Loading...
09-17-2015 CITY OF GRAND TERRACE PLANNING COMMISSION AGENDA Council ChambersRegular Meeting6:30 PM CALL TO ORDER Convene the Meeting of the Planning Commission and Site and Architectural Review Board. Pledge of Allegiance. Roll Call Attendee NamePresentAbsentLateArrived Chairman Tom Comstock¨¨¨ Vice-Chairman Ryan Stephens¨¨¨ Commissioner Jeffrey Allen¨¨¨ Commissioner Tara Ceseña¨¨¨ Commissioner Edward A. Giroux¨¨¨ Community Development Director Sandra Molina¨¨¨ Assistant City Attorney Ivy Tsai¨¨¨ Secretary Jessica Lambarena¨¨¨ APPROVAL OF AGENDA PRESENTATION Presentation to be given by General Manager Don Hough with the Riverside Highland Water Company PUBLIC ADDRESS Public address to the Commission shall be limited to three minutes unless extended by the Chairman. Should you desire to make a longer presentation, please make written request to be agendized to the Director of Community Development Department. This is the opportunity for members of the public to comment on any items not appearing on the regular agenda. Because of restrictions contained in California Law, the Planning Commission may not discuss or act on any item not on the agenda, but may briefly respond to statements made or ask a question for clarification. The Chairman may also request a brief response from staff to questions raised during public comment or may request a matter be agendized for a future meeting. City of Grand TerracePage 1 AgendaGrand Terrace Planning CommissionSeptember 17, 2015 A.PUBLIC HEARINGS 1. Site and Architectural Review 05-19-A1 and Environmental 15-06 Located at 11830 Mount Vernon Avenue RECOMMENDATION: 1) Conduct a public hearing, and 2) Adopt RESOLUTION NO. 2015-__, A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF GRAND TERRACE ADOPTING AN ENVIRONMENTAL EXEMPTION AND APPROVING SITE AND ARCHITECTURAL REVIEW 05-19-A1 TO CONSTRUCT 35 DETACHED CONDOMINIUM UNITS LOCATED AT 11830 MOUNT VERNON AVENUE DEPARTMENT: COMMUNITY DEVELOPMENT B.INFORMATION TO COMMISSIONERS C.INFORMATION FROM COMMISSIONERS ADJOURN Adjourn to the next scheduled meeting of the Site and Architectural Review Board/Planning Commission to be held on October 1, 2015 at 6:30 p.m. than 14 calendar days preceding the meeting. City of Grand Terrace Page 2 A.1 AGENDA REPORT MEETING DATE:September 17, 2015 TITLE:Site and Architectural Review 05-19-A1 and Environmental 15-06 Located at 11830 Mount Vernon Avenue PRESENTED BY:Sandra Molina, Community Development Director RECOMMENDATION:1) Conduct a publichearing, and 2) Adopt RESOLUTION NO. 2015-__, A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF GRAND TERRACE ADOPTING AN ENVIRONMENTAL EXEMPTION AND APPROVING SITE AND ARCHITECTURAL REVIEW 05-19-A1 TO CONSTRUCT 35 DETACHED CONDOMINIUM UNITS LOCATEDAT 11830 MOUNT VERNON AVENUE BACKGROUND/PROPOSAL: In 2005, the Greystone Group submitted an application for Site and Architectural Review 05-19, Tentative Tract Map 05-03 and Specific Plan 05-02, for development of a 35-unit detached condominium project on a 3.7-acre parcel located at 11830 Mount Vernon Avenue. On December 15, 2005, the Planning Commission approved SA 05- 19, and recommended City Council approval of the Tentative Tract Map and Specific Plan. On April 27, 2006, the City Council adopted Resolution No. 06-02 approving Tentative Tract Map 05-03, and introduced Ordinance No. 223 for purposes of adopting the Specific Plan. The Specific Plan was adopted on May 11, 2006. In 2009, Tract Map No. 17766 establishing the condominium map was recorded. The adopted Specific Plan is attached to this report. It contains conceptual plans for development of the 35 detached units, including the site, grading, architectural and landscape plans. Capital Pacific Real Estate, Inc., represented by Mark Mullin, purchased the site earlier this year and intends to develop the site consistent with the original approval, with slight modifications. However, expiration of the original Site and Architectural Review necessitates Planning Commission review for new approval. Therefore, the Applicant has submitted Site and Architectural Review 05-19-A1 and Environmental 15-06 for the approval of the site and architectural concepts for 35 detached condominium units and on-site. Each residence will be plotted on lots averaging2,940 square feet. The housing product will consist of two-story homes and house sizes varying between 1,873 and 1,898 square feet. The site will also include on- site landscaping, including an enhanced landscape entry statement, as well as an active openspace in the center