Loading...
05-02-2024 CITY OF GRAND TERRACE PLANNING COMMISSION/SITE AND ARCHITECTURAL REVIEW BOARD AGENDA Council ChambersRegular Meeting6:30 PM COMMENTS FROM THE PUBLIC The public is encouraged to address the Planning Commission/Site & Architectural Review Board on any matter posted on the agenda or on any other matter within its jurisdiction. If you wish to address the Planning Commission/Site & Architectural Review Board, please complete a Request to Speak Card and hand it to the Planning Secretary. Speakers will be called upon by the Chair at the appropriate time and each person is allowed three (3) minutes speaking time. If you would like to participate telephonically and speak on an agenda item, you can access the meeting by dialing the following telephone number and you will be placed in the waiting room, muted until it is your turn to speak: 1-669-900-9128 Enter Meeting ID: 891 9820 8447 Password: 320510 The City wants you to know that you can also submit your comments by email to ccpubliccomment@grandterrace-ca.gov. To give the Planning Secretary adequate time to print out your comments for consideration at the meeting, please submit your written comments prior to 5:00 p.m.; or if -5206 by 5:00 p.m. If you wish to have your comments read to the Planning Commission/Site & Architectural Review Board Planning Commission/Site & Architectural Review Board will be subject to the three (3) minute time limitation (approximately 350 words). Pursuant to the provisions of the Brown Act, no action may be taken on a matter unless it is listed on the agenda, or unless certain emergency or special circumstances exist. The Planning Commission/Site & Architectural Review Board may direct staff to investigate and/or schedule certain matters for consideration at a future Planning Commission/Site & Architectural Review Board meeting. PLEASE NOTE: Copies of staff reports and supporting documentation pertaining to each item on this agenda are available for public viewing and inspection at City Hall, 1 st Floor Lobby Area and 2 nd Floor www.grandterrace-ca.gov. For further information regarding agenda items, please contact the office of the Planning Secretary at (909) 954-5206, or via e-mail at lperez@grandterrace-ca.gov. Any documents provided to a majority of the Planning Commission/Site & Architectural Review Board City Hall located at 22795 Barton Road during normal business hours. In addition, such documents will be www.grandterrace-ca.gov. AMERICANS WITH DISABILITIES ACT In compliance with the Americans with Disabilities Act, if you need special assistance to participate in this -5207 at least 48 hours prior to the advertised starting time of the meeting. This will enable the City to make reasonable arrangements to ensure accessibility to this meeting. Later requests will be accommodated to the extent feasible. City of Grand TerracePage 1 Agenda Grand Terrace Planning Commission/Site and Architectural Review Board May 2, 2024 CALL TO ORDER Convene the Meeting of the Planning Commission and Site and Architectural Review Board. Pledge of Allegiance AB 2449 Disclosures Remote participation by a member of the legislative body for just cause or emergency circumstances. Roll Call Attendee Name Present Absent Late Arrived Chair Edward A. Giroux Vice-Chair Tara Cesena Commissioner David Alaniz Commissioner Aron Burian Commissioner Scot Mathis APPROVAL OF AGENDA PRESENTATIONS None. PUBLIC ADDRESS Public address to the Commission shall be limited to three minutes unless extended by the Chairman. Should you desire to make a longer presentation, please make written request to be agendized to the Director of Planning and Development Services. This is the opportunity for members of the public to comment on any items not appearing on the regular agenda. Because of restrictions contained in California Law, the Planning Commission may not discuss or act on any item not on the agenda, but may briefly respond to statements made or ask a question for clarification. The Chairman may also request a brief response from staff to questions raised during public comment or may request a matter be agendized for a future meeting. City of Grand Terrace Page 2 Agenda Grand Terrace Planning Commission/Site and Architectural Review Board May 2, 2024 A.CONSENT CALENDAR 1. Approval of Minutes Regular Meeting 02/15/2024 DEPARTMENT: CITY CLERK B.ACTION ITEMS 1. Review and Consideration of Site and Architectural Review 23-23 and Environmental 23-10, a Development Proposal by the Applicant, Fire Station Properties, LLC, Represented by David Lang, to Construct a New Two Story 12,406 Square Foot Dental Office Building, Landscaping, Trash Enclosure, Parking Lot, Underground Retention System, and a Solar Canopy for Cars on the Vacant 1.67-Acre Property Located at the Corner of Mount Vernon and City Center Court (APNs: 1178-01-109,1178-01-110, and 1178-01-111). the Project is Located Within the Barton Road Specific Plan (BRSP) Village Commercial (VC) Planning Area 2 (P.A.2.). RECOMMENDATION: IT IS RECOMMENDED THAT THE PLANNING COMMISSION/SITE AND ARCHITECTURAL REVIEW BOARD ADOPT A RESOLUTION OF THE PLANNING COMMISSION/SITE AND ARCHITECTURAL REVIEW BOARD FOR THE CITY OF GRAND TERRACE APPROVING SITE AND ARCHITECTURAL REVIEW 23-23, A DEVELOPMENT PROPOSAL BY THE APPLICANT, FIRE STATION PROPERTIES, LLC, REPRESENTED BY DAVID LANG, TO CONSTRUCT A NEW TWO STORY 12,406 SQUARE FOOT DENTAL OFFICE BUILDING, LANDSCAPING, TRASH ENCLOSURE, PARKING LOT, UNDERGROUND RETENTION SYSTEM, AND A SOLAR CANOPY FOR CARS ON THE VACANT 1.67-ACRE PROPERTY LOCATED WITHIN THE BARTON ROAD SPECIFIC PLAN (BRSP) VILLAGE COMMERCIAL (VC) PLANNING AREA 2 (P.A.2.) AT THE CORNER OF MOUNT VERNON AND CITY CENTER COURT (APNS: 1178-01-109,1178-01-110, AND 1178-01-111), AND FINDING THE PROJECT CATEGORICALLY EXEMPT FROM THE PROVISIONS OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) PURSUANT TO SECTION 15332 CLASS 32 (IN-FILL DEVELOPMENT PROJECTS\] DEPARTMENT: PLANNING & DEVELOPMENT SERVICES C.PUBLIC HEARINGS 2. Review and Consideration of Zone Change Amendment (ZCA) 23-01, a Proposal to Amend the Grand Terrace Municipal Code Chapter 18.60 (Off-Street Parking) to Update Parking Requirements. California Environmental Quality Act (CEQA) Exempt Pursuant to Section §15061(B)(3) Common Sense Exemption. City of Grand Terrace Page 3 Agenda Grand Terrace Planning Commission/Site and Architectural Review Board May 2, 2024 RECOMMENDATION: It is recommended that the Planning Commission/Site and Architectural Review Board take the following actions: 1) Open the Public Hearing 2) Receive Staff Report 3) Commission Member Comment and Questions 4) Receive Public Input 5) Close the Public Hearing 6) Adopt a Resolution Of The Planning Commission/Site And Architectural Review Board Of The City Of Grand Terrace Recommending That The City Council Adopt An Amendment To Title 18 (Zoning) Of The Grand Terrace Municipal Code Amending Chapter 18.60 (Off-Street Parking) To Update Parking Requirements (Zone Change Amendment 23-01) And Find An Environmental Exemption Pursuant to Section 15061(b)(3) Of The California Environmental Quality Act (CEQA) Guidelines. CEQA exempt pursuant to Section §15061(b)(3) - Common Sense Exemption. DEPARTMENT: PLANNING & DEVELOPMENT SERVICES D.INFORMATION TO COMMISSIONERS E. INFORMATION FROM COMMISSIONERS ADJOURN Adjourn to the next scheduled meeting of the Site and Architectural Review Board/Planning Commission to be held on May 16, 2024, at 6:30 p.m. City of Grand Terrace Page 4 A.1 CITY OF GRAND TERRACE PLANNING COMMISSION/SITE AND ARCHITECTURAL REVIEW BOARD MINUTES Council ChambersRegular Meeting6:30 PM CALL TO ORDER Chairman Edward Giroux convened the Regular Meeting of the Planning Commission/Site and Architectural Review Board for Thursday, February 15, 2024 at 6:30 p.m. PLEDGE OF ALLEGIANCE The Pledge of Allegiance was led by Vice-ChairTara Ceseña. AB 2449 DISCLOSURES None. Attendee NameTitleStatusArrived Edward A. GirouxChairPresent Tara CeseñaVice-ChairPresent David AlanizCommissionerAbsent Aron BurianCommissionerPresent Scot MathisCommissionerAbsent Jamie TraxlerAssistant City AttorneyPresent Daysi AlcocerPlanning SecretaryPresent APPROVAL OF AGENDA 1.Motion: APPROVAL OF THE FEBRUARY 15, 2024,AGENDA RESULT:ADOPTED \[UNANIMOUS\] MOVER:Aron Burian, Commissioner SECONDER:Tara Ceseña, Vice-Chair AYES:Edward A. Giroux, Tara Ceseña, Aron Burian ABSENT:David Alaniz, Scot Mathis PRESENTATIONS None. City of Grand TerracePage 1 Packet Pg. 5 A.1 Minutes Grand Terrace Planning Commission/Site and Architectural Review Board February 15, 2024 PUBLIC ADDRESS None. A.CONSENT CALENDAR 2. Approval of Minutes Regular Meeting 09/07/2023 RESULT: ACCEPTED \[UNANIMOUS\] MOVER: Tara Ceseña, Vice-Chair SECONDER: Aron Burian, Commissioner AYES: Edward A. Giroux, Tara Ceseña, Aron Burian ABSENT: David Alaniz, Scot Mathis B.ACTION ITEMS None. C.PUBLIC HEARINGS 1. Conditional Use Permit 22-02, Site and Architectural Review 22-08, Lot Merger 22-02, and Environmental 22-06 Proposing an Assembly and Light Manufacturing Building and Use Located at 21801 and 21823 Barton Road. Scott Hutter, Planning & Development Services Director introduced Alicia Gonzalez, Planning Department Manager with Michael Baker International who gave the PowerPoint presentation for this item. Matt Ciccotti, Hines representative discussed the purpose of the proposed project, design, and the benefits it will bring to the City. He also stated that noise along Barton Road should not be a problem as they performed a noise analysis, which is included in the agenda packet. Ruben Choy, Architect clarified for the Planning Commission, why a light color palette was chosen for the design of the project. Minutes Acceptance: Minutes of Feb 15, 2024 6:30 PM (CONSENT CALENDAR) Chair Giroux opened the public hearing at 7:34 p.m. PUBLIC COMMENT Bobbie Forbes expressed her concerns for unauthorized parking around the proposed project. Toni Epps expressed her concern regarding foot traffic around the proposed project. Chair Giroux closed the public hearing at 7:42 p.m. City of Grand Terrace Page 2 Packet Pg. 6 A.1 Minutes Grand Terrace Planning Commission/Site and Architectural Review Board February 15, 2024 Vice-Chair Ceseña requested road improvements such as red curbing to mitigate traffic, as well as changing the hours of operation to 5 a.m. to 11 p.m., be included in the Conditions of Approval. Commissioner Burian would like to have a different color palette for the proposed project. Jamie Traxler, Assistant City Attorney recommended adding/amending the conditions to the resolution for prior approval of changes to the hours of operation, street signage to be decided by the traffic engineer, a temporary improvement such are adding red curbs and that the color palette be explored. Commissioner Burian moved to approve the recommendation with a second by Vice- Chair Ceseña, with the proposed changes to Condition No. 13: Condition of Approval No. 13 be changed to read: changes to these conditions, expansions, land use intensity, or hours of operation, shall be processed in the same manner as the original approval consistent with Municipal Code Chapter 18.83 and Chapter 18.63. Hours of operations shall be changed from 6 a.m. to 11 p.m. to 5 a.m. to 11 p.m. Temporary street improvements such as adding a red curb, and street signage to be determined by the Traffic Engineer Color palette be explored between architect and City Staff ADOPT A RESOLUTION OF THE PLANNING COMMISSION/SITE AND ARCHITECTURAL REVIEW BOARD OF THE CITY OF GRAND TERRACE, CALIFORNIA, ADOPTING A MITIGATED NEGATIVE DECLARATION (ENVIRONMENTAL 22-06) PURSUANT TO THE CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) AND APPROVING CONDITIONAL USE PERMIT 22-02, SITE AND ARCHITECTURAL REVIEW 22-08 TO CONSTRUCT A 170,152 SQUARE-FOOT ASSEMBLY AND MANUFACTURING BUILDING ON APPROXIMATELY 9.2 ACRES, LOCATED AT 21801 AND 21823 BARTON ROAD (APNS: 1167-121-02; 1167-121-03; 1167-121-04; 1167-121-07; 1167-131-011; AND A PORTION OF 1167-121-08) IN THE Minutes Acceptance: Minutes of Feb 15, 2024 6:30 PM (CONSENT CALENDAR) MR-RESTRICTED MANUFACTURING ZONING DISTRICT RESULT: APPROVED \[UNANIMOUS\] MOVER: Aron Burian, Commissioner SECONDER: Tara Ceseña, Vice-Chair AYES: Edward A. Giroux, Tara Ceseña, Aron Burian ABSENT: David Alaniz, Scot Mathis City of Grand Terrace Page 3 Packet Pg. 7 A.1 Minutes Grand Terrace Planning Commission/Site and Architectural Review Board February 15, 2024 D.INFORMATION TO COMMISSIONERS None. E. INFORMATION FROM COMMISSIONERS None. ADJOURN Chair Giroux adjourned the regular meeting of the Planning Commission/Site and Architectural Review Board for Thursday, February 15, 2024. The next scheduled meeting of the Planning Commission/Site and Architectural Review Board is to be held on March 7, 2024, at 6:30 p.m. Minutes Acceptance: Minutes of Feb 15, 2024 6:30 PM (CONSENT CALENDAR) City of Grand Terrace Page 4 Packet Pg. 8 B.1 AGENDA REPORT MEETING DATE:May 2, 2024 TITLE:Review and Consideration of Site and Architectural Review 23-23 and Environmental 23-10, a Development Proposal by the Applicant, Fire Station Properties, LLC, Represented by David Lang, to Construct a New Two Story 12,406 Square Foot Dental Office Building, Landscaping, Trash Enclosure, Parking Lot, Underground Retention System, and a Solar Canopy for Cars on the Vacant 1.67-Acre Property Located at the Corner of Mount Vernon and City Center Court (APNs: 1178-01-109,1178-01-110, and 1178-01-111). the Project is Located Within the Barton Road Specific Plan (BRSP) Village Commercial (VC) Planning Area 2 (P.A.2.). PRESENTED BY:Scott Hutter, Planning & Development Services Director RECOMMENDATION:IT IS RECOMMENDED THAT THE PLANNING COMMISSION/SITE AND ARCHITECTURAL REVIEW BOARD ADOPT A RESOLUTION OF THE PLANNING COMMISSION/SITE AND ARCHITECTURAL REVIEW BOARD FOR THE CITY OF GRAND TERRACE APPROVING SITE AND ARCHITECTURAL REVIEW 23- 23, A DEVELOPMENT PROPOSAL BY THE APPLICANT, FIRE STATION PROPERTIES, LLC, REPRESENTED BY DAVID LANG, TO CONSTRUCT A NEW TWO STORY 12,406 SQUARE FOOT DENTAL OFFICE BUILDING, LANDSCAPING, TRASH ENCLOSURE, PARKING LOT, UNDERGROUND RETENTION SYSTEM, AND A SOLAR CANOPY FOR CARS ON THE VACANT 1.67-ACRE PROPERTY LOCATED WITHIN THE BARTON ROAD SPECIFIC PLAN (BRSP) VILLAGE COMMERCIAL (VC) PLANNING AREA 2 (P.A.2.) AT THE CORNER OF MOUNT VERNON AND CITY CENTER COURT (APNS: 1178-01-109,1178-01-110, AND 1178-01-111), AND FINDING THE PROJECT CATEGORICALLY EXEMPT FROM THE PROVISIONS OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) PURSUANT TO SECTION 15332 CLASS 32 (IN-FILL DEVELOPMENT PROJECTS\] 2030 VISION STATEMENT: This item supports Goal#3 to Promote Economic Development by establishing anew dental office building consistent with the Barton Road Specific Plan, Village Commercial Packet Pg. 9 B.1 (VC), Planning Area 2 (P.A.2.). SUMMARY: The Applicant, Fire Station Properties LLC, represented by David Lang, filed an application for Site and Architectural Review 23-23. The Applicant proposes the development of a 12,406-square foot dental office building on a 1.67-acre site located at the northeast corner of Mount Vernon Avenue and City Center Court (APNs: 1178-01- 109,1178-01-110, and 1178-01-111). Additionally, the Applicant will be processing a Lot Merger Application (LM 24-01) ministerially through City Engineering and Planning to combine all three lots into a single property. Site improvements include, but are not limited to, landscaping, parking lot, parking lot lighting, streetlights, roofed trash enclosure, generator enclosure, solar canopy for cars, bicycle rack, and art area. The Project site is zoned The Barton Road Specific Plan (BRSP) Village Commercial (VC) Planning Area 2 (P.A.2.). The dental office land use is permitted in the Village Commercial (VC) and does not require a Conditional Use Permit. The Applicant has provided an in-depth letter of intent that is provided as Attachment 3 to this agenda staff report. BACKGROUND: Spring Hills Family Dentistry is an existing Grand Terrace business that has been operating for many years from the dental office building at 22737 Barton Road, Grand Terrace, CA. The new two-story 12,406 square foot dental office building will be twice the size of the current office and is only a quarter mile distance from the current Spring Hills Family Dentistry at 22737 Barton Road. The Project site is located at the northeast corner of Mount Vernon Avenue and City Center Court. The site is adjacent to an existing two-story office building to the north, fire station to the east and public rights-of- ways to the west (Mount Vernon Avenue) and south (City Center Court). The project site is approximately 1.67 acres and is composed of three separate parcels. All three are done ministerially. The site is relatively flat with no cultural, historical, or scenic aspects. imagery shows that at one time residential dwellings on the Project site that fronted Mount Vernon Avenue that were removed when City Center Court and the fire station were constructed on or about 1983. The Project site includes an easement for drainage that runs along the northern property line. The City Engineer and Planning Staff worked closely with the Applicant to adjust the site plan so that no structures are within said easement. The only use of the site in recent years has been the sand mound supplied by the City for sand bagging in times of inclement weather. The sandbag supply will be repositioned to the City Hall parking lot going forward. ANALYSIS: Packet Pg. 10 B.1 The objective of the Barton Road Specific Plan (BRSP) is to assure the systematic implementation of the General Plan within the Barton Road Specific Plan (BRSP) using a comprehensive plan of land use, development regulations, design guidelines, development incentives and other related action aimed at implementing the goals and objectives set forth in the Barton Road Specific Plan (BRSP). The Barton Road Specific Plan (BRSP) is the regulatory plan that serves as zoning law for all properties located within the boundaries of the Barton Road Specific Plan (BRSP). All discretionary development, such as the Spring Hills Family Dentistry office building, must be consistent with the Specific Plan. The first preliminary review for compliance of any went to a DAB meeting in April of 2023. The purpose of the DAB meeting is for all key City Departments and utility agencies to coordinate at the early stages of design with the Applicant and to provide feedback. The Applicant took the feedback from the DAB and incorporated it into their design that was submitted in October of 2023. After a round of review for completeness the project was determined to be sufficient to notice for Public Hearing before the Planning Commission. The sections below include an analysis of key aspects of the proposed development. Site Plan: Access to the site will be solely from two driveways along City Center Court. The existing two driveway aprons located along Mount Vernon Avenue that are Site was designed with interior drive aisles that loop the sites that are compatible with two-way traffic and