenario
within the TIA study area.
through an intersection at
traffic generation rate of the
the same time that a
two surveys was applied to
In the absence of any exceedance of
particular type of truck
the project.
could. The proposed project
an established threshold, no significant
is estimated to generate 57
impact would occur and not mitigation
When strictly counting
PCE trips in the a.m. peak
vehicles, the project would is warranted.
hour, 31 PCE trips in the
generate 530 daily trips (26
p.m. peak hour, and 1,172
and 13 trips each in the AM
daily PCE trips.
and PM peak hour,
respectively.) The vehicle
breakdown, as detailed in
Table 5-B, Appendix G)
follows:
96 passenger vehicles
52-axel trucks
223 3-axel trucks
208 4-axel trucks
ЉЊЋЍА͵ЉЉЉЎΉЏЉАЋЏЎ͵Њ
Responses to the Comments/Questions Raised at the May 21, 2020 Planning Commission Hearing
Conditional Use Permit 18-04
Page 21 of 22
Issue Raised /Request Made Basis for Requirement Procedure to
Current
Requirement/Status
35Changing the zoning The zoning is M2 Industrial M2 Industrial Zoning The proposed use is consis
supports outdoor storage Municipal Code and General Plan
Manufacturing with Flood
type of uses, including
Plain Overlay
Heavy equipment sales and
The site is designated
repair, outdoor public
Floodplain Industrial on the
storage facilities, outdoor
General Plan Land Use Map
recreational vehicle
storage, etc.
Change of zoning is not a
part of the project.
The project does not include
a General Plan Amendment
or zone change; however, a
determination of use was
filed with this project. The
truck and trailer storage
facility use
uses within the M2 Zone,
including, without limitation,
the following: Automotive
office and storage yards;
heavy equipment sales and
service; public storage
facilities; and wholesale
storage and distribution
facilities.
ЉЊЋЍА͵ЉЉЉЎΉЏЉАЋЏЎ͵Њ
Responses to the Comments/Questions Raised at the May 21, 2020 Planning Commission Hearing
Conditional Use Permit 18-04
Page 22 of 22
Issue Raised /Request Made Basis for Requirement Procedure to Address Issue
Current
Requirement/Status
36Does a property owner have to benefit the This is not a CEQA issue. There are General Plan Every project has the potential to be of
community to develop his own property? goals and policies which benefit to the community. As
CEQA does not require the
promote high level community matures, so does the
consideration of social or
improvement. demand on maintenance and
economic impacts (e.g.
infrastructure. Benefit can be
property values
interpreted in a positive manner so
Grand Terrace can continually strive to
improve.
ЉЊЋЍА͵ЉЉЉЎΉЏЉАЋЏЎ͵Њ
Packet Pg. 70
H
T
R
U
O
O
D
S
I
R
E
R
V
I
O
R
C
D
T
R
O
A
P
I
C
A
R
D
.
N
E
D
A
C
A
S
L
S
E
C
C
A
N
D
O
T
N
L
A
E
O
R
C
C
G
A
F
R
F
O
R
O
E
Y
Y
T
T
T
I
I
C
C
T
R
O
P
I
C
A
R
D
.
N
D
O
T
N
L
A
E
O
R
C
C
G
A
F
R
F
O
R
O
E
Y
Y
T
T
T
I
I
C
C
W
/
R
.
R
.
R
F
S
N
B
T
E
E
R
T
S
C
I
L
B
U
P
PARCEL 1
APN: 0275-191-30
C.1.f
AGENDA REPORT
MEETING DATE:May 21, 2020
TITLE:Conditional Use Permit 19-01, Site and Architectural Review
19-03 and Environmental 19-05; a Proposal to Establish a
Trailer/Container Storage Facility, Located 520 Feet from
Vivienda Avenue and South of the Santa Ana River Tail
(APN's: 0275-191-06 and 0275-191-30)
PRESENTED BY:Steven Weiss, Planning & Development Services Director
RECOMMENDATION:Conduct a public hearing; and
2)Consider Adoption of A RESOLUTION OF THE
PLANNING COMMISSION/SITE AND ARCHITECTURAL
REVIEW BOARD OF THE CITY OF GRAND TERRACE,
CALIFORNIA, ADOPTING A MITIGATED NEGATIVE
DECLARATION (ENVIRONMENTAL 19-05) PURSUANT
TO THE CALIFORNIA ENVIRONMENTAL QUALITY ACT
(CEQA) AND APPROVING CONDITIONAL USE PERMIT
19-01 AND SITE AND ARCHITECTURAL REVIEW 19-03
TO DEVELOP A TRAILER/CONTAINER STORAGE
FACILITY FOR A MAXIMUM OF 650 PARKING SPACES
FOR EMPTY SEMI-TRAILERS, SHIPPING AND STORAGE
CONTAINERS, AND CHASSIS USE ON A 21.92-ACRE
-
191-06 AND 0275-191-30 IS CURRENTLY
UNDEVELOPED AND IS LOCATED APPROXIMATELY
520 FEET NORTH OF VIVIENDA AVENUE AND SOUTH
OF THE SANTA ANA RIVER TRAIL IN THE
NORTHWESTERN PORTION OF THE CITY
2030 VISION STATEMENT:
This item supports Goal 3 to Promote Economic Development by establishing a use that
is consistent with the Industrial Zoning District designation.