of the development. Packet Pg. 3 A.1 SITE AND SURROUNDING AREA: The subject site is located on the west side of Mount Vernon Avenue, nestled between The Highlands apartments complex. The site is presently vacant of structures and contains trees and shrubs. The topography of the site slopes from east to west. The existing site slopes about 4.5% in a westerly direction with Mount Vernon Avenue as the high point. The site falls nearly 25 feet from east to west, with the steepest area along the southerly edge. To the north, south and west of the site is the Highlands Apartment complex zoned R3 Medium Density Residential and to the east are single family residential homes designated R1-7.2 Single Family Residential. ANALYSIS: General Plan/Zoning Consistency The Project site is designated Medium Density Residential (MDR) on the General Plan Land Use Map. The MDR designation includes both single family detached and multiple family attached developments. Permitted uses within these areas may include small lot single family developments or attached multi-family developments including townhomes, condominiums, and apartments. Permissible density is between 6-12 dwelling units per acre. Project density is approximately 9.5 dwelling units per acre. The site is zoned R-3 Medium Density Residential which allows multiple family recorded lot lines, as it is a condominium. However, the developer has incorporated fencing to create the sense of a lot for each condominium unit. The Greenbriar Specific Plan identified minimum setbacks at 10 feet at the front, 5 feet at the rear and 8 feet at the sides. The 8 foot setback created a zero lot line situation. The applicant is proposing to slightly modify that concept by shifting the residence so that it is centered, providing a conventional center plotting; thereby, eliminating the zero setback which becomes problematic over time. Between each residence will be a minimum of 8 feet. As the lot lines are arbitrary, this minor change is consistent with the specific plan. The residences meet the parking, building height and lot coverage requirements contained in the specific plan. Site Plan: The submitted site plan is a very simple plotting of the recorded Tract Map. It shows the centering of the residential homes and the 8 foot separation between each unit. Other minor revisions from the original app Lots 24-26 and 33. For reference purposes, the Specific Plan is attached which has the original site plan. The new plotting is consistent with the adopted Specific Plan. Interior access will be provide Packet Pg. 4 A.1 configuration and with the main entrance and exit via Mount Vernon Avenue located in Vernon Avenue will be provided in the northeast corner to satisfy the Fire Department. The proposed parking includes two spaces in each garage for a total of 70 covered spaces. Also, there are 18 open spaces for guest or visitor parking. This open guest parking is located in two areas; one near the open space area in the center of the development and the other near the southeast main entrance. Two common open space areas are proposed. The larger of the two is located in the center of the development, towards its westerly side. This open space will be 5,268 square feet in size. The other open space area measures some 1,892 square feet in size and lies just south and next to the southeast main entrance. No improvements are shown for this latter open space area. Additional outside recreational amenities will be provided in the form an exterior patio area for each residential unit. A five to six foot block wall presently is constructed along the northerly, westerly and southerly boundaries of the subject site. This development proposes to replace this fencing with a retaining wall of varying heights, with an 8-foot high wall on top of that in accordance with the approved grading plan. The retaining and perimeter walls were extensively discussed by the Planning Commission and City Council, and ultimately due to existing grade considerations, the walls were approved. Along the Mount Vernon Preliminary Landscaping: The preliminary landscape plan shows a generalized plant palette including trees, shrubs, vines and groundcovers and generalized location of various plantings. As shown on the preliminary landscaping plan, the applicant will include in the landscaping the adjacent parkways along Mount Vernon Avenue. The Municipal Code requires the planting of street trees every 40 feet along both the street frontage, if necessary as there are already street trees along this section