allow for large vehicles such as trash truck to service the site. The placement of the dental office building is towards the western half of the property so that its tower element engages the Mount Vernon Avenue and City Center Court Street frontages. The Barton Road Specific Plan (BRSP) stipulates that no front, site, or rear setback is required in Planning Area 2 -Village Commercial. The Applicant has designed from the adjacent two- EXHIBIT A Attachment 1 include an enlarged scaled site plan for a clear presentation of the proposed site. Water Quality: The Applicant has addressed the stormwater runoff from the site via a Preliminary Water Quality Management Plan (PWQMP) that is provided as Attachment 4 to this agenda staff report. As designed, stormwater will be collected via a system of drains and landscape swales into an Aqua-Swirl concentrator unit before flowing into the Storm tank underground detention system. A Final WQMP is conditioned to be reviewed and approved through the Public Works Department. Parking and Circulation: The Municipal Code parking requirement for medical, dental, Packet Pg. 11 B.1 and veterinary offices/clinics is one parking space for every 200 square feet of gross floor area. Therefore, 12,406 square feet divided by 200 square feet would result in a parking requirement of 62 spaces. The Applicant has designed the site plan with eighty (80) parking spaces. In addition to the 80 spaces there are two spaces dedicated for deliveries to the dental office. By design, the project has a surplus of parking of 18 parking spaces beyond the code minimum. Building Elevations: The Project complies with the maximum building height of 35 feet which is the height to the top of the flat roofed tower element. The tower element itself is covered in a stone veneer with large window arrays on the south and west elevations. Surrounding the windows arrays on the tower is a smooth plaster finish which outlines the windows and at the top of the windows is the sign band area for future placement of business identification signage with benefit of planning and building permits. The top of the tower element is timed by a metal fascia and a metal awning accents the entrance along the south elevation of the building tower. The main building itself is 28 feet in height to the top of the roof ridge which is roofed with concrete roof tiles. The roof eaves are trimmed like the tower element with a metal fascia. Running along the base of the building is a stone veneer trim of the same material that encapsulates the tower element. The main walls of the building are covered in a smooth plaster finish. There is equipment well on the roof of the building that is recessed for all the roof mounted mechanical equipment so that none of it will be visible from the ground below. The Applicant designed the dental office building to be well articulated, with a stepping back deck facing City Center Court, the tower element at the corner, and windows have pop-out trim surrounding EXHIBIT A Attachment 1 include fully scaled and detailed elevations and full color elevation rendering for a clear presentation of the new building. Landscaping: Water efficiency is the core driver behind the design and plant selection for the landscape plan. Low and moderate water use plantings (drip line) coupled with trees (bubblers) make of the entirety of the plan. A full color detail of all the proposed ground cover, shrubs and trees are included in the plans EXHIBIT Ato Attachment 1 for reference. The landscaping is enhanced with density of plantings throughout the site with a focus on the perimeter planters, most specifically along the public rights-of-way at Mount Vernon Avenue and City Center Court. Additionally, plantings were maximized within the parking lot landscape islands. With the efforts of the Applicant to provide more than the required code minimum parking, areas that would have been additional landscape became parking spaces. Because of this the site falls a few percentage points shy of achieving the goal of 25% landscape coverage per the Barton Road Specific Plan (BRSP). To that end the Barton Road Specific Plan (BRSP) gives the Grand Terrace Planning Commission the regulations of developments within Specific Plan the based upon the merits of a Packet Pg. 12 B.1 1) A reduction in required parking spaces not to exceed 20% of the required standard. 2) Increased building height. 3) Oher development standards as approved by the Planning Commission (e.g., landscape coverage percentage%). The Applicant has requested an incentive bonus for relaxed landscape coverage percentage not to exceed 20% of the required standard of 25% landscape coverage for landscaping. The relaxation is necessary to provide parking space above and beyond the Municipal Code minimum requirement. The Applicant has indicated that they currently have 40 spaces at the Barton Road office and given this location is twice the size it would stand to reason to double the parking. Doubling the parking space count would be a measure taken to ensure that no patrons or staff overflow onto adjacent public rights-of- the landscape coverage is consistent with the Barton Road Specific Plan (BRSP) as the Project is doing lot consolidation of 3 into 1 and in doing so would result in a reduction in access points in contrast to if each lot was developed individually, and the landscaping on the project includes a semi-public pedestrian open space towards the Mount Vernon Avenue frontage with a public art piece. Staff supports this request as the increased parking above code minimum will prevent any future parking issues and the landscape plan was designed with all necessary trees and shrubs meeting the Barton Road Specific Plan bonus incentive of 20 percent landscaping coverage on site if granted. Signage: The Applicant has drawn their designs for the Projects proposed building and monument signage which has been provided as Attachment 2 to this agenda staff report. It was preliminarily reviewed by City Staff to ensure it is following signage standards in the Municipal Code and the Barton Road Specific Plan (BRSP). The tower element has sign bands that face west and south where the wall signage can be placed on the building. The site will also feature a monument sign at the southwest corner of the property for visibility along both Mount Vernon Avenue and City Center Court. The Project was conditioned to require that prior to installation of any signs, the Applicant shall submit an application with fee payment, and receive approval, for a sign permit from the Planning Division (pursuant to Chapter 18.80 of the Grand Terrace Municipal Code) and a building permit for construction of the signs from the Building Division. Lighting: The Applicant evaluated their Project site for lighting and based upon photometric analysis sited numerous light standards throughout the parling lot and landscaping areas. This will ensure that the site is safe in dark hours and that the lighting does not bleed onto adjacent sites at high levels. The City Engineer has required that the Applicant include in their project two new streetlights. One will be located on Mount Vernon Avenue, and one will be located on City Center Court. The EXHIBIT AAttachment 1 shows the placement of all onsite lighting in the parking lot area and the two streetlights in the public rights-of-way. Public Art: The Applicant has been provided the art requirements for the City and is Packet Pg. 13 B.1 aware of the necessity for art with their Project. The Applicant has included on the site plan an art area and asked that the final art piece approval be deferred to a future Planning Commission Meeting. The Applicant is required to provide to the Planning Commission for review and art piece that addresses the following: 1) The conceptual compatibility of the design with the immediate environment of the site; and, 2) Appropriateness of the design to the function of the site; and, 3) Compatibility of the design and location within a unified design character or historical character of the site; and, 4) Creation of an internal sense of order and a desirable environment for the general community by the design and location of the work of Art; and, 5) Preservation and integration of natural feature with the project; and, 6) Consideration given to the structural and surface integrity, permanence, and protection against theft, vandalism, weathering, excessive maintenance, and repair cost; and, 7) Representation of a broad variety of tastes within the community and the provision of a balanced inventory of Art in Public Places to ensure a variety of style, design and media throughout the community that will be representative of the eclectic tastes of the community; and, 8) Works of Arts or Art places should be appropriate in scale, form, and content for the immediate, general, social, and physical environments with which they relate. The cost of art for the Project shall be equal to at least 1% of the estimated total building valuation. If the cost of the proposed art is less than 1% of the estimated total building valuation then the Applicant will have to also pay into the Public Art Fund an amount equal to the difference between the Art in Public Places Program allocation and the value, including costs of acquisition and installation, of the work of art placed. EXHIBIT B Attachment 1 requires that the Applicant shall comply with the requirements of Grand Terrace Municipal Code Chapter 18.81 - Art in Public Places and submit a complete Art in Public Places Program proposal to the City. The Art in Public Places proposal for the Project will be brought before the City Planning Commission for consideration and approval prior to issuance of building permits for the dental office building. After Planning Commission Approval, the Art in Public Places art piece must be completed, installed, and inspected prior to issuance of the final Certificate of Occupancy of the building. Barton Road Specific Plan Consistency: The Project is consistent with the Land Use/Economic, Environmental, and Infrastructure Goals found within the Barton Road Specific Plan (BRSP) and the associated objectives and policies for each goal. Packet Pg. 14 B.1 General Plan Consistency: The Project is consistent with the following goals and policies of the General Plan: GOAL 2.1; GOAL 2.3; POLICY 2.3.2; POLICY 2.5.3. Fire Comments: The San Bernadino County Fire Department requested that their standard conditions be included with the Conditions of Approval for the Project. Of note fire sprinklers and fire extinguishers are required for the development. Conditions 81 EXHIBIT BAttachment 1 are from the San Bernadino County Fire Department. Public Works Comments: The City Engineer requested that their conditions be included with the Conditions of Approval for the Project. Of note, the conditions require undergrounding of overhead communication lines along Mount Vernon Avenue and that EXHIBIT B Attachment 1 Building & Safety Comments: The Building Official requested that their standards conditions be included with the Conditions of Approval for the Project. Of note, the conditions require a waste management plan and compliance with the National Pollutant Discharge Elimination Systems (NPDES). Conditions 121 through 135 EXHIBIT BAttachment 1 Department Refuse Comments: The City franchise waste hauler Burrtec Waste Industries, Inc. requested that their standards conditions be included with the Conditions of Approval for the Project. Of note, Burrtec is requiring the trash enclosure fit two standard 4-cubic yard bins and be roofed to match the building in color and finish. Conditions 136 through EXHIBIT BAttachment 1 are from Burrtec Waste Industries, Inc. Water & Wastewater Comments: The Applicant is required to submit utility plans and ensure the Project meets all water/wastewater requirements set forth by the City of Colton Public Works Department Water & Wastewater Division. Conditions 140 through EXHIBIT BAttachment 1 are from the City of Colton Public Works Department Water and Wastewater Division. The Riverside Highland Water Company has no issues with the Project. Findings for Approval of the Site and Architectural Review: This Project requires approval of a Site and Architectural Review pursuant to Grant Terrace Municipal Code Chapter 18.63 (Site and Architectural Review), in which Section 18.63.060 includes all the necessary findings. All necessary findings can be made and are provided as EXHIBIT CAttachment 1 to this agenda report. Conflict of Interest (500 feet): None. ENVIRONMENTAL REVIEW: Packet Pg. 15 B.1 This Project has been determined to be Categorically Exempt from the provisions of the California Environmental Quality Act (CEQA) pursuant to State CEQA Guidelines Section §15332 Class 32 \[In-Fill Development Projects\]. A Notice of Exemption will be filed with the County Clerk and State Clearinghouse upon Project approval. NOTIFICATION: The Public Hearing Notice for the Project was published in compliance with the City's agenda item in the Thursday, March 21, 2024, edition of the Grand Terrace City News.com local newspaper. A mailer was sent out to all owners of real property located Notice was also posted in three public places, including the Grand Terrace News Paper, City Hall Lobby and Kiosk, and at the project site. CONCLUSION: Staff recommends that the Planning Commission/Site and Architectural Review Board approve the Resolution provided as Attachment 1 to this agenda report approving the Review 23-23 would authorize a new two story 12,406 square foot dental office building with site improvements consisting of but not limited to all new landscaping, trash enclosure, parking lot, underground retention system, and a solar canopy for cars. It should be noted that Staff defers making any value judgments about paint colors, materials and finishes to the Commissioners. The Planning Commission/Site and Architectural Review Board is the approval body for the Site and Architectural Review 23-23. The dental office plan for Site and Architectural Review 23-23 is provided as EXHIBIT AAttachment 1 of the Resolution and is consistent with the Barton Road Specific Plan. A set of one-hundred and forty-four (144) Conditions of Approval have EXHIBIT BAttachment 1 for Site and Architectural Review 23-23 to ensure the orderly development of the Project in the Barton Road Specific Plan, Village Commercial, Planning Area 2 and to maintain the quality of life in Grand Terrace. The Municipal Code required findings for approval of Site and Architecture Review 23-EXHIBIT CAttachment 1. ATTACHMENTS: Attachment 1 - PC Resolution for SA23-23 (DOCX) Attachment 1 Exhibit A - Plan Set for SA23-23 (PDF) Attachment 1 - Exhibit B - Conditions for PC Resolution for SA23-23(DOCX) Attachment 1 - Exhibit C - Findings for PC Resolution for SA23-23(DOCX) Attachment 2 - Signage (PDF) Attachment 3 - LETTER OF INTENT (PDF) Attachment 4 - PWQMP (PDF) Packet Pg. 16 B.1 APPROVALS: Scott Hutter Completed 04/18/2024 1:21 PM City Manager Completed 04/18/2024 1:21 PM Planning Commission/Site And Architectural Review Board Pending 05/02/2024 6:30 PM Packet Pg. 17 B.1.a RESOLUTION NO. 2024-02 A RESOLUTION OF THE PLANNING COMMISSION/SITE AND ARCHITECTURAL REVIEW BOARD OF THE CITY OF GRAND TERRACE, CALIFORNIA, APPROVING SITE AND ARCHITECTURAL REVIEW 23-23 AND ENVIRONMENTAL 23-10, A DEVELOPMENT PROPOSAL BY THE APPLICANT, FIRESTATION PROPERTIES, LLC, REPRESENTED BY DAVID LANG, TO CONSTRUCT A NEW TWO STORY 12,406 SQUARE FOOT DENTAL OFFICE BUILDING, LANDSCAPING, TRASH ENCLOSURE, PARKING LOT, UNDERGROUND RETENTION SYSTEM, AND A SOLAR CANOPY FOR CARS ON THE VACANT 1.67-ACRE PROPERTY LOCATED WITHIN THE BARTON ROAD SPECIFIC PLAN (BRSP) VILLAGE COMMERCIAL (VC) PLANNING AREA 2 (P.A.2.) AT THE CORNER OF MOUNT VERNON AND CITY CENTER COURT (APNS: 1178-01-109,1178-01-110, AND 1178-01-111), AND FINDING THE PROJECT CATEGORICALLY EXEMPT FROM THE PROVISIONS OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) PURSUANT TO SECTION 15332 CLASS 32 (IN-FILL DEVELOPMENT PROJECTS) WHEREAS, Lang, has filed an application for Site and Architectural Review 23-23 and Environmental 23-10; proposing to construct a two-story dental office building up to 12,406 square feet on a 1.67-acre site, on the corner of Mount Vernon and City Center Court (APNS: 1178-01-109,1178-01-110, and 1178-01-111) enclosure, bike rack, parking lot, underground stormwater retention system, solar canopy, site lighting and streetlights; and WHEREAS, the subject property is zoned Barton Road Specific Plan (BRSP), Village Commercial (VC), Planning Area 2 (P.A.2.); and WHEREAS, the BRSP is a regulatory plan that serves as zoning law for all properties located within the boundaries of the Plan and all discretionary development approvals must be consistent with the BRSP; and WHEREAS, the City of Grand Terrace wishes to protect and preserve the quality of the Barton Road Specific Plan area of the City, as well as the quality of life throughout the City, through effective land use and planning; and WHEREAS, Municipal Code Section §18.63.010 of the Grand Terrace Municipal Code states that a Site and Architectural Review application provides a process for reviewing all major new construction projects, and the process calls for the review of the design of the development, an identification of potential impacts on the surrounding properties, and an assurance that the proposed Project complies with the provisions of the Barton Road Specific Plan, Zoning Code and General Plan; and WHEREAS, Municipal Code Section §18.63.020 (D.) identifies the Site and Architectural Review Board the approval authority for all nonresidential Site and Architectural Review applications; and Attachment: Attachment 1 - PC Resolution for SA23-23 (Spring Hills Family Dentistry Site and Architectural Review 23-23) WHEREAS, Site and Architectural Review 23-23 is solely for the proposed new 12,406 square foot, single-tenant, two-story, Spring Hills Family Dentistry Building and related site, Page 1 of 6 Packet Pg. 18 B.1.a landscape, hardscape, and signage improvements on the vacant parcels located at the northeast corner of Mount Vernon and City Center Court (APNs:1178-01-109, 110 & 111) shall adhere to the EXHIBIT A WHEREAS, a set of one-hundred and forty-four (144) Conditions of Approval have been EXHIBIT B-23 to ensure the orderly development of the Project in the Barton Road Specific Plan, Village Commercial, Planning Area 2 and to maintain the quality of life in Grand Terrace; and WHEREAS, the City finds, that this proposed Site and Architectural Review 23-23 is Categorically Exempt from the provisions of the California Environmental Quality Act (CEQA) pursuant to Section §15332 Class 32 (In-Fill Development Projects) of CEQA; and WHEREAS, the Applicant applied for a Lot Merger 24-01 to join multiple parcels (APNs 1178-01-109; 1178-01-110; and 1178-01-111) into one lot. The Lot Merger is concurrently being processed ministerially though City Engineering and Planning Pursuant to the Grand Terrace Municipal Code; and WHEREAS, the Barton Road Specific Plan (BRSP) gives the Grand Terrace Planning development regulations of developments within Specific Plan the based upon the merits of a proposed project; and WHEREAS required parking spaces not to exceed 20% of the required standard; 2) Increased building height; 3) other development standards as approved by the Planning Commission (e.g., landscape coverage percentage%); and WHEREAS, the Applicant has requested an incentive bonus for reduced landscape coverage percentage not to exceed 20% of the required standard for landscaping so as to provide double the amount of parking on site from the Municipal Code minimum requirement in order to ensure that no patrons or staff overflow onto adjacent public rights-of-way; and WHEREAS, Project is proposes to consolidate 3 lots into 1 and in doing so would result in a reduction in access points in contrast to if each lot was developed individually, and the landscaping on the project includes a semi-public pedestrian open space towards the Barton Road frontage with a public art piece; and WHEREAS, on April 4, 2024, the City of Grand Terrace Planning Commission/Site and Architectural Review Board conducted a duly noticed Public Hearing on Site and Architectural Review 23-23, and considered testimony and evidence presented by the Applicant, the public, city staff, and other interested parties, at the Public Hearing held within respect thereto; and WHEREAS, all legal prerequisites to the adoption of this Resolution have occurred. NOW THEREFORE, THE PLANNING COMMISSION/SITE ARCHITECTURAL REVIEW BOARD OF THE CITY OF GRAND TERRACE DOES HEREBY RESOLVE AS FOLLOWS: Attachment: Attachment 1 - PC Resolution for SA23-23 (Spring Hills Family Dentistry Site and Architectural Review 23-23) SECTION 1. The foregoing recitals set forth above are true and correct and incorporated herein by this reference and made a part hereof. Page 2 of 6 Packet Pg. 19 B.1.a SECTION 2. The Planning Commission/Site and Architectural Review Board hereby finds that Site and Architectural Review 23-23 is Categorically Exempt from the provisions of the California Environmental Quality Act (CEQA) pursuant to Section §15332 Class 32 (In-Fill Development Projects), based on the following: 1) The project is consistent with the applicable general plan designation and all applicable general plan policies as well as with all applicable zoning designations and regulations. The new two-story dental office building and site improvements include landscaping, trash enclosure, bike rack, parking lot, underground stormwater retention system, solar canopy, site lighting and streetlights has been determined to be consistent with the Barton Road Specific Plan (BRSP), Village Commercial (VC), Planning Area 2 (P.A.2.). 