BACKGROUND:
The applicant, Grand T-is proposingto develop a
trailer/container storage facility. The project will provide a maximum of 650 parking
spaces for semi-trailers, shipping and storage containers, and chassis. Site
improvements include: installation of perimeter fencing (6-foot tall chain linkwith vines),
a paved, gated entrance and turn-around area, a 60-foot wide asphalt concrete central
access road, perimeter 26-foot wide slag access road, security cameras, on-site
Packet Pg. 74
C.1.f
security light poles with light-emitting diode (LED) fixtures, landscaping, and an
acceptable parking surface for the interior areas of the site. The project includes
deliveries and pickup of containers to/from the site via a single, gated entrance located
from the public road on the western edge of the site. All traffic to/from the site will be
routed from Barton Road (from either La Cadena Drive or the I-215/Barton Road
Interchange) onto Terrace Avenue to the project site. Trucks will exit onto Barton Road
-The site is zoned M2-Industial with Floodplain and Agricultural 2 Overlay
Districts.
On May 28, 2019, a community meeting was held to introduce the project and promote
community input. The meeting was attended by approximately 15 residents mostly
living on the bluff top to the West and South of the project site. They expressed air
quality, traffic, aesthetic, and noise concerns that the project could generate. There was
also concern regarding trucks using the Vivienda and Walnut Avenue neighborhoods as
a cut through.
Since the meeting, the applicant has worked with City staff to refine the project. This
project includes improvements/community benefits outside the scope of a standard
development plan that the applicant has voluntarily agreed to provide and pay for such
as a Community Garden with a grove of fruit trees; a trail connection to the Santa Ana
River Trail with an ornate sign, access road improvements and a teaching amphitheater
at Fitness Park. The applicant has also voluntarily committed to making a monetary
donation for future City street maintenance.
These improvements/community benefits will be memorialized in the form of a
which will be considered by the City Council at a future
date.
ANALYSIS:
The Planning Commission has the authority to approve the Conditional Use Permit (as
submitted and reviewed) proposing to conduct a trailer/truck storage trailer. This
approval does not include on-site activities open to the public. There are no proposed
structures or additions to be constructed at this time.
The project might include for future consideration through review and approval of an
Attachment: 05-21-2020 PC Cont SR (CUP 19-01, SA 19-03 and E 19-05)
Administrative Conditional Use Permit a proposed 900-square foot modular office on the
western edge of the site and a 4,800-square foot maintenance building/shed located
along the eastern edge of the site. The pad areas are denoted and have been assumed
within the environmental documentation.
The proposed use is considered an industrial truck and trailer storage facility ("Project").
The Site is currently zoned Heavy Industrial (M-2), with a small portion of the northern
boundary within an Agricultural Overlay District (AG). Most of the Site (20 acres) would
be utilized for the Project's storage facility. The Site is currently vacant, although has
been constrained with construction of both underground and above ground wet and dry
Packet Pg. 75
C.1.f
utility improvements, water wells,pump stations, and overhead electrical lines.
The City's General Plan designates the Site as Floodplain Industrial. The proposed
industrial truck and trailer storage facility use is "similar in nature" to several permitted
uses within the M-2 Zone, including, without limitation, the following: Automotive related
services; Contractor's office and storage yards; Heavy equipment sales and service;
Public storage facilities; and, Wholesale storage and distribution facilities. (Zoning
Code, §§ 18.40.020, subds. (B), (G), (H), (Q).) Therefore, in accordance with Section
18.40.020, subdivision (S) of the Zoning Code, the Planning and Development Services
Director, through a determination of use characterized the Project to be a conditionally
permitted use within the M-2 Zone. In addition, to the project being similar in nature to
other permitted uses, it is similar in nature and consistent with surrounding land uses.
The Site, as mentioned, is unique in that it also is impacted with flood plain conditions,
significant overhead utility transmission lines, towers and easements (affecting
approximately 1/3 of the site) and adjacent to a major flood control channel (Santa Ana
River) and two (2) railroad corridors, thereby separated by a public and private roadway
easements abutting two privately owned parcels.
The proposed operations intended for the subject property will support local and
regional business operations associated with the 'fulfillment centers', delivery services,
retail merchants, and major wholesale retailers such as COSTCO, Amazon, UPS,
Ashley Furniture and others. In the movement of goods and services through our region
these companies require a network of facilities to augment their existing locations and
operations primarily consisting of the storage and movement of trailers and containers.
With the growing and increasing operations of goods and services movement, the goal
with locating sites within the target delivery areas is to reduce truck traffic on roads and
highways by augmenting rail served facilities already located along the I-215 corridor. In
supporting these existing operations by storing their empty and overflow container/trailer
activities locally, there is a significant reduction in these empty containers being
transported out of the area back to Los Angeles, Long Beach and 'out of state' locations
only to return into the region for deliveries or restocking. Storing the trailer for
immediate transport will lessen demand for truck trailers illegally parking on Grand
Attachment: 05-21-2020 PC Cont SR (CUP 19-01, SA 19-03 and E 19-05)
A maximum of 650 total semi-trailers, shipping and storage containers and chassis will
be stored on the Site at any given time. There will be a maximum of twelve (12) total
employees assigned to the Site whose duties will include internal transportation of
trailers, chassis and storage containers and general operation of the Project facilities.
As conditioned, hours of operation for the Project will be Monday through Saturday 6:00
a.m. to 10:00 p.m. On occasion, it may be necessary to access the Project Site after
10:00 p.m. and/or weekends; however, such access and activity will be rare and strictly
conditioned to ensure there will be no additional impacts upon the surrounding
community.
The proposed improvements for the Project shall consist of perimeter fencing, a paved
Packet Pg. 76
C.1.f
entranceand turnaround area, security cameras, landscaping, and an acceptable
parking surface for the interior areas of the site to be utilized for storage of semi-trailers,
shipping and storage containers, chassis and related equipment. The Applicant will
conduct street sweeping as necessary and consider installation of temporary metal
shaker plates at the Site's entrance/exit to minimize and eliminate track out. The storage
containers and chassis do not contain oil, except in sealed axles which are covered by
wheel hubs and do not leak thereby preventing any impacts to soil or hardscape
surfaces.