of Mt. Vernon. The applicant will be required to plant and maintain the adjacent parkway. A detailed landscaping and irrigation plan will be required to be submitted and to be approved prior to the issuance of building permits. These plans will be required to conform to the Water Efficient Landscape Ordinance, as it may be modified by state regulations, and therefore, the landscaping will be water efficient. Additionally, the amount of turf area will be required to be reduced in keeping with water efficiency requirements. Floor and Architectural Plans: There are two housing plans. Plan 1 measures 1,873 square feet and Plan 2 measures Packet Pg. 5 A.1 1,898 square feet. The square footages include 72 and 68 square feet added to each floor plan from the original approval. This small addition conforms to the approved specific plan and meets setback requirements. Plan 1 is proposed on 15 lots, while Plan 2 is proposed on 20 lots. The architectural style is consistent with the Specific Plan which is described as th elements from early 20 Century California Spanish bungalows. Low pitched roofs and barrel shaped roof tile accent the character of the architecture. The residences will have stucco walls, exposed rafters, incorporate stone works, and include decorative shutters and wrought iron accents. There are 12 color schemes proposed for the Project and these are attached to the report, as well as a preliminary plan showing which color scheme is proposed on each lot. The proposed colors and styles are complementary to the surround area. Grading and Utilities The original approval included the conceptual grading plan for the project (attached). The specific plan also includes the approved conceptual grading plan. The applicant will grade the project in conformance with the conceptual plans, which is verified through the technical plan check review. The site will be graded to drain from east to west at an average grade of 5.0%. Retaining walls will be used on nearly all of the south, west and northern boundaries of the site. No retaining walls will be needed along the Mount Vernon frontage. The maximum retaining wall height will be 10.5 feet along the southeasterly side of the project. Most of the retaining wall heights, however, will range from 3 feet to 6.5 feet. The grading of the site will generate approximately 25,000 cubic yards of export. To mitigate the export operation, a condition has been added to limit the hours of grading of the site and that the proposed haul route for the exporting trucks be approved by the Community Development Director prior to the issuance of any grading permits. Storm water will be collected via an underground storm drain system and outlet through the retaining wall near the southwest corner of the site. This storm drain system will also accept off-site water currently being accepted onto the subject property from Mount Vernon Avenue. The storm water will exit the site via an outlet through the retaining wall onto the neighboring apartment site to the west. Additional flow due to the addition of non-pervious materials will be detained on site in an underground detention system. ENVIRONMENTAL REVIEW: The Project to construct 35 detached residential homes on the recorded Tract Map is categorically exempt per the California Environmental Quality Act, Code of Regulations, Title 14, Section 15332, which exempts infill development when the project is compatible with the General Plan and Zoning Code, is on less than five acres substantially surrounded by urban uses, is devoid of habitat for biological resources, is served by public utilities and services, and there are no impacts to traffic noise, air quality or water quality. A Notice of Exemption has been included for adoption. PUBLIC NOTICE: Packet Pg. 6 A.1 Public notice of the Project was provided, including publishing in the Grand Terrace City News and mailing notices to property owners within 300 feet of the Project site, 10 days prior to the meeting date. In addition, a copy of the notice was posted in three public places. To date, City staff has not received any comments regarding the proposed Project. CONCLUSION: The proposed Project is consistent with the Zoning Code, Specific Plan and General Plan, and conforms to the plotting of the Specific Plan. The construction of the residences and landscaping with water efficient plant material will complement and enhance the surrounding area, and staff recommends adoption of the attached resolution approving the Project. ATTACHMENTS: Planning Commission Resolution_SA 