2) The proposed development occurs within city limits on a project site of no more than five acres substantially surrounded by urban uses. The Project site is located within the City of Grand Terrace, on a 1.67-acre site, on the corner of Mount Vernon and City Center Court (APNS: 1178-01-109,1178-01-110, and 1178-01-111). The 1.67-acre site for the Project is currently vacant. It is bordered by the San Bernardino County Fire Station 23 to the east, commercial buildings to the north, Mt. Vernon Avenue to the west, and City Center Court to the south. Thus the Project is substantially surrounded by Urban uses. 3) The project site has no value as habitat for endangered, rare or threatened species. The site is a relatively flat vacant lot that is annually weeded and maintained by the property ownership. There is no value as habitat for endangered, rare or threatened species. 4) Approval of the project would not result in any significant effects relating to traffic, noise, air quality, or water quality. Approval of the new two-story dental office building and site improvements include landscaping, trash enclosure, bike rack, parking lot, underground stormwater retention system, solar canopy, site lighting and streetlights will not result in any significant effects related to traffic, noise, air quality, or water quality. 5) The site can be adequately served by all required utilities and public services. The Project site has been reviewed by utility agencies and as designed and conditioned the Project can be adequately served by all required utilities and public services. SECTION 3. The Planning Commission/Site and Architectural Review Board further finds for Site and Architectural Review 23-23 pursuant to Grand Terrace Municipal Code Section 18.63.060 as follows: Attachment: Attachment 1 - PC Resolution for SA23-23 (Spring Hills Family Dentistry Site and Architectural Review 23-23) 1) The proposed project is consistent with the intent of this code and the general plan; and, Page 3 of 6 Packet Pg. 20 B.1.a 2) The location and configuration of all structures associated with this project are visually harmonious with this site and surrounding sites and structures, that they do not interfere with the neighbors' privacy, that they do not unnecessarily block scenic views from other structures and/or public areas and are in scale with the townscape and natural landscape of the area; and, 3) The architectural design of structures, their materials and colors are visually harmonious with surrounding development, natural landforms, are functional for the proposed project and are consistent with this code; and, 4) The plan for landscaping and open spaces provides a functional and visually pleasing setting for the structures on this site and is harmonious with the natural landscape of the area and nearby developments; and, 5) There is no indiscriminate clearing of property, destruction of trees or natural vegetation or the excessive and unsightly grading of hillsides, thus the natural beauty of the city, its setting and natural landforms are preserved; and, 6) The design and location of all signs associated with this project are consistent with the scale and character of the building to which they are attached or otherwise associated with and are consistent with this code; and, 7) Conditions of approval for this project necessary to secure the purposes of this code and general plan are made a part of this approval. EXHIBIT CResolution and incorporated herein by this reference. SECTION 4. Based upon the forgoing and all oral and written communications from members of the public and City staff (including, but not limited to, all oral and written staff reports and attachments) presented at the April 4, 2024, Public Hearing, the Planning Commission/Site and Architectural Review Board hereby approves Site and Architectural Review 23-23, a request by the Applicant, Firestation Properties, LLC., for approval to construct a new 12,406 square foot, two story dental office building on a vacant 1.67-acre site, located at the northeast corner of Mount Vernon and City Center Court (APNs:1178-01-109, 110 & 111) as depicted on the comprehensive architectural design package included EXHBIT A Conditions of Approval for Site and Architectural Review 23-23, which are included EXHIBIT BResolution and incorporated herein by this reference. SECTION 5. If any section, subsection, subdivision, paragraph, sentence, clause, or phrase contained approved by this Resolution, or any part thereof, is for any reason held to be unconstitutional or invalid or ineffective by any court of competent jurisdiction, such decision shall not affect the validity of effectiveness of the remaining portions of this Resolution or any part thereof. The Planning Commission/Site and Architectural Review Board hereby declares that it would have passed each section, subsection, subdivision, paragraph, sentence, clause, or phrase thereof irrespective of the fact that any one or more subsections, subdivisions, paragraphs, sentences, Attachment: Attachment 1 - PC Resolution for SA23-23 (Spring Hills Family Dentistry Site and Architectural Review 23-23) clauses, or phrases are declared unconstitutional, invalid, or ineffective. Page 4 of 6 Packet Pg. 21 B.1.a SECTION 6. This Project entitlement Site and Architectural Review 23-23 shall become effective following the expiration of a ten (10) calendar day appeal period without filing of an appeal application from the date of Planning Commission/Site and Architectural Review Board. SECTION 7. Site and Architectural Review 23-23 shall expire two (2) years from the date of its approval unless the following actions occur: 1) The applicant applies for a building permit and commits substantial investment in accordance with the approved plans prior to the expiration date. 2) A business license is issued in accordance with this Code, as applicable. 3) The applicant has complied with all applicable conditions of approval. In case the Applicant is not able to comply with actions 1, 2 or 3 listed above, then the Applicant shall apply for maximum of a one (1) year extension at least sixty (60) days prior to expiration date of the initial two (2) year approval period. SECTION 8. City staff are hereby authorized and directed to file a Notice of Exemption (NOE) per Environmental 23-10 review with respect to the approval of Site and Architectural Review 23-23. APPROVED AND ADOPTED by the Planning Commission/Site and Architectural Review th Board of the City of Grand Terrace, California, at a regular Public Hearing held on the 4 day of April 2024. ATTEST: __________________________ __________________________ Debra L. Thomas Edward A. Giroux City Clerk Chairman Attachment: Attachment 1 - PC Resolution for SA23-23 (Spring Hills Family Dentistry Site and Architectural Review 23-23) Page 5 of 6 Packet Pg. 22 B.1.a STATE OF CALIFORNIA ) COUNTY OF SAN BERNARDINO ) SS. CITY OF GRAND TERRACE ) I Debra Thomas, City Clerk of the CITY OF GRAND TERRACE, CALIFORNIA, DO HEREBY CERTIFY that the foregoing Resolution, being Resolution No. 2024-02, was duly passed, approved and adopted by the Planning Commission/Site and Architectural Review Board, approved and signed by the Chairman, and attested by the City Clerk, at the regular meeting of th said Planning Commission/Site and Architectural Review Board held on the 4 day of April 2024, and that and that it was adopted by the called vote as follows: AYES: NOES: ABSENT: ABSTAIN: RECUSE: th Executed this 4 day of April 2024, at Grand Terrace, California. ___________________________ Debra Thomas City Clerk Attachment: Attachment 1 - PC Resolution for SA23-23 (Spring Hills Family Dentistry Site and Architectural Review 23-23) Page 6 of 6 Packet Pg. 23 CINNAMOMUM BURMANNII CAMPHOR TREE ROSA X ‘ICEBERG’ ICEBERG FLORIBUNDA ROSE B.1.c EXHIBIT B CONDITIONS OF APPROVAL FOR SITE AND ARCHITECTURAL REVIEW 23-23 Vacant 1.67-acre Property Located At The Corner Of Mount Vernon And City Center Court (APNs: 1178-01-109,1178-01-110, and 1178-01-111) 12,406 Square Foot Spring Hills Family Dentistry Building PROJECT DESCRIPTION: 1. This Project is approved to establish a two-story 12,406 square foot dental office building on a 1.66-acre vacant site located at the Northeast corner of Mounter Vernon Avenue and City Center Court. The application materials are approved as submitted and conditioned herein and shall not be further altered except as modified by these conditions of approval, and unless reviewed and approved by the affected departments. GENERAL CONDITIONS: 2. If not appealed, this approval shall become effective on the eleventh (11th) calendar business day following such eleventh (11th) calendar day when the eleventh (11th) calendar day is not a City business day. This approval shall expire twenty-four (24) months from the date of adoption of this Resolution unless building permits have been issued and a substantial investment in reliance of those permits has occurred; all conditions of approval have been met; or a time extension has been granted by the Planning and Development Services Director, in accordance with Chapter 18.83, and Chapter 18.63 of the Zoning Code. Time extensions shall be filed at least sixty (60) days prior to the expiration date. The Planning Director may, upon application by the Applicant, extend the compliance period for a up to one year. No approval shall be extended by the Planning Director to a date beyond two years from the date of the initial approval. 3. Within 24 hours of this approval of the subject Project, the Applicant shall deliver a payment of $50.00 and (check should be made out to the Clerk of the Board of Supervisors to enable the City to file the Notice of Exemption. If within such 48 hour period the payment has not been delivered to the Community Development Department by the above-noted check, the statute of limitations for any interested party to challenge the environmental determination under the provisions of the California Environmental Quality Act could be significantly lengthened. 4. Minor modifications to this approval which are determined by the Planning and Development Services Director to be in substantial conformance with the approved Attachment: Attachment 1 - Exhibit B - Conditions for PC Resolution for SA23-23 (Spring Hills Family Dentistry Site and Architectural Review Exhibit B Resolution No. 2024-02 Page 1 of 18 Packet Pg. 51 B.1.c site plan, and which do not intensify or change the use or require any deviations from adopted standards, may be approved by the Planning and Development Services Director upon submittal of the required application(s) and the required fee(s) consistent with the Grand Terrace Municipal Code. 5. Operational and construction activities associated with the Project shall comply Terrace Municipal Code. 6. a debris management plan to divert the material from landfills by the use of separate recycling bins (e.g., wood, concrete, steel, aggregate, glass) during demolition and construction to minimize waste and promote recycle and reuse of the materials. 7. All trash and refuse shall be disposed of in Burrtec dumpsters pursuant to City Codes and removed from the premises on an as needed basis. At the end of each day of construction activity, all construction debris and waste materials shall be collected and properly disposed of in trash or recycling bins. General Contractor shall sweep the Project site at the end of the day during construction. 8. Outdoor storage shall be prohibited. 9. A building permit shall be obtained for any tenant improvement, construction, remodel, renovation, or expansion. 10. Prior to implementation of any revisions or modifications requested by the Applicant, including but not limited to changes to these conditions, expansions, land use intensity, or hours of operation, the applicant shall apply for the required approvals which shall be processed in the same manner as the original approval consistent with Municipal Code Chapter 18.83 and Chapter 18.63. Such approvals 11. The Applicant shall indemnify, protect, defend, and hold harmless the City, and any agency or instrumentality thereof, and officers, officials, employees, or agents thereof, from any and all claims, actions, suits, proceedings, or judgments against the City, or any agency or instrumentality thereof, and any officers, officials, employees, or agents thereof to attack, set aside, void, or annul, an approval of the City, or any agency or instrumentality thereof, advisory agency, appeal board, or legislative body, including actions approved by the voters of the City, concerning the Project and the approvals granted herein. Furthermore, the Applicant shall indemnify, protect, defend, and hold harmless the City, or any agency or instrumentality thereof, against any and all claims, actions, suits, proceedings, or subject to that other governmental entity's approval and a condition of such approval is that the City indemnify and defend such governmental entity. Attachment: Attachment 1 - Exhibit B - Conditions for PC Resolution for SA23-23 (Spring Hills Family Dentistry Site and Architectural Review Exhibit B Resolution No. 2024-02 Page 2 of 18 Packet Pg. 52 B.1.c 12. In the event that this approval is legally challenged, the City will promptly notify the Applicant of any claim or action and will cooperate fully in the defense of the matter. Once notified, the Applicant agrees to defend, indemnify, and hold harmless the City, its officers, agents and employees from any claim, action or proceeding against the City of Grand Terrace. The Applicant further agrees to reimburse the pay as a result of such action, but such participation shall not relieve Applicant of his or her obligation under this condition. 13. Upon approval of these conditions by the Planning Commission and prior to Conditions of ApprovalThe form and content shall be prepared by the Planning and Development Services Department. 14. In the event that exhibits, and written conditions are inconsistent, the written conditions shall prevail. 15. The Applicant shall comply with all laws, including but not limited to all Federal, State, County and Local laws, at all times. 16. The Applicant shall be responsible for regular and ongoing upkeep and maintenance of the site. 17. All drainage shall be mitigated on-site, no cross-lot drainage will be allowed unless suitable easements are provided prior to issuance of the grading permit. 18. Any future development on the site, including alterations, conversions, remodels, and new structures shall require compliance with the Municipal Code. 19. A copy of the accepted Conditions of Approval shall be placed on the final construction plans. Final construction plans shall be placed at the job site until receipt of final Certificate of Occupancy. The Applicant shall be fully responsible for knowing and complying with all Conditions of Approval. 20. The Applicant shall be responsible for regular and ongoing upkeep and maintenance of the site, including parking lot paving condition and striping, clearing of trash, weeds and debris, lighting, and other site improvements. All parking facilities shall be maintained in good condition, no cracks, no potholes, no fading parking stripping. The maintenance thereof may include but shall not be limited to the repaving, sealing, and striping of a parking area and the repair, restoration and/or replacement of any parking area design features when deemed necessary by the City to insure the health, safety, and welfare of the general public. Attachment: Attachment 1 - Exhibit B - Conditions for PC Resolution for SA23-23 (Spring Hills Family Dentistry Site and Architectural Review Exhibit B Resolution No. 2024-02 Page 3 of 18 Packet Pg. 53 B.1.c LANDSCAPING: 21. relaxed development regulations of landscaping from 25% to 20%, based upon the merits of the proposed project which entails the consolidation of existing lots. A reduction in landscape coverage shall not exceed 20% of the required standard. 22. During the first Plan Check submittal, the Applicant shall submit three sets of final landscape plan(s) and a digital copy prepared by a state licensed Landscape Architect, subject to the approval of the Community Development Department, and Public Works Department for landscaping in the public right-of-way. An initial $2,000 Irrigation and landscape deposit shall be included with the submittal for 23. Ordinance (Chapter 15.56) Landscaping Standards contained in Chapter 18.60 of the Zoning Code and in compliance with the most recent version of the State Model Ordinance. 