The Site is previously disturbed and currently maintained for weed abatement and
occasional debris removals. There is no evidence that the Site contains or is utilized as
habitat for endangered, rare or threatened species. However, the site must abide by
biological and Native American monitoring and mitigation.
Approval of the project would not result in any significant effects relating to traffic, noise,
air quality, or water quality; and, because the Project will create the opportunity to
remove trucks from the Southern California transportation network. approval of the
Project will result in reduced wear and tear on local and regional roadways and reduced
environmental impacts related to traffic, noise and air. Regional and community traffic
between LA I Port of Long Beach and the 'user facilities' mentioned herein is inefficient
and environmentally detrimental to the region.
The trailers will be managed between the Site and 'user facilities' in an organized
manner, employing appropriate traffic safety precautions.
The trailers will be transported using CARB compliant utility trucks. The utility trucks will
be actively maintained by contract vendors and operated by employee drivers. The
trailers will be free from leakage of oil, coolant, hydraulic and other fluids and will be
inspected frequently. The trailers will not contain oil except in sealed axles which are
covered by wheel hubs and do not leak. There will be no fuel containing vehicles stored
on the Site. Further, because the trailers will be moved to and from 'corporate business
sites' the operator/manager is particularly interested in ensuring that operations are
clean so that the quality of operations is not compromised.
ENVIRONMENTAL REVIEW:
Attachment: 05-21-2020 PC Cont SR (CUP 19-01, SA 19-03 and E 19-05)
Pursuant to the California Environmental Quality Act (CEQA), an Initial Study has been
prepared for the above-described project. Based on the Initial Study and supporting
information, the City intends to adopt a Mitigated Negative Declaration (Environmental
19-05). The project will not have a significant effect on the environment due to the
incorporation of standard conditions and mitigation measure(s) related to: Biological,
Cultural, and Tribal Cultural Resources, and Geology/Soils.
PUBLIC NOTICE:
The public hearing notice was published in the Grand Terrace City News, posted in
three public places and mailed to property owners within a 1,500-foot radius of the site.
Packet Pg. 77
C.1.f
Comments were receivedduring public distribution ofthe environment document. No
additional comments have been received as a result of this notice. Should Staff receive
comments, they will be forwarded to the Planning Commission as part of the official
record.
RECOMMENDATION:
Staff recommends the Planning Commission considers adoption of the attached
Resolution approving the project.
ATTACHMENTS:
RESOLUTION NO OBrian_4.30.2020 (DOCX)
Exhibits to the Resolution (PDF)
17164 truck trailer storage site plan rev 2 (PDF)
Landscape Enhancement Exhibit (PDF)
Asphalt Grindings RAP (Recycled Asphalt Pavement Info.) (PDF)
APPROVALS:
Steven Weiss Completed 05/12/2020 11:25 AM
Robert Khuu Completed 05/14/2020 11:02 AM
Steven Weiss Completed 05/14/2020 12:24 PM
Planning Commission/Site And Architectural Review Board Completed 05/21/2020
6:30 PM
Planning Commission/Site And Architectural Review Board Pending 06/18/2020 6:30
PM
RESULT: CONTINUED Next: 6/18/2020 6:30 PM
Attachment: 05-21-2020 PC Cont SR (CUP 19-01, SA 19-03 and E 19-05)
Packet Pg. 78
C.1.g
Attachment: NOI Commnets from Colton and Responses (CUP 19-01, SA 19-03 and E 19-05)
Packet Pg. 79
C.1.g
Attachment: NOI Commnets from Colton and Responses (CUP 19-01, SA 19-03 and E 19-05)
Packet Pg. 80
C.1.g
Attachment: NOI Commnets from Colton and Responses (CUP 19-01, SA 19-03 and E 19-05)
Packet Pg. 81
C.1.g
RESPONSE TO COMMENT LETTER A
January 9, 2020
City of Colton
Mark Tomich, AICP
Development Services Director
Response to Comment A-1: The project is currently undeveloped. Existing on-site features include power
transmission poles and towers and well casings associated with the West Riverside Canal. High voltage
electrical towers cross the property from north to south in two locations with a second set of power lines
running across the property in an east-to-west direction. The project area has been subjected to
disturbance from weed abatement disking and other earthmoving activities. On-site structures will be
limited to the construction of a 900-square foot modular office on the western edge of the site and a
4,800-square foot maintenance building/shed located along the eastern edge of the site.
The following figures identify the general appearance of the proposed modular office and metal
maintenance structure, respectively.
Attachment: NOI Commnets from Colton and Responses (CUP 19-01, SA 19-03 and E 19-05)
Appendix I: Responses to Public Comments I-5
Packet Pg. 82
C.1.g
Ancillary structures on nearby properties include barns, storage buildings, and garages. The proposed
structures are not dissimilar in size, style, or scale to existing structures located on nearby properties. It
must be noted the site is located within an area previously designated for the development of industrial
uses. While the project will alter the existing visual condition of the site, the City has not designated views
to or through the site as significant. Neither the height of the structures nor the storage of trailers/
containers would obstruct background views of the San Bernardino and San Gabriel Mountains.
In the absence of a new significant impact or increase in severity of an existing impact, no recirculation of
the IS/MND is warranted.
Response to Comment A-2:The site sits at a finished grade on average 12 feet (or greater) below any
adjacent public roads. Containers will be either stored on a chassis or removed from the chassis with a
forklift and stacked on grade to a maximum height of 16 feet. Chassis that are stored may also be stacked
to a maximum height of 12 feet.
Currently, existing street trees and the rail line partially obstruct views of the site from La Cadena Drive.
The elevation of the rail line approaching Tropica Ranch Road nearly cuts off views of the site from La
Cadena Drive (see photograph below).