05-19-A1 (DOC) Exhibit1 & 2 Conditions (PDF) Greenbriar Specific Plan (PDF) Preliminary color scheme_elevation mix 9-3-15 (PDF) Preliminary color scheme_elevation mix 9-3-15 (PDF) Color Schemes (PDF) APPROVALS: Sandra Molina Completed 09/10/2015 4:57 PM City Attorney Completed 09/10/2015 6:43 PM Community Development Completed 09/10/2015 7:02 PM Planning Commission Pending 09/17/2015 6:30 PM Packet Pg. 7 A.1.a RESOLUTION NO. 2015- A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF GRAND TERRACE ADOPTING A NOTICE OF EXEMPTION AND APPROVING SITE AND ARCHITECTURAL REVIEW 05-19-A1 ESTABLISHING THE SITE AND ARCHITECTURAL CONCEPTS FOR A 35-UNIT DETACHED CONDOMINIUM PROJECT AT 11830 MOUNT VERNON AVENUE (APN 1167-292-01) WHEREAS, in 2005, the Greystone Group submitted Site and Architectural Review 05-19, Tentative Tract Map 05-03 (Map No. 17766) and Specific Plan 05-02 for development of a 35-unit detached condominium project; and WHEREAS, on December 15, 2005, the Planning Commission approved SA 05- 19, and recommended City Council approval of Tentative Tract Map 05-03 (Map No. 17766) and Specific Plan 05-02; and WHEREAS, on April 27, 2006, the City Council adopted Resolution No. 06-02 approving Tentative Tract Map 05-03, and on May 11, 2006 adopted Ordinance No. 223 adopting the Specific Plan; and WHEREAS, in 2009, Tract Map No. 17766 establishing the condominium map was recorded; and WHEREAS, Capital Pacific Real Estate, Inc., represented by Mark Mullin, purchased the site earlier this year and intends to develop the site consistent with the original approval, with slight modifications. However, expiration of the original Site and Architectural Review necessitated Planning Commission review to re-establish approval; and WHEREAS, the Project site is zoned R3-High Density Residential and designated Medium Density Residential on the General Plan Land Use Map, located at 11830 Mount Vernon Avenue, identified 1167-292-01; and WHEREAS, the Project qualifies for an environmental exemption pursuant to Section 15332 of the California Environmental Quality Act (CEQA) Guidelines, which exempts infill projects when the project is compatible with the General Plan and Zoning Code, is on less than five acres substantially surrounded by urban uses, it is devoid of Attachment: Planning Commission Resolution_SA 05-19-A1 (1767 : Site and Architectural Review 05-19-A1) habitat for biological resources, the site is served by public utilities and services, and there are no impacts to traffic noise, air quality or water quality; and WHEREAS, on September 17, 2015, the Planning Commission conducted a duly Page 1 of 8 Packet Pg. 8 A.1.a noticed public hearing on the Project at the Council Chambers located at 22795 Barton Road, Grand Terrace, California and concluded the hearing on said date; and WHEREAS, all legal prerequisites to the adoption of this Resolution have occurred. NOW THEREFORE, BE IT RESOLVED by the Planning Commission of the City of Grand Terrace: 1. The Planning Commission hereby finds that the Project is categorically exempt from the provisions of the California Environmental Quality Act (CEQA) pursuant to Section 15332. The Notice of Exemption prepared in connection with the Project has been reviewed and considered and reflects the independent judgment of the Planning Commission, and is hereby adopted. 2. The Planning Commission finds as follows with respect to Architectural and Site Review 15-03: a. The Project is consistent with the intent of the Grand Terrace Municipal Code and the General Plan. The proposed Project to construct 35 detached condominium units is consistent with the Grand Terrace Municipal Code and the General Plan in that it meets the standards of the R3 zoning and tMedium Density Residential category, and is consistent with the adopted Specific Plan. b. The location and configuration of all structures associated with this Project are visually harmonious with this site and surrounding sites and structures, they do not interfere with the neighbors' privacy, they do not unnecessarily block scenic views from other structures and/or public areas and are in scale with the townscape and natural landscape of the area. The design and appearance of the 35 unit project will be consistent with the existing residential development in the area and the City. In addition, the site will be appropriately landscaped to blend in with existing development and the setbacks and landscaping of the project will proved a buffer and transition to the single family homes on the east side of Mount