24. Applicant shall maintain the property and landscaping in a clean condition, without weeds and debris and all dead and dying plants shall be replaced. 25. For the lifetime of this Project, Applicant must replace all dead or missing plants and trees as to comply with the approved landscape plan. The replacement plants and trees shall be similar or equivalent type, size, and height of the specimen being replaced as originally planted pursuant to the approved Landscaping and Irrigation Plan. The plant material replacement shall be installed within 30 days of being notified by city staff. 26. Landscape plans shall depict the utility laterals, hardscape improvements, fencing, walls and tree locations. 27. Irrigation plans shall include all connections and locations to the City mains for on- site irrigation, including all meter and backflow prevention devices. 28. infrastructure becomes available to the Project, the Property Owner shall disconnect irrigation from potable source and connect to reclaimed water source resulting in a non-potable irrigation system for the Project. 29. Applicant must install root barriers, adjacent to back side of sidewalk, when planting on-site tree(s) within 10 feet from the public right-of-way and public sidewalk. Attachment: Attachment 1 - Exhibit B - Conditions for PC Resolution for SA23-23 (Spring Hills Family Dentistry Site and Architectural Review Exhibit B Resolution No. 2024-02 Page 4 of 18 Packet Pg. 54 B.1.c 30. Prior to the issuance of Certificate of Occupancy, the landscape inspection shall be approved by city staff. The final landscape inspection shall be requested by the Applicant a week prior to the desired inspection date. 31. The landscaping plans shall include dimensions and show the location of fire hydrants and parking lighting. 32. Tree removal or replacement shall be in accordance with the Tree Preservation Ordinance. PUBLIC ART: 33. The Applicant shall comply with the requirements of Grand Terrace Municipal Code Chapter 18.81 Art in Public Places and submit a complete Art in Public Places Program proposal to the City. The Art in Public Places proposal for the Project will be brought before the City Planning Commission for consideration and approval prior to issuance of building permits for the dental office building. 34. The Art in Public Places art piece shall be completed, installed, and inspected prior to issuance of the final Certificate of Occupancy of the building. 35. It will be the responsibility of the property owner to provide maintenance and upkeep of the art piece(s) to preserve and maintain the work(s) of art in good condition and in the manner approved by the City. PRIOR TO GRADING: 36. Prior to issuance of grading permits, the Applicant shall submit a photometric plan and final lighting plan to City staff showing the exact locations of light poles and the orientation and shielding of all light fixtures to prevent glare onto existing and potential future development surrounding the Project Site. 37. Lighting shall remain on during nighttime hours of operations and security cameras shall be installed. 38. The Applicant shall comply with the National Pollutant Discharge Elimination System (NPDES). 39. Prior to issuance of grading permits, the Applicant shall submit to the City Engineer a Notice of Intent (NOI) to comply with obtaining coverage under the National Pollutant Discharge Elimination System (NPDES) General Construction Storm Water Permit from the State Water Resources Control Board. Evidence that this has been obtained (i.e., a copy of the Waste Dischargers Identification Number) shall be submitted to the City Engineer for coverage under the NPDES General Construction Permit. Attachment: Attachment 1 - Exhibit B - Conditions for PC Resolution for SA23-23 (Spring Hills Family Dentistry Site and Architectural Review Exhibit B Resolution No. 2024-02 Page 5 of 18 Packet Pg. 55 B.1.c 40. Prior to issuance of a grading permit, Applicant must submit improvement plans on minimum 24" x 36" sheets having the City's standard signature blocks. All plans must be drawn in ink and must be signed by a California State Registered Civil Engineer at the time of first submittal. Applicant must submit improvement plans for the entire Project as one package and must include all Project improvements shown on the approved Project exhibits and those to be designed per these Conditions. Piecemeal submittal of plans is not acceptable. Plans and studies must be signed by a California State Registered Civil Engineer at the time of first submittal. This package must include all supporting studies. 41. Under no condition shall there be stockpiling of material on the Project site prior to the issuance of the grading permit. 42. Prior to the issuance of a grading permit, the Applicant shall obtain clearances, including but not limited to license agreements, quitclaims, or other applicable documentation for all easements traversing the Project site. A copy of the easement clearances shall be provided to the City Engineer for review. 43. Prior to the issuance of a grading permit the ministerial review and approval of Lot Merger to join APNs 1178-011-09; 1178-011-10; and 1178-011-11, shall be recorded and accepted by San Engineer shall review and approve the final documents prior to recordation. The City Clerk Division shall record the Lot Merger, the review and recording fees shall be borne by the Project Applicant. SIGNAGE: 44. Signs are not approved as a part of this permit. Prior to establishing any new signs, the Applicant shall submit an application with fee payment, and receive approval, for a sign permit from the Planning Division (pursuant to Chapter 18.80 of the Grand Terrace Municipal Code) and a building permit for construction of the signs from the Building Division, as applicable. PRIOR TO CONSTRUCTION: 45. The Applicant shall submit a completed building permit application and the following documents for plan check review: (4) Architectural Floor Plans & Elevations (2) Structural Plans (2) Structural Calculations (4) Plot/Site Plans (2) Electrical Plans (2) Electrical Load Calculations (2) Plumbing Plans/Isometrics, Water, Sewer and Gas (2) Mechanical Plans (2) Mechanical Duct Layout Plans Attachment: Attachment 1 - Exhibit B - Conditions for PC Resolution for SA23-23 (Spring Hills Family Dentistry Site and Architectural Review Exhibit B Resolution No. 2024-02 Page 6 of 18 Packet Pg. 56 B.1.c (2) Roof and Floor Truss Plans if applicable (2) Title 24 Energy Calculations (2) Drainage Plans (2) Photovoltaic (PV) Solar Plans (2) Soils Reports (2) Best Management Plan (BMP) (Reviewed by Public Works Department) (2) Precise Grading Plans (Reviewed by Public Works Department) (2) Stormwater Pollution Prevention Plan (SWPPP) (Reviewed by Public Works) (2) Water Quality Management Plan (WQMP) (Reviewed by Public Works Department) Any studies/reports required within these conditions require a deposit to cover the cost of the review of the studies. Additional deposits may be required, or a refund issued when the costs do not match the deposits. 46. The Applicant shall implement SCAQMD Rule 403 and standard construction practices during all operations capable of generating fugitive dust, which will include but not be limited to the use of best available control measures and reasonably available control measures such as: a. Water active grading areas and staging areas at least twice daily as needed; b. Ensure that all disturbed areas are treated to prevent erosion until the site is constructed upon. c. Ensure that landscaped areas are installed as soon as possible to reduce the potential for wind erosion. d. Suspend grading activities when wind gusts exceed 25 mph; e. Sweep public paved roads if visible soil material is carried off-site; f. Enforce on-site speed limits on unpaved surface to 15 mph; and g. Discontinue construction activities during Stage 1 smog episodes. 47. All structures shall be designed in accordance with the currently adopted building codes by the State of California and City of Grand Terrace Municipal Code as adopted at time of plan submittal. If a new code has been adopted prior to the submittal, then all structures shall be designed to the current model code year. 48. All construction sites must be protected by a security fence and screening. The fencing and screening shall be maintained at all times to protect pedestrians. 49. Temporary toilet facilities shall be provided for construction workers. The toilet facilities shall be maintained in a sanitary condition. Construction toilet facilities of the non-sewer type shall conform to American National Standards Institute ANSI ZA.3. 50. Construction projects which require temporary electrical power shall obtain an Electrical Permit from Building & Safety. No temporary electrical power will be Attachment: Attachment 1 - Exhibit B - Conditions for PC Resolution for SA23-23 (Spring Hills Family Dentistry Site and Architectural Review Exhibit B Resolution No. 2024-02 Page 7 of 18 Packet Pg. 57 B.1.c granted to a project unless one of the following items is in place and approved by Building & Safety and the Planning Division: (A) Installation of a construction trailer, or, (B) Security fenced area where the electrical power will be located. 51. Installation of construction/sales trailers must be located on private property. No trailers can be located in the public street right of way. 52. Separate plan submittals and permits are required for all accessory structures including but not limited to patios, block walls, storage buildings, community playgrounds, etc. 53. Pursuant to the California Business and Professions Code Section 6735, most projects are required to be designed by a California Licensed Architect or Engineer. The Applicant should review the section of the California Codes and comply with the regulation. 54. Prior to issuance of building permits for the perimeter decorative block walls/fences on shared property lines, the Applicant shall submit a Fence/Wall Agreement signed by the adjacent property owners authorizing construction of the wall/fence on the shared property line. In the absence of a Fence/Wall agreement, the construction plans shall demonstrate the perimeter decorative block walls/fences constructed consistent with the approved site plan, including decorative pilasters and privacy hedges. 55. The precise grading plan with hydrology study, hydraulic calculations, and soils report for the Project shall be approved by the City Engineer prior to issuance of any building permits. 56. All contractors shall acquire a valid City business license and be in compliance with all City codes. 57. The Applicant shall ensure that all construction contractors and subcontractor personnel are made aware of the required best management practices and good housekeeping measures for the Project construction site and any associated construction lay-down areas. Any surplus construction materials shall be stored so as to be screened from public view when not in use and be removed from the property upon completion of construction activities. 58. All parking spaces, loading areas, and drive aisles shall comply with the standards established in the Grand Terrace Municipal Code. 59. The Applicant shall construct any and all City required public right-of-way improvements in compliance with in accordance with all requirements of the State of California Accessibility Standards, Title 24 California Administrative Code and Attachment: Attachment 1 - Exhibit B - Conditions for PC Resolution for SA23-23 (Spring Hills Family Dentistry Site and Architectural Review Exhibit B Resolution No. 2024-02 Page 8 of 18 Packet Pg. 58 B.1.c the prevailing City standards and requirements at the time of construction to the satisfaction of the City Engineer. 60. Any abandoned wells on the property or similar structures shall be destroyed in a manner approved by the Public Works Department in accordance with the State of California Department of Health Services or other appropriate oversight agency. 61. Applicant shall pay for the relocation of any power poles or other existing public utilities, as necessary. 62. All necessary precautions and preventive measures shall be in place in order to prevent material from being washed away by surface waters or blown by wind. These controls shall include at a minimum: regular wetting of surface or other similar wind control method, installation of straw or fiber mats to prevent rain related erosion. Detention basin(s) or other appropriately sized barrier to surface flow must be installed at the discharge point(s) of drainage from the site. Any water collected from these controls shall be appropriately disposed of at a disposal site. These measures shall be added as general notes on the site plan and a statement added that the operator is responsible for ensuring that these measures continue to be effective during the duration of the Project construction. 63. Any exterior structural equipment, or utility transformers, boxes, ducts, or meter cabinets shall be architecturally screened by wall or structural element, blending with the building design and include landscaping when on the ground. 64. During construction of the site, the Project shall comply with Grand Terrace Municipal Code Section 8.108.040 (Special Activities) which prohibits construction activities between the hours of 8:00 p.m. to 7:00 a.m. Monday through Saturday, and no construction activity shall take place at any time on Sunday or national holidays. No heavy construction occurs on weekends or national holidays. 65. Prior to issuance of any Building Permits, the Applicant shall submit to the Community Development Department proof of payment or waiver from both the City of San Bernardino for sewer capacity fees and Colton Unified School District for school impact fees. 66. All Development Impact fees shall be paid to the City of Grand Terrace prior to the issuance of any building permits. PRIOR TO THE ISSUANCE OF FINAL CERTIFICATE OF OCCUPANCY: 67. The Applicant shall complete all public improvements and obtain acceptance for the public improvements from the City Engineer. 68. - complete set of final plans that reflect the changes to the improvements as Attachment: Attachment 1 - Exhibit B - Conditions for PC Resolution for SA23-23 (Spring Hills Family Dentistry Site and Architectural Review Exhibit B Resolution No. 2024-02 Page 9 of 18 Packet Pg. 59 B.1.c constructed. Digital and physical copies of the final plans shall be provided to the Building Official prior to the issuance of Final Certificate of Occupancy of the building. 69. The Applicant shall comply with all state law regarding waste management and the 70. The Applicant shall purchase, install, and energize the streetlights to the satisfaction of the City Engineer, prior to the issuance of Final Certificate of Occupancy of the building. The manufacturer and model of the streetlights shall be reviewed and approved by the City Engineer prior to purchase and installation by the Applicant. 71. Any damage to existing improvements as a result of this Project shall be repaired by the Applicant to the satisfaction of the City Engineer, prior to the issuance of Final Certificate of Occupancy of the building. 72. The Applicant shall screen all mechanical equipment including the HVAC units from public view prior to the issuance of Final Certificate of Occupancy of the building. 73. infrastructure or encode instruction for construction or maintenance workers that is associated with this Project shall be removed by the Applicant prior to the issuance of Final Certificate of Occupancy of the building. 74. Prior to the issuance of Final Certificate of Occupancy of the building, the Applicant shall screen all ground mounted equipment, including backflow devices, in a manner that does not impede traffic visibility. Screening is in addition to required backflow protection cages/enclosures that shall be required for all backflow preventer valves, irrigation valves, bypass meter assemblies and similar devices associated with the development. 75. The Applicant shall obtain a building permit prior to fabrication and construction of the monument sign and building wall signs depicted on the approved plans. 76. The Applicant shall submit final grade certifications, by the grading engineer, to the Public Works Department prior to issuance of any Certificate of Occupancy. 77. Prior to the issuance of Final Certificate of Occupancy of the building, Applicant must have completed installation of any and all public right-of-way improvements as shown on the City approved improvement plans. 78. Prior to the issuance of Final Certificate of Occupancy of the building, the future tenant shall comply with Local, State, and Federal requirements, and obtain a Attachment: Attachment 1 - Exhibit B - Conditions for PC Resolution for SA23-23 (Spring Hills Family Dentistry Site and Architectural Review Exhibit B Resolution No. 2024-02 Page 10 of 18 Packet Pg. 60 B.1.c operations. The business license shall be renewed annually, at the beginning of each calendar year, during the month of January, for as long as the business in operation. 79. Prior to the issuance of final Certificate of Occupancy of the building, any tenant that will be leasing the facility shall set up waste services with Burrtec and comply with the required trash collection services as required by Burrtec. 80. The Applicant is responsible for the coordination of the final Certificate of Occupancy for the building and shall obtain clearances from each department and division prior to requesting a final building inspection from Building & Safety. Each agency shall sign the bottom of the Job Card or Certificate of Occupancy Clearance Form. FIRE DEPARTMENT CONDITIONS: 81. F01 Jurisdiction: The Project is under the jurisdiction of the San Bernardino County any parcel, the applicant shall contact the Fire Department for verification of current fire protection requirements. All new construction shall comply with the current California Fire Code requirements and all applicable statutes, codes, ordinances, and standards of the Fire Department. 82. F02 Fire Fee: The required fire fees shall be paid to the San Bernardino County Fire Department/Community Safety Division. 83. F09 Building Plans: Building Plans shall be submitted to the Fire Department for review and approval. The required fees shall be paid at the time of plan submittal. 84. F10 Combustible Protection: Prior to combustibles being placed on the project site an approved all-weather fire apparatus access surface and operable fire hydrants with acceptable fire flow shall be installed. The topcoat of asphalt does not have to be installed until final inspection and occupancy. 