Attachment: NOI Commnets from Colton and Responses (CUP 19-01, SA 19-03 and E 19-05)
Appendix I: Responses to Public Comments I-6
Packet Pg. 83
C.1.g
Along the southern portion of the property, the proposed six-foot tall chain link fence will be slated or
screened with landscaping. Where a barrier is provided, chain link fencing is typically used along the Santa
Ana River Trail and adjacent developed uses. Furthermore, the installation of masonry walls along the
northern and western edges of the site could increase the potential for graffiti.
While the City of Colton’s preference for a masonry wall is noted, due to the site’s elevation, obstructions
to current views from La Cadena Drive, the project’s provision of slatted or screened fencing and typical
manner of fencing used along the Santa Ana River Trail, the installation of masonry walls is not warranted.
The City of Colton’s comment will be fully considered prior to project approval.
In the absence of a new significant impact or increase in severity of an existing impact, no recirculation of
the IS/MND is warranted.
Response to Comment A-3: As stated in Section 3.3.9a (page 50) of the IS/MND, project operations would
be limited to heavy-duty trucks entering the project site, drop off/pick up of empty storage containers,
and light inspection replacement and/or safety checks related maintenance of trucks. The project would
generally accommodate storage of trailers, storage containers, and chassis from the various
manufacturing, distribution, and logistics center uses in the surrounding region. The proposed project will
be storing empty trailers/containers only. Trucks will enter, exit, and stage for periods of time on site.
Limited amounts of vehicle fluids, paint products, lubricants, solvents, and cleaning products may be used
and/or stored in the proposed vehicle inspection building. Activity at his building will be limited to light
Attachment: NOI Commnets from Colton and Responses (CUP 19-01, SA 19-03 and E 19-05)
inspection replacement, safety check related items, and minor “repair and replace” of needed equipment
(e.g., mirrors, lights). Any major maintenance and/or repairs required will be performed off site. Due to
the limited quantities of these materials to be used, they are not considered hazardous to the public at
large. The transport, use, and storage of hazardous materials during construction would be regulated by
the Grand Terrace Fire Service, under contract with the San Bernardino County Fire Department, in
accordance with the City’s Hazard Mitigation Plan and California Occupational Safety and Health
Administration regulations.
Appendix I: Responses to Public Comments I-7
Packet Pg. 84
C.1.g
No new impact was identified nor was the severity of an existing impact increased; therefore, revision or
recirculation of the IS/MND is not required.
Response to Comment A-4: The Initial Study (page 62) states, “The proposed project uses are consistent
with uses conditionally permitted under the General Plan land use and zoning designations for the project
site, including the M2 Industrial designation and the M2 Industrial with Floodplain and Agricultural AG-2
Overlay zoning designations. The proposed project uses are also compatible with surrounding residential
uses to the north, east, and south.”
The project site is bounded on three sides by the City of Colton.To the north, past an active rail line and
La Cadena Drive, land zoned I-P (Industrial Park) has been approved for the development of approximately
260,000 square feet of warehouse uses and 214 trailer parking stalls. North of the Santa Ana River, M-1
(Light Industrial) uses include outdoor lumber and pallet storage. Land zoned OS-RS (Open Space
Resources) is located to the east. Residential uses (mobile homes) are located over 800 feet beyond the
site’s eastern border. In the City of Grand Terrace, undeveloped land and three rural residential uses are
located to the south within the City’s M-2 (Industrial Zone). The residential uses are located approximately
400 to 770 feet from the area of the site where active operations will occur. Additional residential uses,
R1-7.2 (Single Family), are located approximately 890 feet south of areas of the site where active
operations will occur.
No new impact was identified nor was the severity of an existing impact increased. Recirculation of the
IS/MND is not warranted.
Response to Comment A-5: The existing ambient 24-hour CNEL noise level is 63 dBA resulting from
occasional train activity in the project area and traffic on La Cadena Drive. Existing nighttime ambient
noise levels in the project area reach up to 69 dBA Land 64 dBA L.
2 8
Generally, the residential areas referenced by the commenter are located within 350 feet of the industrial
uses on Terrace Road, Barton Road, and De Berry Street. The closest residences southwest and east of the
project in the City of Colton are 1,020 feet and 850 feet, respectively, from forklift activities. The City of
Colton’s exterior noise is 65 dBA. As detailed in Table K of the project-specific noise study, the maximum
noise level generated by a forklift is assumed to be approximately 85 dBA L at 50 feet. Due to the
max
distance between the site and nearest residences in Colton, noise levels generated from forklift operations
would be attenuated by 26 dBA and 25 dBA, respectively. Forklift noise would therefore be attenuated to
59 dBA L and 60 dBA L, respectively, at the nearest residences in Colton. These levels are below the
maxmax
existing 24-hour CNEL nighttime ambient noise levels for the project area.
As the noise level from forklifts would not exceed the City of Colton’s exterior noise standard, single-event
or “background” noise from beeping of the forklifts will be addressed with advanced noise muffling. The
following condition has been identified to minimize noise from forklift operations to the maximum extent
feasible:
Attachment: NOI Commnets from Colton and Responses (CUP 19-01, SA 19-03 and E 19-05)
Prior to the issuance of grading or building permits, whichever is submitted first, the applicant shall
provide evidence to the Planning and Development Services Director that an application has been
submitted to the United States Occupational Safety and Health Administration (OSHA) to permit an
alternative to back-up alarms on forklifts and/or yard goats for the purpose of lessening the noise and
frequency of standard back-up apparatus. Alternative back-up alarm equipment shall be reviewed
Appendix I: Responses to Public Comments I-8
Packet Pg. 85
C.1.g
and approved by OSHA and the Director of Development Services prior to the issuance of the first
certificate of use and occupancy.
The comment does not identify a new impact or increase the severity of a previous identified impact;
therefore, no revision or recirculation of the IS/MND is warranted.