Vernon Avenue. c. The architectural design of structures, their materials and colors are visually harmonious with the surrounding development, natural landforms, are functional for the Project and are consistent with the Grand Terrace Municipal Code. The design is both functional for the proposed project and is consistent with the Grand Terrace Municipal Code. Color and materials will match existing materials and colors within the adjacent Attachment: Planning Commission Resolution_SA 05-19-A1 (1767 : Site and Architectural Review 05-19-A1) residential areas. d. The plan for landscaping and open spaces provide a functional and visually pleasing setting for the structures on this site and is harmonious Page 2 of 8 Packet Pg. 9 A.1.a with the natural landscape of the area and nearby developments. The proposed landscaping of the site will minimize any visual impacts to the surrounding area. e. There is no indiscriminate clearing of property, destruction of trees or natural vegetation or the excessive and unsightly grading of hillsides, thus the natural beauty of the City, its setting, and natural landforms are preserved. The site is vacant containing sparse vegetation. It will not result in indiscriminate clearing or destruction of vegetation. Rather it will improve the aesthetics of the existing corridor. f. Conditions of approval for this Project necessary to secure the purposes of the Grand Terrace Municipal Code and General Plan are made a part of this approval as set forth in the accompanying Resolution of Approval. BE IT FURTHER RESOLVED that Site and Architectural Review 05-19-A1 is hereby approved subject to the following conditions: 1. Site and Architectural Review 05-19-A1 is approved to construct 35 detached condominium units in accordance with the original approval of Site and Architectural Review 05-19 and Specific Plan 05-02. This approval is based on the application and materials submitted on July 13, 2105, including the conceptual site plan, landscaping plan and color schemes dated August 27, 2015. These plans are approved as submitted and conditioned herein, and shall not be further altered except as modified by these conditions of approval, and unless reviewed and approved by the affected city departments 2. This approval shall expire twelve (12) months from the date of adoption of this resolution unless the use has been inaugurated or a time extension has been granted by the City, in accordance with Chapter 18.63 of the Zoning Code. Time extensions shall be filed at least sixty (60) days prior to the expiration date. 3. The applicant shall defend, indemnify, and hold harmless the City of Grand Terrace and its officers, employees, and agents from and against any claim, action, or proceeding against the City of Grand Terrace, its officers, employees, or agents to attack, set aside, void, or annul any approval or condition of approval of the City of Grand Terrace concerning this project, including but not limited to any approval or condition of approval of the Planning Commission, or Community Development Director. The City shall promptly notify the applicant of any claim, action, or proceeding concerning the project and the City shall cooperate fully in the defense of the matter. The City reserves the right, at its own option, to choose its own attorney to represent the City, its officers, Attachment: Planning Commission Resolution_SA 05-19-A1 (1767 : Site and Architectural Review 05-19-A1) employees, and agents in the defense of the matter. 4. The project shall be constructed in accordance with all the approved plans and conditions of approval, including but not limited to site plans, floor plans, wall Page 3 of 8 Packet Pg. 10 A.1.a plans, building elevations, and landscape plans except as modified by these conditions of approval. 5. In the event that exhibits and written conditions are inconsistent, the written conditions shall prevail. 6. The applicant shall pay all applicable development impact fees, and demonstrate the payment of school impact fees to the Building and Safety Department. 7. Construction and operational activities associated with the project shall comply Terrace Municipal Code. 8. The applicant shall comply with the conditions of approval listed in the memorandum from the Director of Building and Safety/Public Works dated October 10, 2005, attached as Exhibit 1. 