85. F19 Surface: Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be surfaced so as to provide all-weather driving capabilities. Road surface shall meet the approval of the Fire Chief prior to installation. All roads shall be designed to 85% compaction and/or paving and hold the weight of Fire Apparatus at a minimum of 80K pounds. 86. F22 Primary Access Paved: Prior to building permits being issued to any new structure, the primary access road shall be paved or an all-weather surface and shall be installed as specified in the General Requirement conditions including width, vertical clearance and turnouts. Attachment: Attachment 1 - Exhibit B - Conditions for PC Resolution for SA23-23 (Spring Hills Family Dentistry Site and Architectural Review Exhibit B Resolution No. 2024-02 Page 11 of 18 Packet Pg. 61 B.1.c 87. F24 Fire Lanes: The applicant shall submit a fire lane plan with the building construction plans to the Fire Department for review and approval. Fire lane curbs shall be painted red. "No Parking, Fire Lane" signs shall be installed on public/private roads in accordance with the approved plan. 88. F26 Fire Flow Test: Please provide a fire flow test report from your water purveyor that has been completed in the last six months demonstrating that the fire flow demand is satisfied. 89. F37 Fire Sprinkler-NFPA #13: An automatic fire sprinkler system complying with NFPA Pamphlet #13 and Fire Department standards is required. The applicant shall hire a licensed fire sprinkler contractor. The fire sprinkler contractor shall submit plans with hydraulic calculations, manufacturers specification sheets and a letter from a licensed structural (or truss) engineer with a stamp verifying the roof is capable of accepting the point loads imposed on the building by the fire sprinkler system design to the Fire Department for approval. The contractor shall submit plans showing type of storage and use with the applicable protection system. The required fees shall be paid at the time of plan submittal. 90. F45 Fire Extinguishers: Hand portable fire extinguishers are required. The location, type, and cabinet design shall be approved by the Fire Department. 91. F48 Material Identification Placards: The applicant shall install Fire Department approved material identification placards on the outside of all buildings and/or storage tanks that store or plan to store hazardous or flammable materials in all locations deemed appropriate by the Fire Department. Additional placards shall be required inside the buildings when chemicals are segregated into separate areas. Any business with an N.F.P.A. 704 rating of 2-3-3 or above shall be required to install an approved key box vault on the premises, which shall contain business access keys and a business plan. 92. F51 Commercial Addressing: Commercial and industrial developments of 100,000 sq. ft or less shall have the street address installed on the building with numbers that are a minimum eight (8) inches in height and with a one (1) inch stroke. The street address shall be visible from the street. During the hours of darkness, the numbers shall be electrically illuminated (internal or external). Where the building is two hundred (200) feet or more from the roadway, additional nonilluminated address identification shall be displayed on a monument, sign or other approved means with numbers that are a minimum of six (6) inches in height and three- quarter (¾) inch stroke. 93. F55 Key Box: An approved Fire Department key box is required. In commercial, industrial, and multi-family complexes, all swing gates shall have an approved fire department Lock (Knox ®). Attachment: Attachment 1 - Exhibit B - Conditions for PC Resolution for SA23-23 (Spring Hills Family Dentistry Site and Architectural Review Exhibit B Resolution No. 2024-02 Page 12 of 18 Packet Pg. 62 B.1.c 94. F56 Override Switch: Where an automatic electric security gate is used, an approved Fire Department override switch (Knox ®) is required. 95. F60 Solar Plans: Solar/PV Plans shall be submitted to the Fire Department for review and approval. The required fees shall be paid at the time of plan submittal. 96. F70 Additional Requirements: In addition to the Fire requirements stated herein, other onsite and off-site improvements may be required which cannot be determined at this time and would have to be reviewed after more complete improvement plans and profiles have been submitted to this office. 97. F71 Proposal Changes: Any changes to this proposal shall require a new Fire Department condition letter. PUBLIC WORKS CONDITIONS: 98. All work shall be in accordance with the latest edition of the Standard Specifications for Public Works Construction (Green Book), County of San Bernardino Standards, and City of Grand Terrace Standards. 99. Design and construct all public utilities to serve the site in accordance with City standards and requirements of the serving utility, including gas, electric, telephone, water, sewer and cable TV. 100. Proposed public sewer improvement plans shall be submitted to the City of Colton Wastewater Department and Public Works for plan review and approval. 101. Proposed public water improvements plans shall be submitted to Riverside Highland Water Company for review and approval. 102. Proposed water improvement plans for fire hydrants shall be submitted to the County of San Bernardino Fire Department for plan review and approval. 103. All existing overhead communication lines along the Mount Vernon Avenue frontage shall be undergrounded. 104. Pavement restoration and trench repair for any street cuts shall be in conformance with San Bernardino County standards or as approved by the City Engineer. 105. The Applicant shall restore any public improvements along City Center Court and Mount Vernon Avenue that are currently in disrepair, not to ADA standard or damaged during construction. 106. A final drainage study will be required for the project and prepared in accordance with the San Bernardino County hydrology manual. Any drainage improvements needed to mitigate increase in runoff (for the 100-year storm event), mitigate Attachment: Attachment 1 - Exhibit B - Conditions for PC Resolution for SA23-23 (Spring Hills Family Dentistry Site and Architectural Review Exhibit B Resolution No. 2024-02 Page 13 of 18 Packet Pg. 63 B.1.c downstream impacts, and protect the development shall be designed and constructed at the Applicant 107. Concentrated drainage directed to the public street shall not be conveyed across the sidewalk or driveway approaches, but rather through parkway culverts/under sidewalk drains in accordance with San Bernardino County, SPPWC standards plans or as approved by the City Engineer. 108. An LED streetlight shall be constructed along the Mount Vernon Avenue frontage and be located near the southwest corner of the site. Also, an LED streetlight shall be constructed on the west side of the driveway on City Center Ct. 109. A final WQMP submittal will be required during the final engineering stage. If an infiltration treatment BMP is proposed as part of the design, site specific infiltration testing shall be conducted to substantiate the design infiltration rate used in the WQMP calculations. 110. All construction projects shall comply with the National Pollutant Discharge Elimination Systems (NPDES). Verification of coverage under the State Construction General Permit (CGP) will be required before a grading permit is issued by providing a copy of the Stormwater Pollution Prevention Plan (SWPPP) and printing the WDID # on the Onsite Grading Plan. 111. All proposed pavement sections shall be substantiated with pavement section recommendations (based on the appropriate R and TI values), which shall be included as part of the soils report. 112. An Onsite Improvement Plan shall be prepared by a California registered civil engineer and include a grading plan, erosion control plan, onsite water and sewer improvements, onsite storm drain system, onsite signing & striping, and all necessary details for construction of the proposed improvements. 113. An Offsite Street Improvement Plan for work within the public right-of-way, prepared by a California registered civil engineer, shall be submitted for review and approval prior to construction. All offsite improvements shall be clearly called out/detailed on the plan. 114. If non-standard retaining walls are proposed for this project, supporting structural calculations shall be submitted for review and approval. 115. Backflow preventers shall be installed for any building with the finished floor elevation below the rim elevation of the nearest upstream manhole. 116. Survey Monumentation. If any activity on this project will disturb any land survey monumentation, including but not limited to vertical control points (benchmarks), said monumentation shall be located and referenced by or under the direction of Attachment: Attachment 1 - Exhibit B - Conditions for PC Resolution for SA23-23 (Spring Hills Family Dentistry Site and Architectural Review Exhibit B Resolution No. 2024-02 Page 14 of 18 Packet Pg. 64 B.1.c licensed land surveyor or registered civil engineer authorized to practice land surveying prior to commencement of any activity with the potential to disturb said monumentation, and a comer record or record of survey of the references shall be filed with the County Surveyor pursuant to Section 8771(b) Business and Professions Code. 117. Record of Survey or Corner Record. Pursuant to Sections 8726(b) and/or 8773 of the Business and Professions Code, a Record of Survey or Comer Record shall be filed under any of the following circumstances: a. Monuments set to mark property lines or comers. b. Performance of a field survey to establish property boundary lines for the purposes of construction staking, establishing setback lines, writing legal descriptions, or for boundary establishment/mapping of the subject parcel. c. Any other applicable circumstances pursuant to the Business and Professions Code that would necessitate filing of a Record of Survey. Mount Vernon Avenue 118. A Three foot () additional R/W dedication is required. 119. Completion of the parkway improvement along the entire frontage of Mount Vernon Avenue is required including the Handicap Ramp at the corner of Mount Vernon Avenue and City Center Court prior to issuance of Certificate of Occupancy. 120. Required Submittal for Final Engineering Phase Geotechnical Investigation Onsite Improvement Plan (to include precise grading plan, erosion control plan, onsite water & sewer, and onsite storm drain system, onsite signing & striping). Pad Certifications prepared by a licensed Civil Engineer registered in the State of California shall be submitted and approved prior to issuance of building permits. Upon completion of onsite construction, an onsite asbuilt plan shall be submitted and approved for final project acceptance. Drainage Study Offsite Street Improvement Plan Upon completion of offsite improvements, offsite as-built plans shall be submitted and approved for final project acceptance. Final Water Quality Management Plan (WQMP) Structural Calculations (for non-standard retaining walls if applicable) Attachment: Attachment 1 - Exhibit B - Conditions for PC Resolution for SA23-23 (Spring Hills Family Dentistry Site and Architectural Review Exhibit B Resolution No. 2024-02 Page 15 of 18 Packet Pg. 65 B.1.c BUILDING AND SAFETY CONDITIONS: 121. A building permit shall be required for the proposed development in compliance to the currently adopted California Building Codes and City of Grand Terrace Municipal Code. 122. Prior to the issuance of a building permit, the applicant shall pay any associated Development Impact Fees to the City; this also includes school fees, Public Works fees, and outside agency fees including but not limited to Colton Wastewater, Riverside-Highland Water Co., and utilities. Copies of receipts shall be provided to Building & Safety prior to permit issuance. 123. All construction projects shall comply with the National Pollutant Discharge Elimination Systems (NPDES), and the San Bernardino County MS-4 Storm Water Permit. 124. Prior to building and demolition permit issuance, the applicant shall establish haul services for construction waste material with Burrtec to facilitate the recycling of all recoverable/recyclable material as required per the California Green Code and City of Grand Terrace Municipal Code. No self-hauling is allowed. 125. The Applicant shall submit a completed Construction & Demolition (C&D) Waste Diversion Program / Waste Management Plan (WMP) form along with the required C&D deposit based per square footage of construction and/or demolition prior to building permit issuance. 126. Prior to issuance of any demolition permits, notification shall be made to the South Coast Air Quality Management District (SCAQMD) of proposed demolition work. A copy of the SCAQMD approved application shall be provided to the Building Division. In addition, an asbestos and lead-free certification shall be provided to the Building Division before permit issuance. The presence of any asbestos and/or lead within the building must be abated by a licensed abatement contractor before demolition. 127. California Green Building Standards Code. 128. Designated parking for electric vehicle (EV) stations shall be marked. Based on the number of proposed parking spaces, there shall be a minimum of (2) reserved spaces, with one of the spaces being van accessible. 129. Underground installation of conduit and other components to easily accommodate future installation of electric vehicle chargers shall be made. 130. Separate permits will be required for the following items: trash enclosure, main building, decorative block walls, PV solar, canopy, signs (wall mounted & Attachment: Attachment 1 - Exhibit B - Conditions for PC Resolution for SA23-23 (Spring Hills Family Dentistry Site and Architectural Review Exhibit B Resolution No. 2024-02 Page 16 of 18 Packet Pg. 66 B.1.c monument), electric vehicle chargers, and any other items requiring a permit per California Building Code (CBC) 105.1. 131. Trash enclosure shall be accessible from the building entrance. 132. An accessible path of travel shall be provided connecting the public sidewalk to the building entrance. 133. Drains located inside the trash enclosure area can be connected to the public sewer system per City of Colton Wastewater standards. 134. Prior to issuance of a Certificate of Occupancy, a roof mounted photovoltaic (PV) solar and energy storage system shall be operational and fully functional before final inspection. 135. An automated external defibrillator (AED), bleeding control kit, and Narcan supply kit shall be installed. Minimum one of each in every floor. REFUSE CONDITIONS: 136. hauler (Burrtec Waste Industries, Inc.) to coordinate the preparation and implementation of a Construction Waste Management Plan prior to the issuance of grading permit. 137. The trash enclosure shall be designed to accommodate at least two standard 4- cubic yard commercial bins for trash and mixed recyclables. 138. All future trash enclosures shall be roofed and match the future buildings in color and finish. 139. Any design modifications to the project design, enclosure specifications or location, review and approval by Burrtec. CITY OF COLTON PUBLIC WORKS DEPARTMENT WATER & WASTEWATER DIVISION CONDITIONS: 140. All construction shall conform to the current edition of the specifications for public works construction (Green Book), and the current standards and specifications of the City of Colton Water/Wastewater Department. 141. All water and wastewater capacity fees must be paid prior to obtaining the Certificate of Occupancy. Additional capacity fees may apply if the actual discharge exceeds the estimated flow established during initial approval. Service will be terminated if the fees are not paid. Attachment: Attachment 1 - Exhibit B - Conditions for PC Resolution for SA23-23 (Spring Hills Family Dentistry Site and Architectural Review Exhibit B Resolution No. 2024-02 Page 17 of 18 Packet Pg. 67 B.1.c 142. Submit utility plans for both onsite and offsite utilities prepared by a registered engineer with a scale on the plans - 143. The development shall meet all of the requirements as set forth by the water/wastewater department for water, sewer and pre-treatment facilities. 144. Applicant shall levy all connection fees and charges at rate scheduled by City Council at the time of payment. Attachment: Attachment 1 - Exhibit B - Conditions for PC Resolution for SA23-23 (Spring Hills Family Dentistry Site and Architectural Review Exhibit B Resolution No. 2024-02 Page 18 of 18 Packet Pg. 68 B.1.d EXHIBIT C FINDINGS OF APPROVAL FOR SITE AND ARCHITECTURAL REVIEW 23-23 Vacant 1.67-acre Property Located At The Corner Of Mount Vernon And City Center Court (APNs: 1178-01-109,1178-01-110, and 1178-01-111) 12,406 Square Foot Spring Hills Family Dentistry Building As required by Section 18.63.060 of the Grand Terrace Municipal Code, approval of Site and Architectural Review 23-23 for approval to construct a new 12,406 square foot, two story dental office building on a vacant 1.67-acre site, located at the northeast corner of Mount Vernon and City Center Court (APNs:1178-01-109, 110 & 111) as depicted on the comprehensive architectural design package included EXHBIT A Conditions of Approval for Site and Architectural Review 23-23, which are included EXHIBIT BResolution and incorporated herein by this reference, is based on the following findings: 1. Finding: The proposed use is consistent with the intent of the Grand Terrace Municipal Code and General Plan. Facts in Support of Finding: The Project site is zoned The Barton Road Specific Plan (BRSP) Village Commercial (VC) Planning Area 2 (P.A.2.). The Project site is identified as General Commercial on the General Plan Land Use Map. therefore permitted by right within Village Commercial, Planning Area 2, of the Barton Road Specific Plan. 2. Finding: The location and configuration of all structures associated with this Project are visually harmonious with this site and surrounding sites and structures, as they do not m other structures and/or public areas and are in scale with the townscape and natural landscape of the area. Facts in Support of Finding: The new 12,406-square foot dental office building maintains a setback more than fifty (50) feet from its nearest adjacent commercial neighboring properties to its north. This setback provides much needed space and privacy for the new building as the neighboring properties are situated within a couple feet of the property line. Site improvements include, but are not limited to, landscaping, parking lot, parking lot lighting, streetlights, roofed trash enclosure, generator enclosure, solar canopy for cars, bicycle rack, and art area. There are no scenic views at the subject property that have historic of cultural significance and the building and proposed site improvements are consistent and in scale with the Barton Road Specific Plan. The Barton Road Specific Plan is the primary land use corridor is commercial with some office and residential uses along Barton Road and it center. City Hall is located near the eastern end of the corridor. Attachment: Attachment 1 - Exhibit C - Findings for PC Resolution for SA23-23 (Spring Hills Family Dentistry Site and Architectural Review 23- Exhibit C Resolution No. 2024-02 Page 1 of 3 Packet Pg. 69 B.1.d 3. Finding: The architectural design of structures, their materials and colors are visually harmonious with surrounding development, natural landforms, are functional for the proposed Project and are consistent with this code. Facts in Support of Finding: The new building was designed by State Licensed Lampert Dias Architects, Inc. to fit will within the commercial ambiance of the neighborhood. The building design is highly articulated, with a stepping-back desk facing City Center Court and a tower element at the corner, as well as stone trim along the entire base of the building. Care was given to the windows which are also articulated with pop-out trim surrounds on all sides of the building making it visually harmonious and maintains the . 