Response to Comment A-6:The project applicant is proposing to evaluate the existing street section
on Terrace Avenue and “improve”the roadway to provide for a pavement width of 26 feet. This
work can be completed within the existing public right-of-way. The centerline of Terrace Avenue
would be restriped and appropriate signage added along with edge-of-pavement delineators on the
westerly shoulder. In addition to pavement delineators along the western edge of Terrace Avenue,
the following project condition shall improve vehicle safety.
Prior to the issuance of the first certificate of use and occupancy, the applicant shall install a guardrail,
fencing or other barrier along the western edge of Terrace Avenue from Barton Road to the point
where Terrace Road is elevated above the adjacent railroad. The type, location, and installation of the
required feature shall be coordinated/approved by/between the Public Works Directors of the Cities
of Grand Terrace and Colton.
The project will be conditioned to ensure the appropriate improvements are in place prior to the
commencement of any on-site operation involving the delivery of containers/trailers.
As no new significant or impact of increased severity has been identified, revision and/or recirculation of
the IS/MND is not required.
Response to Comment A-7: Terrace Avenue has been used for 30 years to provide access from Barton
Road to current and former operators of the adjacent industrial use (Lineage/Stater Bros). The current
condition of the roadway is the result of past use and absence of roadway maintenance. Currently, a
sidewalk provides pedestrian access along Terrace Avenue from Barton Road to Walnut Avenue. The
project will not alter access to the existing sidewalk.
The project will be conditioned to provide a minimum roadway width of 26 feet along Terrace Avenue.
Typical vehicle traffic lanes are 12 feet wide. With a minimum of 26 feet of pavement width, there is
adequate lane width to accommodate traffic at local street posted speed rates. As depicted on the
project’s site plan on file with the City of Grand Terrace, the project applicant has designed the project to
provide this same roadway width on Terrace Avenue in Grand Terrace. The proposed improvement will
include the following:
26 feet of pavement width consisting of a grind and overlay or shoulder widening (subject to soils
testing and inspection);
Restriping of the centerline in Terrace Avenue;
Attachment: NOI Commnets from Colton and Responses (CUP 19-01, SA 19-03 and E 19-05)
Addition of traffic control signs along the Terrace Avenue right-of-way;
Addition of acceptable guardrail, fencing or barrier along the western edge of Terrace Avenue from
Barton Road to the point where Terrace Road is elevated above the adjacent railroad.
Addition/replacement of delineators, as needed, adjacent to the existing railroad right-of-way;
Restriping of the turning/stop lane intersection at Terrace and Barton Road; and
Appendix I: Responses to Public Comments I-9
Packet Pg. 86
C.1.g
Additional traffic signage at Barton Road indicating turning restrictions and track traffic ahead.
The improvements will be maintained by the City of Grand Terrace for the portion of Terrace Avenue
north of Vivienda Avenue. Once installed, maintenance of Terrace Avenue south of Vivienda Avenue will
be the responsibility of the City of Colton.
The project will be conditioned to ensure the appropriate improvements are in place prior to the
commencement of any on-site operation involving the delivery of containers/trailers. As no new
significant or impact of increased severity has been identified, revision and/or recirculation of the
IS/MND is not required.
Response to Comment A-8: The project will be conditioned to allow only right-in and left-out movements
from intersection of Barton Road and Terrace Avenue. This will eliminate the “difficult and very
problematic” turning movements referenced by the commenter. The project proposes slight
modifications to striping on Barton Road to facilitate right-turn movements onto Terrace Avenue. Signage
will be added along Terrace Avenue and Barton Road announcing prohibitions of right turns (Terrace
Avenue to Barton Road) and left turns (Barton Road to Terrace Avenue), respectively. The operator of the
project will enforce these turning restrictions on delivery/drop-off drives as a standard operating
condition.
As no new significant or impact of increased severity has been identified, revision and/or
recirculation of the IS/MND is not required.
Response to Comment A-9: The City of Colton has previously conditioned an industrial development
located on La Cadena Drive (at Tropica Rancho Road) to close off the referenced railroad underpass. As
detailed in “Traffic Flow Exhibit, La Cadena Drive and W. Tropica Rancho Road” access to the underpass
will be achieved by a barricade with Knox box.
This comment does not identify a new impact or increase in the severity of a previously identified impact;
therefore, no recirculation of the IS/MND is warranted.
Response to Comment A-10: As detailed in Figure 2 (Site Plan) of the IS/MND, the existing 16-inch water
main and 24-inch sewer main referenced by the commenter is located just north of the project, south of
the Santa Ana River Trail. No activity or ground disturbance or operational activity will occur in this area;
therefore, no protection measures are required. It is anticipated that maintenance of these facilities can
be conducted either through access along the Santa Ana River Trail or through an agreement with the
property owner.
This comment does not identify a new impact or increase in the severity of a previously identified impact;
therefore, no recirculation of the IS/MND is warranted.
Attachment: NOI Commnets from Colton and Responses (CUP 19-01, SA 19-03 and E 19-05)
Appendix I: Responses to Public Comments I-10
Packet Pg. 87
C.1.h
Attachment: Asphalt Grindings RAP (Recycled Asphalt Pavement Info.) (CUP 19-01, SA 19-03 and E 19-05)
Packet Pg. 88
C.1.h
Attachment: Asphalt Grindings RAP (Recycled Asphalt Pavement Info.) (CUP 19-01, SA 19-03 and E 19-05)
Packet Pg. 89
C.1.h
Attachment: Asphalt Grindings RAP (Recycled Asphalt Pavement Info.) (CUP 19-01, SA 19-03 and E 19-05)
Packet Pg. 90
C.1.h
Attachment: Asphalt Grindings RAP (Recycled Asphalt Pavement Info.) (CUP 19-01, SA 19-03 and E 19-05)
Packet Pg. 91
C.1.h
Attachment: Asphalt Grindings RAP (Recycled Asphalt Pavement Info.) (CUP 19-01, SA 19-03 and E 19-05)
Packet Pg. 92
C.1.h
Attachment: Asphalt Grindings RAP (Recycled Asphalt Pavement Info.) (CUP 19-01, SA 19-03 and E 19-05)
Packet Pg. 93
D.1
AGENDA REPORT
MEETING DATE:July 16, 2020
TITLE:Presentation Regarding Nonconforming Use & Building
Regulations in the Grand Terrace Municipal Code, and
Nonconforming Uses & Buildings in Grand Terrace
PRESENTED BY:Haide Aguirre, Assistant Planner
RECOMMENDATION:Receive and file.