9. The applicant shall comply with the requirements in the letter from the County Fire Department, Community Safety Division, dated November 1, 2005, attached as Exhibit 2. In addition, the applicant shall obtain and comply with updated conditions prior to the approval of the grading plan. 10. The applicant shall obtain all requisite permits and clearances from Riverside Highland Water Company (RHWCO), prior to the issuance of a grading permit and/or building permit, as applicable. 11. The applicant shall submit sewer improvement plans to the City of Colton Wastewater Department for review and approval. 12. The applicant shall incorporate into the project design all existing easements within the project boundaries, or obtain abandonment of said easements from the affected easement holder(s). If this requirement cannot be accomplished, the project shall be redesigned. 13. Air conditioning, heating and cooling units shall be ground mounted. 14. Prior to the issuance of building permits, the applicant shall submit four sets of building elevations demonstrating conformance with the approved architectural plans, and with the adopted Specific Plan. 15. The applicant shall submit a utility plan with the final construction plans that depict the locations of utilities necessary to serve the residences. Attachment: Planning Commission Resolution_SA 05-19-A1 (1767 : Site and Architectural Review 05-19-A1) 16. All exposed retaining walls and perimeter walls shall be decorative. Page 4 of 8 Packet Pg. 11 A.1.a 17. Prior to issuance of a building permit for any perimeter walls on shared property lines, the applicant shall submit an Encroachment Agreement signed by adjacent property owners authorizing construction of block walls on the shared property line. 18. The applicant shall be responsible for regular and ongoing upkeep and maintenance of the property, including weeds and debris, and all on-site and parkway landscaping shall be maintained by the applicant in good condition at all times. 19. All on-site utilities shall be placed underground, as determined by the Public Works Director. All frontage utilities shall be placed underground, as feasible, in coordination with the utility companies. 20. All construction debris shall be collected and placed in appropriate containers on a daily basis, and the construction site shall be maintained in a neat and orderly manner. 21. A decorative wall/fence shall be provided along Mount Vernon Avenue. Said wall/fence shall be setback 10 feet from the Mount Vernon right-of-way line excepting where this distance needs to be modified because of line of site issues. A detailed fencing plan showing the design, appearance and location of all fencing shall be submitted to and approved by the Community Development Department prior to the issuance of any building permits. 22. A precise grading plan with soils report shall be submitted to the City for review and approval prior to the issuance of any grading permit for this project. 23. This project shall provide at least two covered parking spaces in a garage and at least one open guest parking space for every four proposed units distributed throughout the development. 24. Three copies of landscaping and irrigation plans shall be submitted to the Community Development Director for review and approval. Said plans shall be prepared by a licensed landscape architect. The plans shall be in substantial conformance with the preliminary landscaping plan, except that it shall conform state model ordinance and the amount of turf shall be reduced. Said plans shall be submitted prior to the issuance of building permits for the new construction. All landscaping and irrigation facilities shall be installed prior to the final occupancy of the any residential building. 25. The proposed landscaping for this development shall include the parkway in front of the site along Mt. Vernon Avenue. The developer or homeowner's association Attachment: Planning Commission Resolution_SA 05-19-A1 (1767 : Site and Architectural Review 05-19-A1) shall be responsible for the maintenance of this parkway landscaping. 26. Prior t Lighting and Landscape Lighting District. The applicant shall submit a deposit to Page 5 of 8 Packet Pg. 12 A.1.a cover direct engineering costs and administrative costs associated with said annexation. 27. The proposed open space lot in the middle of the proposed development shall include active recreational amenities. A detailed plan of this open space area shall be submitted to and be approved by the Community Development Department prior to the issuance of building permits. 