4. Finding: The plan for landscaping and open spaces provides a functional and visually pleasing setting for the structures on this site and is harmonious with the natural landscape of the area and nearby developments. Facts in Support of Finding: functional and incorporates a public plaza with benches and artwork along Mount Vernon Avenue. The public art piece will be brought back to the Planning Commission/Site and Architectural Review Board for approval prior to final occupancy of the building. The Applicant had a comprehensive landscape plan prepared for the development by Mission Landscape Architecture that utilized the landscape guidelines found within the Barton Road Specific Plan. The colorful landscaping is visually pleasing with three (3) foot high shrub screen and trees to soften the project by obscuring the parking lot from Mount Vernon Avenue and City Center Court. Overall, the landscape plan created by Mission Landscape Architecture established a unified planting with a plant schedule that includes evergreen trees and is harmonious with the natural landscape of the area and nearby developments. The surrounding developments have trees and shrubs and groundcover that will be continued on the Project site so there is no longer a gap of fallow dirt land but a modern dental office building with water efficient landscaping. The Applicant has requested an incentive bonus for reduced landscape coverage percentage not to exceed 20% of the required standard for landscaping to provide double the amount of parking on site from the Municipal Code minimum requirement to ensure that no patrons or staff overflow onto adjacent public rights-of- consistent with the BRSP as the Project is proposes to consolidate 3 lots into 1 and in doing so would result in a reduction in access points in contrast to if each lot was developed individually. The percentage to double the amount of parking on site is offset by quality and quantity of landscaping and is identified on the landscape plans. 5. Finding: There is no indiscriminate clearing of property, destruction of trees or natural vegetation or the excessive and unsightly grading of hillsides, thus the natural beauty of the city, its setting and natural landforms are preserved. Facts in Support of Finding: The 1.67-acre site for the Project is currently vacant. It is bordered by the San Bernadino County Fire Station 23 to the east, commercial buildings to the north, Mt. Vernon Avenue to the west, and City Center Court to the south. The 1.67- acre site has no trees and given the site relatively flat with a slight grade that slopes from east to west, there will be no unsightly grading of hillsides. The Applicant does maintain the vacant property with routine weed abatement on the property as necessary, so no indiscriminate clearing of property would be required. There are no natural landforms on Attachment: Attachment 1 - Exhibit C - Findings for PC Resolution for SA23-23 (Spring Hills Family Dentistry Site and Architectural Review 23- Exhibit C Resolution No. 2024-02 Page 2 of 3 Packet Pg. 70 B.1.d relocated to City Hall grounds. 6. Finding: The design and location of all signs associated with this project are consistent with the scale and character of the building to which they are attached or otherwise associated with and are consistent with this code. Facts in Support of Finding: Signs are not approved as a part of Site and Architecture Review 23-23. Rather, Condition of Approval No. 44 requires that prior to establishing any new signs, the Applicant shall submit an application with fee payment, and receive approval, for a sign permit from the Planning Division (pursuant to Chapter 18.80 of the Grand Terrace Municipal Code) and a building permit for construction of the signs from the Building Division, as applicable. 7. Finding: Conditions of Approval for this project necessary to secure the purposes of this code and general plan are made a part of this approval. Facts in Support of Finding: The City has placed a total of one-hundred and forty-four (144) Conditions of Approval upon Site and Architecture Review 23-23 to secure the purpose of the Municipal Code and General Plan, incorporated herein by reference. Conditions 1 through 80 are from through 97 are from the San Bernadino County Fire Department; and, Conditions 98 135 are fr are from Burrtec Waste Industries, Inc.; and, Conditions 140 through 144 are from the City of Colton Public Works Department Water and Wastewater Division. The City of Grand Terrace wishes to protect and preserve the quality of the Barton Road Specific Plan area of the City, as well as the quality of life throughout the City, through effective land use and planning through the application of all 144 Conditions of Approval to the Project. Attachment: Attachment 1 - Exhibit C - Findings for PC Resolution for SA23-23 (Spring Hills Family Dentistry Site and Architectural Review 23- Exhibit C Resolution No. 2024-02 Page 3 of 3 Packet Pg. 71 FYUFSJPS!JMMVNJOBUFE!TJHOBHF TVCNJUUBM!2 KBOVBSZ!2:-!3135 THE FOLLOWING DRAWINGS, SPECIFICATIONS, IDEAS, DESIGNS, CONCEPTS AND ARRANGEMENTS CONTAINED HEREIN ARE AND SHALL REMAIN THE PROPERTY OF COASTAL SIGNS PLUS AND ITS ENTITIES. NO PART OF THIS DOCUMENT MAY BE COPIED, REPRODUCED OR DISTRIBUTED IN CONNECTION WITH THIS OR ANY OTHER WORK OR PROJECT FOR WHICH IT HAS BEEN PREPARED WITHOUT WRITTEN CONSENT FROM COASTAL SIGNS PLUS. IF, UPON SUBMITTAL TO A PROPOSED CLIENT, THESE DRAWINGS ARE NOT USED, THEY SHALL BE RETURNED TO COASTAL SIGNS PLUS IN THEIR ENTIRETY. FURTHERMORE, NO PART OF THESE DRAWINGS, OR THEIR LIKENESSES, SHALL BE REPRODUCED IN ANY FORM, INCLUDING PHOTOGRAPHS, DIGITAL IMAGES AND/OR SIGNAGE, WITHOUT EXPRESS WRITTEN CONSENT FROM COASTAL SIGNS PLUS. THE FOLLOWING DRAWINGS, SPECIFICATIONS, IDEAS, DESIGNS, CONCEPTS AND ARRANGEMENTS CONTAINED HEREIN ARE AND SHALL REMAIN THE PROPERTY OF COASTAL SIGNS PLUS AND ITS ENTITIES. NO PART OF THIS DOCUMENT MAY BE COPIED, REPRODUCED OR DISTRIBUTED IN CONNECTION WITH THIS OR ANY OTHER WORK OR PROJECT FOR WHICH IT HAS BEEN PREPARED WITHOUT WRITTEN CONSENT FROM COASTAL SIGNS PLUS. IF, UPON SUBMITTAL TO A PROPOSED CLIENT, THESE DRAWINGS ARE NOT USED, THEY SHALL BE RETURNED TO COASTAL SIGNS PLUS IN THEIR ENTIRETY. FURTHERMORE, NO PART OF THESE DRAWINGS, OR THEIR LIKENESSES, SHALL BE REPRODUCED IN ANY FORM, INCLUDING PHOTOGRAPHS, DIGITAL IMAGES AND/OR SIGNAGE, WITHOUT EXPRESS WRITTEN CONSENT FROM COASTAL SIGNS PLUS. THE FOLLOWING DRAWINGS, SPECIFICATIONS, IDEAS, DESIGNS, CONCEPTS AND ARRANGEMENTS CONTAINED HEREIN ARE AND SHALL REMAIN THE PROPERTY OF COASTAL SIGNS PLUS AND ITS ENTITIES. NO PART OF THIS DOCUMENT MAY BE COPIED, REPRODUCED OR DISTRIBUTED IN CONNECTION WITH THIS OR ANY OTHER WORK OR PROJECT FOR WHICH IT HAS BEEN PREPARED WITHOUT WRITTEN CONSENT FROM COASTAL SIGNS PLUS. IF, UPON SUBMITTAL TO A PROPOSED CLIENT, THESE DRAWINGS ARE NOT USED, THEY SHALL BE RETURNED TO COASTAL SIGNS PLUS IN THEIR ENTIRETY. FURTHERMORE, NO PART OF THESE DRAWINGS, OR THEIR LIKENESSES, SHALL BE REPRODUCED IN ANY FORM, INCLUDING PHOTOGRAPHS, DIGITAL IMAGES AND/OR SIGNAGE, WITHOUT EXPRESS WRITTEN CONSENT FROM COASTAL SIGNS PLUS. THE FOLLOWING DRAWINGS, SPECIFICATIONS, IDEAS, DESIGNS, CONCEPTS AND ARRANGEMENTS CONTAINED HEREIN ARE AND SHALL REMAIN THE PROPERTY OF COASTAL SIGNS PLUS AND ITS ENTITIES. NO PART OF THIS DOCUMENT MAY BE COPIED, REPRODUCED OR DISTRIBUTED IN CONNECTION WITH THIS OR ANY OTHER WORK OR PROJECT FOR WHICH IT HAS BEEN PREPARED WITHOUT WRITTEN CONSENT FROM COASTAL SIGNS PLUS. IF, UPON SUBMITTAL TO A PROPOSED CLIENT, THESE DRAWINGS ARE NOT USED, THEY SHALL BE RETURNED TO COASTAL SIGNS PLUS IN THEIR ENTIRETY. FURTHERMORE, NO PART OF THESE DRAWINGS, OR THEIR LIKENESSES, SHALL BE REPRODUCED IN ANY FORM, INCLUDING PHOTOGRAPHS, DIGITAL IMAGES AND/OR SIGNAGE, WITHOUT EXPRESS WRITTEN CONSENT FROM COASTAL SIGNS PLUS. THE FOLLOWING DRAWINGS, SPECIFICATIONS, IDEAS, DESIGNS, CONCEPTS AND ARRANGEMENTS CONTAINED HEREIN ARE AND SHALL REMAIN THE PROPERTY OF COASTAL SIGNS PLUS AND ITS ENTITIES. NO PART OF THIS DOCUMENT MAY BE COPIED, REPRODUCED OR DISTRIBUTED IN CONNECTION WITH THIS OR ANY OTHER WORK OR PROJECT FOR WHICH IT HAS BEEN PREPARED WITHOUT WRITTEN CONSENT FROM COASTAL SIGNS PLUS. IF, UPON SUBMITTAL TO A PROPOSED CLIENT, THESE DRAWINGS ARE NOT USED, THEY SHALL BE RETURNED TO COASTAL SIGNS PLUS IN THEIR ENTIRETY. FURTHERMORE, NO PART OF THESE DRAWINGS, OR THEIR LIKENESSES, SHALL BE REPRODUCED IN ANY FORM, INCLUDING PHOTOGRAPHS, DIGITAL IMAGES AND/OR SIGNAGE, WITHOUT EXPRESS WRITTEN CONSENT FROM COASTAL SIGNS PLUS. THE FOLLOWING DRAWINGS, SPECIFICATIONS, IDEAS, DESIGNS, CONCEPTS AND ARRANGEMENTS CONTAINED HEREIN ARE AND SHALL REMAIN THE PROPERTY OF COASTAL SIGNS PLUS AND ITS ENTITIES. NO PART OF THIS DOCUMENT MAY BE COPIED, REPRODUCED OR DISTRIBUTED IN CONNECTION WITH THIS OR ANY OTHER WORK OR PROJECT FOR WHICH IT HAS BEEN PREPARED WITHOUT WRITTEN CONSENT FROM COASTAL SIGNS PLUS. IF, UPON SUBMITTAL TO A PROPOSED CLIENT, THESE DRAWINGS ARE NOT USED, THEY SHALL BE RETURNED TO COASTAL SIGNS PLUS IN THEIR ENTIRETY. FURTHERMORE, NO PART OF THESE DRAWINGS, OR THEIR LIKENESSES, SHALL BE REPRODUCED IN ANY FORM, INCLUDING PHOTOGRAPHS, DIGITAL IMAGES AND/OR SIGNAGE, WITHOUT EXPRESS WRITTEN CONSENT FROM COASTAL SIGNS PLUS. THE FOLLOWING DRAWINGS, SPECIFICATIONS, IDEAS, DESIGNS, CONCEPTS AND ARRANGEMENTS CONTAINED HEREIN ARE AND SHALL REMAIN THE PROPERTY OF COASTAL SIGNS PLUS AND ITS ENTITIES. NO PART OF THIS DOCUMENT MAY BE COPIED, REPRODUCED OR DISTRIBUTED IN CONNECTION WITH THIS OR ANY OTHER WORK OR PROJECT FOR WHICH IT HAS BEEN PREPARED WITHOUT WRITTEN CONSENT FROM COASTAL SIGNS PLUS. IF, UPON SUBMITTAL TO A PROPOSED CLIENT, THESE DRAWINGS ARE NOT USED, THEY SHALL BE RETURNED TO COASTAL SIGNS PLUS IN THEIR ENTIRETY. FURTHERMORE, NO PART OF THESE DRAWINGS, OR THEIR LIKENESSES, SHALL BE REPRODUCED IN ANY FORM, INCLUDING PHOTOGRAPHS, DIGITAL IMAGES AND/OR SIGNAGE, WITHOUT EXPRESS WRITTEN CONSENT FROM COASTAL SIGNS PLUS. THE FOLLOWING DRAWINGS, SPECIFICATIONS, IDEAS, DESIGNS, CONCEPTS AND ARRANGEMENTS CONTAINED HEREIN ARE AND SHALL REMAIN THE PROPERTY OF COASTAL SIGNS PLUS AND ITS ENTITIES. NO PART OF THIS DOCUMENT MAY BE COPIED, REPRODUCED OR DISTRIBUTED IN CONNECTION WITH THIS OR ANY OTHER WORK OR PROJECT FOR WHICH IT HAS BEEN PREPARED WITHOUT WRITTEN CONSENT FROM COASTAL SIGNS PLUS. IF, UPON SUBMITTAL TO A PROPOSED CLIENT, THESE DRAWINGS ARE NOT USED, THEY SHALL BE RETURNED TO COASTAL SIGNS PLUS IN THEIR ENTIRETY. FURTHERMORE, NO PART OF THESE DRAWINGS, OR THEIR LIKENESSES, SHALL BE REPRODUCED IN ANY FORM, INCLUDING PHOTOGRAPHS, DIGITAL IMAGES AND/OR SIGNAGE, WITHOUT EXPRESS WRITTEN CONSENT FROM COASTAL SIGNS PLUS. B.1.f 12,406 square foot dental Attachment: Attachment 3 - LETTER OF INTENT (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 81 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 82 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 83 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 84 B.1.g Water Quality Management Plan (WQMP) Grand Terrace DentistGrand Terrace, CA Table of Contents Section 1 Discretionary Permits ......................................................................................... 1-1 Section 2 Project Description ............................................................................................... 2-1 2.1 Project Information ........................................................................................................ 2-1 2.2 Property Ownership / Management ............................................................................ 2-2 2.3 Potential Stormwater Pollutants .................................................................................. 2-3 2.4 Water Quality Credits ............... 2-4 Section 3 Site and Watershed Description ......................................................................... 3-1 Section 4 Best Management Practices ................................................................................ 4-1 4.1 Source Control BMP ....................................................................................................... 4-1 4.1.1 Pollution Prevention .................................................................................................... 4-1 4.1.2 Preventative LID Site Design Practices ..................................................................... 4-8 4.2 Project Performance Criteria ........................................................................................ 4-9 4.3 Project Conformance Analysis ...................................................................................... 4-11 4.3.1 Site Design Hydrologic Source Control BMP ........................................................... 4-13 4.3.2 Infiltration BMP .......................................................................................................... 4-15 4.3.3 Harvest and Use BMP ................................................................................................. 4-17 4.3.4 Biotreatment BMP ...................................................................................................... 4.18 4.3.5 Conformance Summary .............................................................................................. 4-19 4.3.6 Hydromodification Control BMP .............................................................................. 4-20 4.4 Alternative Compliance Plan (if applicable) ............................................................... 4-21 Section 5 Inspection & Maintenance Responsibility Post Construction BMPs ................. 5-1 Section 6 Site Plan and Drainage Plan ................................................................................ 6-1 6.1. Site Plan and Drainage Plan ......................................................................................... 6-1 6.2 Electronic Data Submittal ............................................................................................. 6-1 Forms Form 1-1 Project Information ................................................................................................................. 1-1 Form 2.1-1 Description of Proposed Project ......................................................................................... 2-1 Form 2.2-1 Property Ownership/Management .................................................................................... 2-2 Form 2.3-1 Pollutants of Concern .......................................................................................................... 2-3 Form 2.4-1 Water Quality Credits ......................................................................................................... 2-4 Form 3-1 Site Location and Hydrologic Features ................................................................................. 3-1 Form 3-2 Hydrologic Characteristics .................................................................................................... 3-2 Form 3-3 Watershed Description .......................................................................................................... 3-3 Form 4.1-1 Non-Structural Source Control BMP ................................................................................. 4-2 Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Form 4.1-2 Structural Source Control BMP .......................................................................................... 4-5 Form 4.1-3 Site Design Practices Checklist .......................................................................................... 4-8 Form 4.2-1 LID BMP Performance Criteria for Design Capture Volume .......................................... 4-9 Form 4.2-2 Summary of HCOC Assessment ........................................................................................ 4-10 Form 4.3-1 Infiltration BMP Feasibility ................................................................................................ 4-12 Contents ii Packet Pg. 85 B.1.g Water Quality Management Plan (WQMP) Grand Terrace DentistGrand Terrace, CA Form 4.3-2 Site Design Hydrologic Source Control BMP ................................................................... 4-13 Form 4.3-3 Infiltration LID BMP ........................................................................................................... 4-16 Form 4.3-9 Conformance Summary and Alternative Compliance Volume Estimate ...................... 4-19 Form 5-1 BMP Inspection and Maintenance ........................................................................................ 5-1 Attachments Attachment A: Education Materials Attachment B: Hydrologic Soil Group Map HCOC Exempt Area Map NOAA Rainfall Data Attachment C: BMP Calculations & Details Attachment D: Infiltration Soils Report Attachment E: Operation & Maintenance (OI&M) Plan BMP Maintenance Agreement Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Contents iii Packet Pg. 86 B.1.g Water Quality Management Plan (WQMP) Grand Terrace DentistGrand Terrace, CA Section 1 Discretionary Permit(s) Form 1-1 Project Information Project Name Grand Terrace Dentist Project Owner Contact Name: Lalisa Yaowarattana Mailing 22737 Barton Road, #12 E-mail Telephone: (909)825-3000 Address: Grand Terrace, CA 92313 Address: P.M. Book 1178, Page 01 Tract/Parcel Map Number(s): Permit/Application Number(s): TBD M.B. 77/55-56 Additional Information / None Comments: Summary of Conceptual WQMP conditions: N/A (Attach complete copy if previously submitted and approved.) Description of Project: The proposed redevelopment project is considered a Priority Project per the San Bernardino Project Categories List. The Project area is in the City of Grand Terrace. As shown on the WQMP site plan in Section 6, the project site is approximately 1.653 acres. Refer to Section 6.1 for the WQMP site plan. The site plan shows the location of existing new office building, paved surfaces, landscaping, and proposed LID and treatment control BMPs. The existing site is an undeveloped lot with seasonal vegetation across the site. The studied area for existing condition is 1.65 acres and consists of one drainage area where runoff surface flows southwesterly to the existing curb and gutter in the public right-of-way toward an existing drain inlet. The existing project site consists of 0% impervious and 100% pervious areas. Proposed site improvements include a new office building, impervious paving areas, storm drain system, and underground infiltration area. A hydrodynamic separator (AquaSwirl unit by AquaShield) will be provided for stormwater pre-treatment prior to discharging to the new underground infiltration system (StormTank Modules) for onsite retention. Outdoor activities for the project are expected to include driving vehicles, parking, walking, trash pickup, maintenance and activities otherwise related to the conduct of an office building. No outdoor material storage is proposed for the project and will be prohibited within the project site. Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) (continued next page) 1-1 Packet Pg. 87 B.1.g Water Quality Management Plan (WQMP) Grand Terrace DentistGrand Terrace, CA Typical outdoor activities are limited to: Vehicular and pedestrian traffic within the parking lot and drive aisles Maintenance of the proposed improvements including: Common Area Landscape Management Common Area Litter Control Street Sweeping for Parking Lots Underground Infiltration & Pre-Treatment System Common Area Catch Basin Inspection Common area and commercial trash can be anticipated to be produced daily by customers, guests, employees, and contractors. The trash will be collected and disposed of at the designated trash enclosure. The trash will then be removed by the private waste management company on a weekly basis for proper disposal to a central trash disposal facility offsite. Employee and contractor trash will be collected by and properly carried offsite and disposed of properly by each employee and contractor. A maintenance company hired by the development will collect and properly dispose of off-site any litter within the common areas. The project site will not receive run-on from outside property lines. Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) 1-2 Packet Pg. 88 B.1.g Water Quality Management Plan (WQMP) Grand Terrace DentistGrand Terrace, CA Section 2 Project Description 2.1 Project Information This section of the WQMP should provide the information listed below. The information provided for Conceptual/ Preliminary WQMP should give sufficient detail to identify the major proposed site design and LID BMPs and other anticipated water quality features that impact site planning. Final Project WQMP must specifically identify all BMP incorporated into the final site design and provide other detailed information as described herein. The purpose of this information is to help determine the applicable development category, pollutants of concern, watershed description, and long-term maintenance responsibilities for the project, and any applicable water quality credits. This information will be used in conjunction with the information in Section 3, Site Description, to establish the performance criteria and to select the LID BMP or other BMP for the project or other alternative programs that the project will participate in, which are described in Section 4. Form 2.1-1 Description of Proposed Project 1 Development Category (Select all that apply): Significant re-development New development Automotive repair Restaurants (with SIC involving the addition or involving the creation of shops with standard code 5812) where the land 22 replacement of 5,000 ft or 10,000 ft or more of industrial classification (SIC) area of development is 2 more of impervious surface on impervious surface collectively codes 5013, 5014, 5541, 5,000 ftor more an already developed site over entire site 7532- 7534, 7536-7539 2 2 Hillside developments of Developments of 2,500 ft Parking lots of 5,000 ft Retail gasoline outlets 2 2 5,000 ftor more which are of impervious surface or more or more exposed to storm that are either 5,000 ftor located on areas with known adjacent to (within 200 ft) or water more, or have a projected erosive soil conditions or discharging directly into average daily traffic of 100 where the natural slope is environmentally sensitive or more vehicles per day 25 percent or more areas or waterbodies listed on the CWA Section 303(d) list of impaired waters. Non-Priority / Non-Category Project May require source control LID BMPs and other LIP requirements. Please consult with local jurisdiction on specific requirements. 2 3 4 2 72,000 (1.653 ac) N/A 8011 Project Area (ft): Number of Dwelling Units: SIC Code: 5 Is Project going to be phased? Yes No If yes, ensure that the WQMP evaluates each phase as a distinct DA, requiring LID BMPs to address runoff at time of completion. 6 Does Project include roads? Yes No If yes, ensure that applicable requirements for transportation projects are addressed (see Appendix A of TGD for WQMP) Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) 2-3 Packet Pg. 89 B.1.g Water Quality Management Plan (WQMP) Grand Terrace DentistGrand Terrace, CA 2.2 Property Ownership/Management Describe the ownership/management of all portions of the project and site. State whether any infrastructure will transfer to public agencies (City, County, Caltrans, etc.) after project completion. State if a homeowners or property owners association will be formed and be responsible for the long-term maintenance of project stormwater facilities. Describe any lot-level stormwater features that will be the responsibility of individual property owners. Form 2.2-1 Property Ownership/Management Describe property ownership/management responsible for long-term maintenance of WQMP stormwater facilities: Responsibility Statements: The Project Owner, Lalisa Yaowarattana, shall be responsible for the long-term funding and implementation of all Covenants, Conditions and Restrictions (CC&Rs). The Project Owner, Lalisa Yaowarattana, shall be the entity responsible for all site improvements. Project site infrastructure will not transfer to public agencies after project completion. The Project Owner, Firestation Properties, LLC., shall be responsible for the maintenance of all project drainage facilities, including storm drain lines, catch basins, hydrodynamic separator, and the infiltration system. Owner: Lalisa Yaowarattana 22737 Barton Road, #12 Grand Terrace, CA 92313 Owner Contact: Walter Kurfurst Spring Hills Family Dentistry (909) 825-3000 Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) 2-4 Packet Pg. 90 B.1.g Water Quality Management Plan (WQMP) Grand Terrace DentistGrand Terrace, CA 2.3 Potential Stormwater Pollutants Determine and describe expected stormwater pollutants of concern based on land uses and site activities (refer to Table 3-3 in the TGD for WQMP). Form 2.3-1 Pollutants of Concern Please check: Additional Information and Comments: Pollutant E = Expected, or Commercial Development, Parking Lots N = Not Expected Potential sources of pathogens from the project include Pathogens (Bacterial / Virus) E N landscaping areas. Potential sources include sewage, sediment, or generated by Nutrients - Phosphorous E N organic litter. Potential sources of nitrogen from the project include fertilizer Nutrients - Nitrogen E N Noxious Aquatic Plants E N Roads, parking lots, and roofs are expected to be common Sediment E N sources of sediment. Potential sources of trace metals include motor vehicles and Metals E N construction materials. Oil and Grease E N Potential sources of oil and grease include motor vehicles. Sources include common litter and biodegradable organic Trash/Debris E N matter such as leaves and grass cuttings from landscaped areas. Potential sources of pesticides include fertilizer, bug-spray, or Pesticides / Herbicides E N Potential sources of organic compounds onsite include the Organic Compounds E N maintenance activities. Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) 2-5 Packet Pg. 91 B.1.g Water Quality Management Plan (WQMP) Grand Terrace DentistGrand Terrace, CA 2.4 Water Quality Credits A water quality credit program is applicable for certain types of development projects if it is not feasible to meet the requirements for on-site LID. Proponents for eligible projects, as described below, can apply for water quality credits that would reduce project obligations for selecting and sizing other treatment BMP or participating in other alternative compliance programs. Refer to Section 6.2 in the TGD for WQMP to determine if water quality credits are applicable for the project. Form 2.4-1 Water Quality Credits 1 Project Types that Qualify for Water Quality Credits: Select all that apply Higher density Mixed use development, Brownfield Redevelopment projects that development projects (combination of residential, redevelopment reduce the overall impervious commercial, industrial, office, (redevelop real property Vertical density \[20%\] footprint of the project site. institutional, or other land uses complicated by presence \[Credit = % impervious reduced\] 7 units/ acre \[5%\] which incorporate design principles or potential of hazardous that demonstrate environmental contaminants) \[25%\] benefits not realized through single use projects) \[20%\] Redevelopment projects in Transit-oriented In-fill projects (conversion of Live-Work established historic district, developments (mixed use empty lots & other underused developments (variety of historic preservation area, or residential or commercial spaces < 5 acres, substantially developments designed similar significant core city center area designed to maximize surrounded by urban land uses, into to support residential and areas \[10%\] access to public more beneficially used spaces, such vocational needs) \[20%\] transportation) \[20%\] as residential or commercial areas) \[10%\] 2 Total Credit % N/A (Total all credit percentages up to a maximum allowable credit of 50 percent) Water Quality Credit Eligibilities are not applied to this project. The proposed hydrodynamic Description of Water Quality separator for pre-treatment and infiltration system for onsite retention will fulfill the full LID and Credit Eligibility (if applicable) treatment control requirements. Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) 2-6 Packet Pg. 92 B.1.g Water Quality Management Plan (WQMP) Grand Terrace DentistGrand Terrace, CA Section 3 Site and Watershed Description Describe the project site conditions that will facilitate the selection of BMP through an analysis of the physical conditions and limitations of the site and its receiving waters. Identify distinct drainage areas (DA) that collect flow from a portion of the site and describe how runoff from each DA (and sub-watershed DMAs) is conveyed to the site outlet(s). Refer to Section 3.2 in the TGD for WQMP. The form below is provided as an example. Then complete Forms 3.2 and 3.3 for each DA on the project site. If the project has more than one drainage area for stormwater management, then complete additional versions of these forms for each DA / outlet. Form 3-1 Site Location and Hydrologic Features Site coordinates (take GPS measurement Latitude: 34.032867 Longitude: -117.312879 Thomas Bros Map: at approximate center of site) 1 San Bernardino County climatic region: Valley Mountain 2 Does the site have more than one drainage area (DA): Yes No If no, proceed to Form 3-2. If yes, then use this form to show a conceptual schematic describing DMAs and hydrologic feature connecting DMAs to the site outlet(s). An example is provided below that can be modified for proposed project or a drawing clearly showing DMA and flow routing may be attached DA-A, DMA-A Hydrodynamic Separator for Pre-Treatment Underground Infiltration System Overflow to City SD System on Mount Vernon Ave Conveyance Briefly describe on-site drainage features to convey runoff that is not retained within a DMA Runoff surface flows to localized onsite inlets that discharge to the hydrodynamic separators for pre- treatment. Runoff then flows to the underground infiltration system. Runoff will be retained onsite DA-A, DMA-A Outlet 1 via 6025.5infiltration BMP. System overflows discharge to the existing curb inlet on Mount Vernon Avenue and discharge to the City storm drain system flowing north along Mount Vernon Avenue. Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) 3-1 Packet Pg. 93 B.1.g Water Quality Management Plan (WQMP) Grand Terrace DentistGrand Terrace, CA Form 3-2 Existing Hydrologic Characteristics for Drainage Area 1 -watershed DMA, DA-A, DMA-A provide the following characteristics 2 72,000 ft 1 2 DMA drainage area (ft) (1.653 ac) 2 2 2 0 ft Existing site impervious area (ft) 3 Antecedent moisture condition For desert areas, use AMC II http://www.sbcounty.gov/dpw/floodcontrol/pdf/2 0100412_map.pdf 4 Hydrologic soil group Refer to Watershed B Mapping Tool http://permitrack.sbcounty.gov/wap/ 5 439 ft Longest flowpath length (ft) 6 0.028 Longest flowpath slope (ft/ft) 7 Current land cover type(s) Select from Fig C-3 Undeveloped of Hydrology Manual 8 Pre-developed pervious area condition: Based on the extent of wet season vegetated cover Fair good >75%; Fair 50-75%; Poor <50% Attach photos of site to support rating Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) 3-2 Packet Pg. 94 B.1.g Water Quality Management Plan (WQMP) Grand Terrace DentistGrand Terrace Form 3-3 Watershed Description for Drainage Area 1 Receiving waters City SD Line (flows north on Mount Vernon Avenue) Refer to Watershed Mapping Tool - Santa Ana River (Reach 4) Santa Ana River (Reach 3) http://permitrack.sbcounty.gov/wap/ Santa Ana River (Reach 2) Santa Ana River (Reach 1) Pacific Ocean Applicable TMDLs Santa Ana River (Reach 3): Pathogens, Nitrate Refer to Local Implementation Plan 303(d) listed impairments Refer to Local Implementation Plan and Watershed Mapping Tool Santa Ana River (Reach 4): Indicator Bacteria http://permitrack.sbcounty.gov/wap/ and State Santa Ana River (Reach 3): Copper, Indicator Bacteria, Lead Water Resources Control Board website http://www.waterboards.ca.gov/santaana/water_iss ues/programs/tmdl/index.shtml Environmentally Sensitive Areas (ESA) Based on the information provided by the Watershed Mapping Tool, there are Refer to Watershed Mapping Tool no ESAs identified for the project site. http://permitrack.sbcounty.gov/wap/ Santa Ana River (Reach 3) Unlined Downstream Water Bodies Santa Ana River (Reach 2) Refer to Watershed Mapping Tool http://permitrack.sbcounty.gov/wap/ Santa Ana River (Reach 1) Yes Complete Hydrologic Conditions of Concern (HCOC) Assessment. Include Forms 4.2-2 through Form 4.2-5 and Hydromodification BMP Form 4.3-10 in submittal Hydrologic Conditions of Concern No HCOC Exempt Area (H12) Yes Attach verification of regional BMP evaluation criteria in WAP More Effective than On-site LID Remaining Capacity for Project DCV Watershedbased BMP: Upstream of any Water of the US Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Included in a RWQCB approved WAP? Operational at Project Completion Long-Term Maintenance Plan No 3-3 Packet Pg. 95 B.1.g Water Quality Management Plan (WQMP) Grand Terrace DentistGrand Terrace, CA Section 4 Best Management Practices (BMP) 4.1 Source Control BMP 4.1.1 Pollution Prevention Non-structural and structural source control BMP are required to be incorporated into all new development and significant redevelopment projects. Form 4.1-1 and 4.1-2 are used to describe specific source control BMPs used in the WQMP or to explain why a certain BMP is not applicable. Table 7-3 of the TGD for WQMP provides a list of applicable source control BMP for projects with specific types of potential pollutant sources or activities. The source control BMP in this table must be implemented for projects with these specific types of potential pollutant sources or activities. The preparers of this WQMP have reviewed the source control BMP requirements for new development and significant redevelopment projects. The preparers have also reviewed the specific BMP required for project as specified in Forms 4.1-1 and 4.1-2. All applicable non-structural and structural source control BMP shall be implemented in the project. Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) 4-1 Packet Pg. 96 Water Quality Management Plan (WQMP) Grand Terrace Dentist Grand Terrace, CA Form 4.1-1 Non-Structural Source Control BMPs Check One Describe BMP Implementation OR, Identifier Name Not if not applicable, state reason Included Applicable Owner will establish requirements for the implementation of an awareness program that informs employees, staff and contractors of the impacts of dumping oil, paints, solvents or other potentially harmful chemicals into the storm drain, as well as the prope and management of fertilizers, pesticides and herbicides in landscaping areas. Owner and staff should also stress to all tenants, employees and contractors that there are Education of Property Owners, Tenants N1 prohibited activities on site and they must be adhered to at all times. The pro and Occupants on Stormwater BMPs activities are mentioned, but not limited to the following Activity Restrictions (N2). Additionally, education materials, including, but not limited to those included in Attachment A of this WQMP, shall be provided to all staff/employees/contracto Additional educational materials are available from the County Stormwater Program and can be downloaded at http://www.sbcountystormwater.org The following prohibitions and restrictions shall be enforced by the Owner: Discharge of fertilizers, pesticides, or animal wastes to public Right storm drains are prohibited. Blowing sweeping of debris (leaf litter, grass clippings, litter, etc.) into public storm drains is prohibited. N2 Activity Restrictions Trash receptacles shall have a watertight lid and be covered or sheltered by a roof. Discharge of paint or masonry wastes to public ROW or storm drains are prohibited. Discharges of grease waste to public ROW or storm drains is prohibited. Do not use detergents or other chemical additives when washing concrete sidewalks or building exteriors. ALL non-stormwater discharges are prohibited Ongoing maintenance shall be consistent with City and County water conservation guidelines. Any fertilizer and/or pesticide usage shall be consistent with City and County shall be applied by only qualified and certified personnel. Owner shall be the mechanism to ensure compliance with N3. Landscaping areas shall be inspected for signs of erosion, N3 Landscape Management BMPs vegetation health and mulch depth regularly with landscaping maintenance activit at minimum once per month. Identified eroded areas, decaying or dying vegetation and bare areas shall be repaired, replaced and/or mulched as soon as possible to minimize exposed sediment and potential for erosion. Fertilizers and pesticide use shall comply with NPDES Permit. 