BACKGROUND:
On May 21, 2020, the Planning Commission requested Staff to provide an update
regarding nonconforming properties in the city.
The Commission requested Staff identify locations in Grand Terrace where all
nonconforming properties are located.
DISCUSSION
The City established requirements for nonconforming uses and buildingsin 1990and
was amended in 1994. Such requirements state that ifoperations of a lawfully
establishednonconforming use cease operation fora period of six months, the
nonconforming use must comply withthe current zoning.
The Municipal Code Chapter 18.06
means a use of a building or land existing on the effective date of the ordinance codified
in this title which does not conform to the uses permitted in the zone in which it is
located.
may continue; provided, that no such use shall be
enlarged or increased, not be extended to occupy a greater area than that occupied by
such use at the time of the adoption of the ordinance codified in this title.
,which was not held for lack of quorum,
Staff prepared a Memo for the Commission(attached)which containedthe following
additional information:
1.Nonconforming Lawful (Legal Nonconforming), Nonconforming Vacant,
Nonconforming in Violation PropertiesTable
2.Nonconforming Properties Aerial Views
3.Chapter 18.76 Nonconforming uses and Buildings (Municipal Code)
Packet Pg. 94
D.1
ATTACHMENTS:
Planning Commission Memo_Comments to the Commission_Pc meeting
6.18.2020-SW (PDF)
APPROVALS:
Steven Weiss Completed 07/08/2020 3:54 PM
City Attorney Completed 07/08/2020 3:59 PM
Steven Weiss Completed 07/08/2020 4:10 PM
Planning Commission/Site And Architectural Review Board Pending 07/16/2020 6:30
PM
Packet Pg. 95
D.1.a
Attachment: Planning Commission Memo_Comments to the Commission_Pc meeting 6.18.2020-SW (Nonconforming Uses and Buildings)
D.1.a
Planning Commission Memo
Information to the Planning Commission –Nonconforming Uses
Page 2of2
B. The nonconforming use of a portion of a building may be extended throughout
the building; provided, that in each case a use permit shall first be obtained.
C. The nonconforming use of a building may be changed to a use of the same or
more restricted nature; provided, that in each case a use permit shall first be
obtained.
D. If the nonconforming use of a building and/or operations within a building
ceases for a continuous period of six months, it shall be considered terminated and
thebuilding shall thereafter be used only in accordance with the regulations for the
district in which it is located.
Section 18.76.032 –Termination –Violation of Laws“Any of the following
violations of the municipal code shall immediately terminate the rightto operate a
nonconforming use except as otherwise provided:
T
A. Changing a nonconforming use to a usenot permitted in the zone.
B.Increasing or enlarging the area, space or volume occupied by or devoted to
such non-conforminguse.
C. Addition to a nonconforming use of another use notpermitted in the zone.
(The term “Grandfathered”is not a term identifiedin the Municipal Code. Thecorrect
termsareNonconformingor Legal Nonconforming).
ThePlanning and Development Services Department has identifiedtwenty-two(22)
legalnonconforming properties, six(6)nonconforming properties, and one (1) in
violation.
Per your request, a tablehasbeen prepared identifying twenty-two(22)
nonconforminglawful (legal nonconforming) properties, six(6) nonconforming
vacantproperties,and one(1) property in violation,hereby attached as Exhibit A.
Aerial viewsof the identified properties havebeen attached as Exhibit B
Attached is Chapter 18.76 –NonconformingUses and Buildings formthe
Municipal Code.