28. No building or portion of a building shall be constructed within the 19 foot setback as measured from the Mt. Vernon Avenue right of way excepting for patio covers which shall be constructed of wood. 29. No building or portion of a building or structure shall be constructed closer to the northerly, westerly or southerly property lines of the site shown on the site plan of the original approval. Exceptions may be made for patio covers which shall be constructed of wood and for the adjustment of the location of the buildings to accommodate the minimum 18 foot driveways required by Condition No. 30; however, in no instance shall a structure be closer than 5 feet to any interior property line. 30. The driveways in front of each individual garage shall have a minimum length, as measured from the garage door to backside of the proposed sidewalk or edge of the interior loop drive where there is no Sidewalk, of 18 feet. In addition, all garage doors shall be of the "roll-up" type. 31. Any signs proposed for this project shall be subject to the sign regulations of the R3 Zone and to a separate sign permit application to be reviewed and approved by the Community Development Department. 32. All parking areas shall be surfaced and maintained with asphalt, concrete or other permanent, impervious surfacing material as required by Section 18.60.040 B of the Zoning Code. 33. For any outside lighting proposed, a lighting plan shall be submitted to and approved by the Community Development Department prior to the issuance of building permits. Night lighting for the buildings and parking areas shall be designed to reflect away from nearby residential areas and public roadways. Light standards on the site shall not exceed eighteen feet in height as measured from the finished grade of the parking surface. 34. The developer shall pay the appropriate traffic impact fees as required by City Ordinance No. 190 prior to the issuance of building permits. 35. All contractors working on this project shall acquire a valid City business license. Attachment: Planning Commission Resolution_SA 05-19-A1 (1767 : Site and Architectural Review 05-19-A1) 36. Prior to the issuance of grading permits, the applicant shall comply with the City of Grand Terrace Stormwater System Ordinance, as it may be amended, (Ordinance No. 142, Subsection 1.010, 1993) and the Santa Ana Regional Water Quality Control Board's NPDES Permit for San Bernardino County, as required Page 6 of 8 Packet Pg. 13 A.1.a under the Clean Water Act. 37. A "phasing plan" indicating the proposed phasing and timing of the development shall be submitted to and approved by the Director of Community Development prior to the issuance of building permits. 38. The approval shall not be effective until the developer/owner signs the "Acceptance of Conditions" form that he/she is aware of and accepts all of the conditions of approval as imposed by the Planning Commission at the conclusion of the public hearing. 39. plan" to the Community Development Director for review. Said "export plan" shall indicate the days and hours in which dirt will be exported from the site and shall also indicated the proposed haul route for the trucks exporting dirt from the site. No grading pennit shall be issued until the submitted "export plan" is approved by the Director. 40. For "Unit I" on the southeast comer of the site next to the open space area, the east side of the building facing Mt. Vernon shall be architecturally embellished to the satisfaction of the Community Development Director. Plans showing this architectural embellishment shall be submitted to and approved by the Community Development Director prior to the issuance of any building permits. 41. The applicant shall contact the Planning Division for a final inspection a minimum two weeks prior to the inspection date requested. 42. Upon approval of these conditions and prior to becoming final and binding, the and content shall be prepared by the Community Development Department. Attachment: Planning Commission Resolution_SA 05-19-A1 (1767 : Site and Architectural Review 05-19-A1) Page 7 of 8 Packet Pg. 14 A.1.a PASSED AND ADOPTED by the Planning Commission of the City of Grand Terrace, th California, at a special meeting held on the 17 day of September, 2015. AYES: NOES: ABSENT: ABSTAIN: ATTEST: __________________________ __________________________ Pat Jacquez-Nares Tom Comstock City Clerk Chairman Attachment: Planning Commission Resolution_SA 05-19-A1 (1767 : Site and Architectural Review 05-19-A1) Page 8 of 8 Packet Pg. 15 A.1.b Exhibit 1 Attachment: Exhibit1 & 2 Conditions (1767 : Site and Architectural Review 05-19-A1) Packet Pg. 16 A.1.b Attachment: Exhibit1 & 2 