Attachment: Planning Commission Memo_Comments to the Commission_Pc meeting 6.18.2020-SW (Nonconforming Uses and Buildings)
Packet Pg. 97
NONCONFORMINGLAWFUL (LEGAL NONCONFORMING),NONCONFORMING
NONONCONFORMING IN VIOLATIONPROPERTIES
*Theseproperties are nonconforming/vacantand may not be longer utilized as residentialbecause the legal nonconforming
terminated pursuant of the Municipal Code, Chapter 18.76 –Nonconforming Uses and Buildings
**Properties in Violation
PROPERTY ZONINGGENERAL PLAN EXISTING USELEGAL
ADDRESSDESIGNATIONNONCONFORMING
22172 Barton RoadBRSP, General General CommercialPrior Residential Nonconforming/Vacant*
1
CommercialVacant
22220 Barton RoadBRSP, General General CommercialResidentialLegal Nonconforming
2
Commercial
22238 Barton RoadBRSP, General General CommercialResidentialLegal Nonconforming
3
Commercial
22300 Barton RoadBRSP, General General CommercialResidentialLegal Nonconforming
4
Commercial
22805 Barton RoadBRSP, Administrative Office CommercialPrior Residential Nonconforming/Vacant*
5
Professional Vacant
21992 De Berry CM-Commercial Mixed UseResidentialLegal Nonconforming
6
StreetManufacturing
21911 De Berry CM-Commercial Mixed UseResidential Legal Nonconforming
7
StreetManufacturing
21899 De Berry CM-Commercial Mixed UseResidential Legal Nonconforming
8
StreetManufacturing
21877 De Berry CM-Commercial Mixed UseResidential Legal Nonconforming
9
StreetManufacturing
21875 De Berry CM-Commercial Mixed UseResidential Legal Nonconforming
10
StreetManufacturing
21750 Main StreetRestricted General Commercial Abandoned, Nonconforming/Vacant*
11
ManufacturingUnder
Remediation
12458 Michigan CM-Commercial General CommercialResidential Legal Nonconforming
12
StreetManufacturing
12466 Michigan CM-Commercial General CommercialPrior Residential Nonconforming/Vacant*
13
StreetManufacturingVacant
22740 Palm AvenueBRSP, Administrative Office CommercialResidentialLegal Nonconforming
14
Professional
22832 Palm AvenueBRSP, Administrative Office CommercialResidentialLegal Nonconforming
15
Professional
NONCONFORMINGLAWFUL (LEGAL NONCONFORMING),NONCONFORMING
NONONCONFORMING IN VIOLATIONPROPERTIES
22756 Palm AvenueBRSP, Administrative Office CommercialPrior Residential Nonconforming/Vacant*
1 6
Professional Vacant
22846 Palm AvenueBRSP, Administrative Office CommercialResidentialLegal Nonconforming
17
Professional
22858 Palm AvenueBRSP, Administrative Office CommercialResidentialLegal Nonconforming
18
Professional
22872 Palm AvenueBRSP, Administrative Office CommercialResidentialLegal Nonconforming
19
Professional
22892 Palm AvenueBRSP, Administrative Office CommercialResidentialLegal Nonconforming
20
Professional
12072 Preston StreetBRSP, Administrative Office CommercialResidentialLegal Nonconforming
21
Professional
12026 Preston StreetBRSP, Administrative Office CommercialResidentialLegal Nonconforming
22
Professional
12108 Preston StreetBRSP, Administrative Office CommercialResidentialLegal Nonconforming
23
Professional
11701 Terrace AveM2-IndustrialFloodplain Industrial ResidentialLegal Nonconforming
24
FP-Floodplain District
AG2-Overlay District
22040 Van Buren CM-Commercial General CommercialResidential Legal Nonconforming
25
StreetManufacturing
22002 Van Buren CM-Commercial General CommercialPrior Residential Nonconforming/Vacant*
26
StreetManufacturingVacant
21996 Van Buren CM-Commercial General CommercialResidential Legal Nonconforming
27
StreetManufacturing
21816 Vivienda AveM2-IndustrialFloodplain IndustrialResidentialLegal Nonconforming
28
FP-Floodplain District
AG2-Overlay District
21712 Vivienda AveM2-IndustrialFloodplain IndustrialPrior ResidentialNonconforming/In Violation**
29
FP-Floodplain DistrictShould be Vacant
AG2-Overlay District
D.1.a
Packet Pg. 100
D.1.a
Packet Pg. 101
D.1.a
Packet Pg. 102
D.1.a
Packet Pg. 103
D.1.a
Packet Pg. 104
D.1.a
Chapter 18.76 - NONCONFORMING USES AND BUILDINGS
Sections:
18.76.010 - Purpose.
The purpose of this chapter is to establish the permitted use, expansion and maintenance of
nonconforming uses and buildings located within the city.
(Ord. 151 § l(part), 1994: Ord. 126 § 2, Exh. A(part), 1990)
18.76.020 - Nonconforming use of land.
The lawful use of land existing at the time of the adoption of the ordinance codified in this title,
although such use does not conform to the regulations, specified in this title for the district in which such
land is located, may be continued; provided, that no such use shall be enlarged or increased, nor be
extended to occupy a greater area than that occupied by such use at the time of the adoption of the
ordinance codified in this title, and when any such use ceases the subsequent use of such land shall be
in conformity to the regulations specified by this title for the district in which such land is located.
(Ord. 151 § 1(part), 1994: Ord. 126 § 2, Exh. A(part), 1990)
18.76.030 - Nonconforming use of buildings.
A. The lawful use of a building existing at the time of the adoption of the ordinance codified in this title
may be continued, although such use does not conform to the regulations specified for the district in
which the building is located.
B. The nonconforming use of a portion of a building may be extended throughout the building; provided,
that in each case a use permit shall first be obtained.
C. The nonconforminguse of a building may be changed to a use of the same or more restricted
nature; provided, that in each case a use permit shall first be obtained.
D. If the nonconforming use of a building and/or operations within a building ceases for a continuous
period of six months, it shall be considered terminated and the building shall thereafter be used only
in accordance with the regulations for the district in which it is located.
(Ord. 151 § 1(part), 1994: Ord. 126 § 2, Exh. A(part), 1990)
18.76.031 - Termination—Discontinuance of use.
A. Such discontinuance of the active and continuous operation of such nonconforming use, or part or
portion thereof, for such periods, is construed and considered to be an abandonment of such
nonconforming uses, regardless of any reservation of an intent not to abandonsame or of an intent
to resume active operations.
B. If actual abandonment in fact is evidenced by the removal of buildings, structures, machinery,
equipment and other evidences of such nonconforming use of the land and premises, the
abandonment shall be construed and considered to be completed within a period of six months and
all rights to reestablish or continue such nonconforming use shall thereupon terminate.
(Ord. 151 § 1(part), 1994)
Attachment: Planning Commission Memo_Comments to the Commission_Pc meeting 6.18.2020-SW (Nonconforming Uses and Buildings)
Packet Pg. 105
D.1.a
18.76.032 - Termination—Violation of laws.
Any of the following violations of the municipal code shall immediately terminate the right to operate
a nonconforming use except as otherwise provided:
A. Changing a nonconforming use to a use not permitted in the zone;
B. Increasing or enlarging the area, space or volume occupied by or devoted to such
nonconforming use;
C. Addition to a nonconforming use of another use not permitted in the zone.
(Ord. 151 § 1(part), 1994)
18.76.033 -Termination—Operation of use.
The following nonconforming uses and structures shall be discontinued and structures removed from
their sites within the time periods specified in this section, commencing with January 27, 1994, except
when extended or revoked as otherwise provided:
A. Where the property is unimproved, one year;
B. Where the property is unimproved except for structures of a type for which the city building code
does not require a building permit, three years;
C. Where the property is unimproved except for structures which contain less than one hundred
square feet of gross floor area, three years;
D. Signs, three years;
E. A nonconforming use conducted in a structure designed to serve a use permitted in the zone,
five years;
F. In other cases twenty years from January 27, 1994, or amendment thereto establishing
nonconforming status, and for such longer time so that the total life of the structure from the
date of construction, basedon the type of construction as defined by the building code, will be
as follows:
1. Type IV and Type V buildings (light incombustible frame and wood frame) used as:
a. One-family dwellings, two-family dwellings, three-family dwellings, apartment houses
and other buildings used for residential occupancy, twenty-five years,
b. Stores and factories, twenty-five years,
c. Any other building not herein enumerated, twenty-five years;
2. Type III buildings (heavy timber construction and ordinary masonry) used as:
a. One-family dwellings, two-family dwellings, three-family dwellings,apartment houses,
offices and hotels, thirty years,
b. Structures with stores below and residences, offices or a hotel above, thirty years,
c. Warehouses, stores and garages, thirty years,
d. Factories and industrial buildings, thirty years;
3. Type I and Type II buildings (fire-resistive) used as:
a. One-family dwellings, two-family dwellings, three-family dwellings, apartment houses,
offices and hotels, thirty years,
b. Theaters, warehouses, stores and garages, thirty years,
Attachment: Planning Commission Memo_Comments to the Commission_Pc meeting 6.18.2020-SW (Nonconforming Uses and Buildings)
Packet Pg. 106
D.1.a
c. Factories and industrial buildings, thirty years.
(Ord. 151 § 1(part), 1994)
18.76.034 - Termination—Abatement as a public nuisance.
Whenever a nonconforming use or structure becomes obsolete, dilapidated, substandard, unsafe, or
exists in a state of general disrepair, the planning commission may hold a public hearing to evaluate and
make declaration of nuisance.
(Ord. 151 § 1(part), 1994)
18.76.040 - Nonconforming buildings.
A. No use permit is required for the following:
1. Ordinary maintenance and repairs may be made to any nonconforming building; provided, that
no structural alterations and/or additions are made; provided further, that such maintenance and
repairs do notexceed twenty-five percent of the assessed value of the building in any one-year
period;
2. Any repairs necessary to bring a nonconforming building into compliance with city codes
regardless of whether such repairs exceed twenty-five percent of the assessed value of the
building in any one-year period; provided, that the total floor area in the building shall not be
increased.
B. A conditional use permit is required for the following:
1. Ordinary maintenance and repairs to any nonconforming building which exceed twenty-five
percent of the assessed value of the building in any one-year period;
2. Any structural alterations and/or additions; provided, that the total floor area of the building shall
not be increased by more than twenty percent or one hundred twenty square feet, whichever is
greater;
3. Exception is in the case of damaged buildings/structures due to fire, earthquake, or natural
disasters, refer to subsection D of this section.
C. As a condition to any conditional use permit granted pursuant to subsection B of this section, the
portions altered or repaired shall be brought into conformity with applicable city codes including the
zoning code.
D. Repair of Damaged or Partially Damaged Structures Due to Fire, Explosion, Earthquake, or Other
Natural Disasters. Any nonconforming structure or conforming structure containing a nonconforming
use which is damaged or destroyed by fire, explosion, act of God, collapse or any other casualty or
calamity may be reconstructed to the condition in which it existed immediately prior to the occurrence
of such damage or destruction; provided, that:
1. The total cost of the reconstruction of the structure shall not exceed seventy-five percent of the
value of the structure prior to the damage or destruction. The value of the structure may be
computed by any of the following methods:
a. The current assessed valuation of the structure as shown on the latest county of San
Bernardino equalized assessment role;
b. An appraisal of the damage or destroyed structure made by a state of California licensed
appraiser to determine predamage or destruction value of the structure;
Attachment: Planning Commission Memo_Comments to the Commission_Pc meeting 6.18.2020-SW (Nonconforming Uses and Buildings)
Packet Pg. 107
D.1.a
c. The value to construct the original structure as shown on the building department's official
records, based upon the current buildingconstruction costs upon which building permit
valuations are computed.
2. In determining the reconstruction cost of any nonconforming structure, there shall not be
included therein the cost of the land or any factors other than those concerning the
nonconforming structure itself.
a. All such construction or repairs shall be started within one year from the date of damage or
destruction and shall be pursued diligently to completion. Otherwise, the right to rebuild
pursuant to this section is terminated,which means within one more year.
b. In the case of the buildings/structures being reconstructed in a different condition than what
originally existed prior to the damages (fire, earthquake or natural disaster), then the
project shall be evaluated in accordance to site and architectural review criteria, Chapter
18.63.
(Ord. 157(part), 1995: Ord. 151 § 1(part), 1994: Ord. 126 § 2, Exh. A(part), 1990)
18.76.050 - Buildings under construction.
Nothing contained in this title shall be deemed to require any change in plans, construction or
designated use of any building for which a building permit has properly been issued, in accordance with
the provisions of ordinances then effective and upon which actual construction has been started prior to
the effective date of the ordinance codified in this title; provided, that in all such cases actual construction
shall be diligentlycarried on until completion of the building.
(Ord. 151 § 1(part), 1994: Ord. 126 § 2, Exh. A(part), 1990)
Attachment: Planning Commission Memo_Comments to the Commission_Pc meeting 6.18.2020-SW (Nonconforming Uses and Buildings)
Packet Pg. 108