Conditions (1767 : Site and Architectural Review 05-19-A1) Packet Pg. 17 A.1.b Attachment: Exhibit1 & 2 Conditions (1767 : Site and Architectural Review 05-19-A1) Packet Pg. 18 A.1.b Attachment: Exhibit1 & 2 Conditions (1767 : Site and Architectural Review 05-19-A1) Packet Pg. 19 Exhibit 2 A.1.b Attachment: Exhibit1 & 2 Conditions (1767 : Site and Architectural Review 05-19-A1) Packet Pg. 20 A.1.b Attachment: Exhibit1 & 2 Conditions (1767 : Site and Architectural Review 05-19-A1) Packet Pg. 21 A.1.c Attachment 2 Attachment: Greenbriar Specific Plan (1767 : Site and Architectural Review 05-19-A1) Packet Pg. 22 A.1.c Attachment: Greenbriar Specific Plan (1767 : Site and Architectural Review 05-19-A1) Packet Pg. 23 A.1.c Attachment: Greenbriar Specific Plan (1767 : Site and Architectural Review 05-19-A1) Packet Pg. 24 A.1.c Attachment: Greenbriar Specific Plan (1767 : Site and Architectural Review 05-19-A1) Packet Pg. 25 A.1.c Attachment: Greenbriar Specific Plan (1767 : Site and Architectural Review 05-19-A1) Packet Pg. 26 A.1.c Attachment: Greenbriar Specific Plan (1767 : Site and Architectural Review 05-19-A1) Packet Pg. 27 A.1.c Attachment: Greenbriar Specific Plan (1767 : Site and Architectural Review 05-19-A1) Packet Pg. 28 A.1.c Attachment: Greenbriar Specific Plan (1767 : Site and Architectural Review 05-19-A1) Packet Pg. 29 A.1.c Attachment: Greenbriar Specific Plan (1767 : Site and Architectural Review 05-19-A1) Packet Pg. 30 A.1.c Attachment: Greenbriar Specific Plan (1767 : Site and Architectural Review 05-19-A1) Packet Pg. 31 A.1.c Attachment: Greenbriar Specific Plan (1767 : Site and Architectural Review 05-19-A1) Packet Pg. 32 A.1.c Attachment: Greenbriar Specific Plan (1767 : Site and Architectural Review 05-19-A1) Packet Pg. 33 A.1.c Attachment: Greenbriar Specific Plan (1767 : Site and Architectural Review 05-19-A1) Packet Pg. 34 A.1.c Attachment: Greenbriar Specific Plan (1767 : Site and Architectural Review 05-19-A1) Packet Pg. 35 A.1.c Attachment: Greenbriar Specific Plan (1767 : Site and Architectural Review 05-19-A1) Packet Pg. 37 A.1.c Attachment: Greenbriar Specific Plan (1767 : Site and Architectural Review 05-19-A1) Packet Pg. 50 A.1.c Attachment: Greenbriar Specific Plan (1767 : Site and Architectural Review 05-19-A1) Packet Pg. 52 A.1.c Attachment: Greenbriar Specific Plan (1767 : Site and Architectural Review 05-19-A1) Packet Pg. 54 A.1.c Attachment: Greenbriar Specific Plan (1767 : Site and Architectural Review 05-19-A1) Packet Pg. 55 A.1.c Attachment: Greenbriar Specific Plan (1767 : Site and Architectural Review 05-19-A1) Packet Pg. 57 A.1.c Attachment: Greenbriar Specific Plan (1767 : Site and Architectural Review 05-19-A1) Packet Pg. 58 A.1.c Attachment: Greenbriar Specific Plan (1767 : Site and Architectural Review 05-19-A1) Packet Pg. 59 Attachment 3 A.1.d Hsffocsjfs DPOTUSVDUJPO!TFRVFODF!TIFFU SFMFBTF!.!QIBTF!Bmm-!!USBDU;!28877 DJUZ;!HSBOE!UFSSBDF!!\[JQ;! Attachment: Preliminary color scheme_elevation mix 9-3-15 (1767 : Site and Architectural Review 05-19-A1) Packet Pg. 60 A.1.d Attachment: Preliminary color scheme_elevation mix 9-3-15 (1767 : Site and Architectural Review 05-19-A1) Packet Pg. 61 A.1.d Attachment: Preliminary color scheme_elevation mix 9-3-15 (1767 : Site and Architectural Review 05-19-A1) Packet Pg. 62 A.1.d Attachment: Preliminary color scheme_elevation mix 9-3-15 (1767 : Site and Architectural Review 05-19-A1) Packet Pg. 63 A.1.d Attachment: Preliminary color scheme_elevation mix 9-3-15 (1767 : Site and Architectural Review 05-19-A1) Packet Pg. 64 A.1.d Attachment: Preliminary color scheme_elevation mix 9-3-15 (1767 : Site and Architectural Review 05-19-A1) Packet Pg. 65 A.1.d Attachment: Preliminary color scheme_elevation mix 9-3-15 (1767 : Site and Architectural Review 05-19-A1) Packet Pg. 66 A.1.d Attachment: Preliminary color scheme_elevation mix 9-3-15 (1767 : Site and Architectural Review 05-19-A1) Packet Pg. 67 A.1.d Attachment: Preliminary color scheme_elevation mix 9-3-15 (1767 : Site and Architectural Review 05-19-A1) Packet Pg. 68 A.1.d Attachment: Preliminary color scheme_elevation mix 9-3-15 (1767 : Site and Architectural Review 05-19-A1) Packet Pg. 69 A.1.d Attachment: Preliminary color scheme_elevation mix 9-3-15 (1767 : Site and Architectural Review 05-19-A1) Packet Pg. 70 A.1.d Attachment: Preliminary color scheme_elevation mix 9-3-15 (1767 : Site and Architectural Review 05-19-A1) Packet Pg. 71 A.1.d Attachment: Preliminary color scheme_elevation mix 9-3-15 (1767 : Site and Architectural Review 05-19-A1) Packet Pg. 72