4-2 Water Quality Management Plan (WQMP) Grand Terrace Dentist Grand Terrace, CA Form 4.1-1 Non-Structural Source Control BMPs Check One Describe BMP Implementation OR, Identifier Name Not if not applicable, state reason Included Applicable Owner shall be responsible for the inspection and maintenance of structural BMPs within their boundaries. All records shall be maintained for a minimum of five years after N4 BMP Maintenance generation. All BMPs must be checked for standing water 48 hours after any rainstorm Standing water after 48 hours is an indication that BMP maintenance is needed. Title 22 CCR Compliance N5 Proposed facility will not generate waste subject to Title 22 CCR compliance. (How development will comply) Project to comply with City of Chino Hill (CHMC) N6 Local Water Quality Ordinances 13.16. Provide labeling of all storm drain inlets and catch basins with prohibitive language to discourage illegal dumping. N7 Spill Contingency Plan Project site will not store or create hazardous waste. N8 Underground Storage Tank Compliance None proposed for this project. Hazardous Materials Disclosure Proposed project will not store or generate hazardous materials subject to agency N9 Compliance requirements. N10 Uniform Fire Code Implementation Proposed project does not propose to store toxic or highly toxic compressed gases. Owner will designate a maintenance firm that will be responsible for initiating a program to ensure that the parking lots and driveway of the project are swept and cleaned on a regular basis. Responsibilities include daily inspection of trash receptacles t lids are closed, pick-up of any excess trash on the ground, emptying of trash receptacles, N11 Litter/Debris Control Program noting of disposal violations by users, and reporting such violations to Owner for investigation. These activities will become the responsibility of the maintenance firm. The maintenance firm will be responsible for the implementation of trash management programs and litter control procedures in the common areas aimed at reducing pollution of drainage water. 4-3 Water Quality Management Plan (WQMP) Grand Terrace Dentist Grand Terrace, CA Form 4.1-1 Non-Structural Source Control BMPs Check One Describe BMP Implementation OR, Identifier Name Not if not applicable, state reason Included Applicable Owner shall train staff and employees on activity restrictions (N2) and maintenance N12 Employee Training requirements (N4) as outlined in Education of Property Owners, Tenants and Occupants on Stormwater BMPs (N1). N13 Housekeeping of Loading Docks Loading docks are not proposed for this project. All onsite catch basins and area drains will be maintained by the Owner and sub contractors. At a minimum, the above items will be inspected twice per year, prior to st the start of the rainy season (October 1) and midway through the rainy season to N14 Catch Basin Inspection Program ensure the proper function of these devices. All maintenance/inspection records shall be kept on file for annual reporting. All devices shall be checked for standing water 48 hours after every rainstorm. Evidence of standing water will require the device to be cleaned or replaced. Owner will designate a maintenance firm that will be responsible for ensuring that sweeping of the open areas should occur on a weekly basis (in some cases daily is Vacuum Sweeping of Private Streets N15 necessary to remove trash and debris and windblown sediment). The vacuum sweeping and Parking Lots of the site should occur monthly at a minimum or more frequently as needed. The procedure will be intensified around October 1st of each year prior to the rainy season. Other Non-structural Measures for N16 Project is private development. Public Agency Projects The project will comply with the current NPDES Stormwater Permit R8 Comply with all other applicable NPDES N17 permits amendments and/or subsequent NPDES Stormwater Permits. 4-4 Water Quality Management Plan (WQMP) Grand Terrace Dentist Grand Terrace, CA Form 4.1-2 Structural Source Control BMPs Check One Describe BMP Implementation OR, Identifier Name Not If not applicable, state reason Included Applicable All storm drain inlets and catch basins, constructed or modified, within the Project S1 Provide storm drain system stencilling and signage language) which prohibit illegal dumping shall be posted legibly adjacent to each (CASQA New Development BMP Handbook SD-13) (SD-13) catch basin. Legibility of stencils and signs shall be maintained by the Owner/Tenant. Design and construct outdoor material storage areas to reduce pollution introduction S2 Project does not propose outdoor storage areas for this development. (CASQA New Development BMP Handbook SD-34) Use efficient irrigation systems & landscape Efficient irrigation devices will be installed in landscaped areas to minimize runoff design, water conservation, smart controllers, and of excessive irrigation water from landscaped areas. As a part of the design of all S4 source control common area landscape irrigation, including, but not limited to, such provisions as (SD-12) (Stateside Model Landscape Ordinance: CASQA water sensors, programmable irrigation times (for short cycles), etc., will be used. Such common areas will be maintained by the Owner/Tenant. New Development BMP Handbook SD-12) Finish grade of landscaped areas at a minimum of Landscaping areas will be depressed to retain some runoff from infiltration and S5 evapotranspiration. See WQMP Site Plan exhibit. 1-2 below top of curb, sidewalk, or pavement Protect slopes and channels and provide energy The existing project site does not have steep or unstable slopes, or any natural S6 dissipation channels to protect. (CASQA New Development BMP Handbook SD-10) Covered dock areas S7 Dock areas are not proposed for this project. (CASQA New Development BMP Handbook SD-31) Form 4.1-2 Structural Source Control BMPs Check One Describe BMP Implementation OR, Identifier Name Not If not applicable, state reason Included Applicable Covered maintenance bays with spill containment S8 plans Maintenance bays are not proposed for this project. (CASQA New Development BMP Handbook SD-31) 4-5 Water Quality Management Plan (WQMP) Grand Terrace Dentist Grand Terrace, CA Vehicle wash areas with spill containment plans S9 Car wash areas are not proposed for this project. (CASQA New Development BMP Handbook SD-33) S10 Covered outdoor processing areas Outdoor processing areas are not proposed for this project. (CASQA New Development BMP Handbook SD-36) (SD-36) Equipment wash areas with spill containment plans S11 Equipment wash areas are not proposed for this project. (CASQA New Development BMP Handbook SD-33) S12 Fueling areas Fueling areas are not proposed for this project. (CASQA New Development BMP Handbook SD-30) (SD-30) Hillside landscaping S13 Hillside landscaping is not proposed for this project. (CASQA New Development BMP Handbook SD-10) S14 Wash water control for food preparation areas Food preparation areas are not proposed for this project. Community car wash racks S15 Community car wash racks are not proposed for this project. (CASQA New Development BMP Handbook SD-33) 4-6 B.1.g Water Quality Management Plan (WQMP) Grand Terrace DentistGrand Terrace, CA 4.1.2 Preventative LID Site Design Practices Site design practices associated with new LID requirements in the MS4 Permit should be considered in the earliest phases of a project. Preventative site design practices can result in smaller DCV for LID BMP and hydromodification control BMP by reducing runoff generation. Describe site design and drainage plan including: A narrative of site design practices utilized or rationale for not using practices A narrative of how site plan incorporates preventive site design practices Include an attached Site Plan layout which shows how preventative site design practices are included in WQMP Refer to Section 5.2 of the TGD for WQMP for more details. Form 4.1-3 Preventative LID Site Design Practices Checklist Site Design Practices If yes, explain how preventative site design practice is addressed in project site plan. If no, other LID BMPs must be selected to meet targets Minimize impervious areas: Yes No Explanation: Project will minimize impervious area by constructing sidewalks, parking stalls, and drive aisles to minimum widths allowable. \[SD1\] Maximize natural infiltration capacity: Yes No Explanation: Project will surface flow to localized onsite inlets and discharge to underground infiltration system for onsite retention. \[SD2\] Preserve existing drainage patterns and time of concentration: Yes No Explanation: Existing drainage patterns to be altered to collect and detain 100% of the onsite stormwater flows. Disconnect impervious areas: Yes No Explanation: Roof downspouts and parking lot inlets will be diverted to the infiltration chamber for onsite retention. Protect existing vegetation and sensitive areas: Yes No Explanation: Existing project site does not include vegetated or sensitive areas to protect. Re-vegetate disturbed areas: Yes No Explanation: \[SD4\] Minimize unnecessary compaction in stormwater retention/infiltration basin/trench areas: Yes No Explanation: Unnecessary compaction will be minimized in areas where stormwater treatment devices will be installed. \[SD5\] Utilize vegetated drainage swales in place of underground piping or imperviously lined swales: Yes No Explanation: Project does not propose vegetated drainage swales in place of underground piping or impervious swales. Stake off areas that will be used for landscaping to minimize compaction during construction : Yes No Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Explanation: Contractor to stake off all proposed landscape areas to minimize compaction during construction. See WQMP Site Plan exhibit for proposed landscaped areas. \[SD7\] 4-7 Packet Pg. 102 B.1.g Water Quality Management Plan (WQMP) Grand Terrace DentistGrand Terrace, CA 4.2 Project Performance Criteria The purpose of this section of the Project WQMP is to establish targets for post-development hydrology based on performance criteria specified in the MS4 Permit. These targets include runoff volume for water quality control (referred to as LID design capture volume), and runoff volume, time of concentration, and peak runoff for protection of any downstream waterbody segments with a HCOC. Methods applied in the following forms include: For LID BMP Design Capture Volume (DCV), the San Bernardino County Stormwater Program requires use of the P method (MS4 Permit Section XI.D.6a.ii) Form 4.2-1 6 For HCOC pre- and post-development hydrologic calculation, the San Bernardino County Stormwater Program requires the use of the Rational Method (San Bernardino County Hydrology Manual Section D). Forms 4.2-2 through Form 4.2-5 calculate hydrologic variables including runoff volume, time of concentration, and peak runoff from the project site pre- and post-development using the Hydrology Manual 2 Rational Method approach. For projects greater than 640 acres (1.0 mi), the Rational Method and these forms should not be used. For such projects, the Unit Hydrograph Method (San Bernardino County Hydrology Manual Section E) shall be applied for hydrologic calculations for HCOC performance criteria. \[NOT APPLICABLE\] Refer to Section 4 in the TGD for WQMP for detailed guidance and instructions. Form 4.2-1 LID BMP Performance Criteria for Design Capture Volume (DA-1) 12 3 2 Project area DA 1 (ft): Imperviousness after applying preventative Runoff Coefficient (Rc): 0.622 ^3^2 2 R = 0.858(Imp%)-0.78(Imp%)+0.774(Imp%)+0.04 72,000 ft (1.653 ac) site design practices (Imp%): 82% c 4 Determine 1-hour rainfall depth for a 2-year return period P (in): 0.459 http://hdsc.nws.noaa.gov/hdsc/pfds/sa/sca_pfds.html 2yr-1hr 5 Compute P, Mean 6-hr Precipitation (inches): 0.680 6 P = Item 4 *C, where C is a function of site climatic region specified in Form 3-1 Item 1 (Valley = 1.4807; Mountain = 1.909; Desert = 1.2371) 611 6 Drawdown Rate Use 48 hours as the default condition. Selection and use of the 24 hour drawdown time condition is subject to approval 24-hrs by the local jurisdiction. The necessary BMP footprint is a function of drawdown time. While shorter drawdown times 48-hrs reduce the performance criteria for LID BMP design capture volume, the depth of water that can be stored is also reduced. 7 3 3 Compute design capture volume, DCV (ft): 4,978 ft (0.114 ac-ft) DCV = 1/12 * \[Item 1* Item 3 *Item 5 * C\], where C is a function of drawdown rate (24-hr = 1.582; 48-hr = 1.963) 22 Compute separate DCV for each outlet from the project site per schematic drawn in Form 3-1 Item 2 Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) 4-8 Packet Pg. 103 B.1.g Water Quality Management Plan (WQMP) Grand Terrace DentistGrand Terrace, CA Form 4.2-2 Summary of HCOC Assessment (DA-1) Does project have the potential to cause or contribute to an HCOC in a downstream channel: Yes No Go to: http://permitrack.sbcounty.gov/wap/ -3 through 4.2-5 and insert results below (Forms 4.2-3 through 4.2-5 may be replaced by computer software analysis based on the San Bernardino County Hydrology Manual) 3 Condition Runoff Volume (ft) Time of Concentration (min) Peak Runoff (cfs) 123 --- --- --- Pre-developed Form 4.2-3 Item 12 Form 4.2-4 Item 13 Form 4.2-5 Item 10 456 --- --- --- Post-developed Form 4.2-3 Item 13 Form 4.2-4 Item 14 Form 4.2-5 Item 14 789 --- --- --- Difference Item 4 Item 1 Item 2 Item 5 Item 6 Item 3 101112 Difference ---% ---% ---% (as % of pre-developed) Item 7 / Item 1 Item 8 / Item 2 Item 9 / Item 3 Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) 4-9 Packet Pg. 104 B.1.g Water Quality Management Plan (WQMP) Grand Terrace DentistGrand Terrace, CA Form 4.2-3 HCOC Assessment for Runoff Volume (DA-1) Weighted Curve Number Determination for: DMA A DMA B DMA C DMA D DMA E DMA F DMA G DMA H Pre-developed DA 1a Land Cover type 2a Hydrologic Soil Group (HSG) 2 3a DMA Area, ft sum of areas of DMA should equal area of DA 4 a Curve Number (CN) use Items 1 and 2 to select the appropriate CN from Appendix C-2 of the TGD for WQMP Weighted Curve Number Determination for: DMA A DMA B DMA C DMA D DMA E DMA F DMA G DMA H Post-developed DA 1b Land Cover type 2b Hydrologic Soil Group (HSG) 2 3b DMA Area, ft sum of areas of DMA should equal area of DA 4b Curve Number (CN) use Items 5 and 6 to select the appropriate CN from Appendix C-2 of the TGD for WQMP 7 Pre-developed soil storage capacity, S (in): 9 Initial abstraction, I (in): a 5 Pre-Developed area-weighted CN: S = (1000 / Item 5) - 10 I = 0.2 * Item 7 a 8 Post-developed soil storage capacity, S (in): 10 Initial abstraction, I (in): a 6 Post-Developed area-weighted CN: S = (1000 / Item 6) - 10 I = 0.2 * Item 8 a 11 Precipitation for 2 yr, 24 hr storm (in): Go to: http://hdsc.nws.noaa.gov/hdsc/pfds/sa/sca_pfds.html 3 12 Pre-developed Volume (ft): V =(1 / 12) * (Item sum of Item 3) * \[(Item 11 Item 9)^2 / ((Item 11 Item 9 + Item 7) pre 3 13 Post-developed Volume (ft): V =(1 / 12) * (Item sum of Item 3) * \[(Item 11 Item 10)^2 / ((Item 11 Item 10 + Item 8) pre 3 3 14 Volume Reduction needed to meet HCOC Requirement, (ft): 0 ft V = (Item 13 * 0.95) Item 12 HCOC Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) 4-10 Packet Pg. 105 B.1.g Water Quality Management Plan (WQMP) Grand Terrace DentistGrand Terrace, CA Form 4.2-4 HCOC Assessment for Time of Concentration (DA-1) Compute time of concentration for pre and post developed conditions for each DA (For projects using the Hydrology Manual complete the form below) Pre-developed DA1 Post-developed DA1 Variables DMA A DMA B DMA C DMA D DMA A DMA B DMA C DMA D 1 Length of flowpath (ft) Use Form 3-2 Item 5 for pre-developed condition 2 Change in elevation (ft) 3 Slope (ft/ft), S = Item 2 / Item 1 o 4 Land cover 5 Initial DMA Time of Concentration (min) Appendix C-1 of the TGD for WQMP 6 Length of conveyance from DMA outlet to project site outlet (ft) May be zero if DMA outlet is at project site outlet 7 2 Cross-sectional area of channel (ft) 8 Wetted perimeter of channel (ft) 9 channel (n) 10 Channel flow velocity (ft/sec) ^0.67 V = (1.49 / Item 9) * (Item 7/Item 8) fps ^0.5 * (Item 3) 11 Travel time to outlet (min) T = Item 6 / (Item 10 * 60) t 12 Total time of concentration (min) T = Item 5 + Item 11 c 13 Pre-developed time of concentration (min): Minimum of Item 12 pre-developed DMA 14 Post-developed time of concentration (min): Minimum of Item 12 post-developed DMA 15 Additional time of concentration needed to meet HCOC requirement (min): T = (Item 13 * 0.95) Item 14 C-HCOC Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) 4-11 Packet Pg. 106 B.1.g Water Quality Management Plan (WQMP) Grand Terrace DentistGrand Terrace, CA Form 4.2-5 HCOC Assessment for Peak Runoff (DA-1) Compute peak runoff for pre- and post-developed conditions Pre-developed DA to Post-developed DA to Project Outlet Project Outlet Variables DMA A DMA B DMA C DMA A DMA B DMA C 1 Rainfall Intensity for storm duration equal to time of concentration I = 10^(LOG Form 4.2-1 Item 4 - 0.6 LOG Form 4.2-4 Item 5 /60) peak 2 Drainage Area of each DMA (Acres) For DMA with outlet at project site outlet, include upstream DMA (Using example schematic in Form 3-1, DMA A will include drainage from DMA C) 3 Ratio of pervious area to total area For DMA with outlet at project site outlet, include upstream DMA (Using example schematic in Form 3-1, DMA A will include drainage from DMA C) 4 Pervious area infiltration rate (in/hr) Use pervious area CN and antecedent moisture condition with Appendix C-3 of the TGD for WQMP 5 Maximum loss rate (in/hr) F = Item 3 * Item 4 m Use area-weighted F from DMA with outlet at project site outlet, include upstream m DMA (Using example schematic in Form 3-1, DMA A will include drainage from DMA C) 6 Peak Flow from DMA (cfs) Q =Item 2 * 0.9 * (Item 1 - Item 5) p 7 DMA A Time of concentration adjustment factor for other DMA to site discharge point DMA B Form 4.2-4 Item 12 DMA / Other DMA upstream of site discharge DMA C point (If ratio is greater than 1.0, then use maximum value of 1.0) 8 9 10 Pre-developed Q at T for DMA A: Pre-developed Q at T for DMA B: Pre-developed Q at T for DMA C: pcpcpc Q = Item 6 + \[Item 6* (Item 1 - Item Q = Item 6 + \[Item 6* (Item 1 - Item Q = Item 6 + \[Item 6* (Item 1 - Item pDMAADMAB DMAApDMABDMAA DMABpDMACDMAA DMAC 5)/(Item 1 - Item 5)* Item 7\] + 5)/(Item 1 - Item 5)* Item 7\] + 5)/(Item 1 - Item 5)* Item 7\] + DMABDMABDMABDMAA/2DMAADMAADMAADMAB/1DMAADMAADMAADMAC/1 \[Item 6* (Item 1 - Item 5)/(Item 1 - \[Item 6* (Item 1 - Item 5)/(Item 1 - \[Item 6* (Item 1 - Item 5)/(Item 1 DMAC DMAADMACDMACDMAC DMABDMACDMACDMAB DMACDMABDMAB Item 5)* Item 7\] Item 5)* Item 7\] - Item 5)* Item 7\] DMACDMAA/3DMACDMAB/3DMABDMAC/2 10 Peak runoff from pre-developed condition confluence analysis (cfs): Maximum of Item 8, 9, and 10 (including additional forms as needed) 13 Post-developed Q at T for DMA C: 11 12 pc Post-developed Q at T for DMA A: Post-developed Q at T for DMA B: pcpc Same as Item 10 for post-developed Same as Item 8 for post-developed values Same as Item 9 for post-developed values values Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) 14 Peak runoff from post-developed condition confluence analysis (cfs): Maximum of Item 11, 12, and 13 (including additional forms as needed) 15 Peak runoff reduction needed to meet HCOC Requirement (cfs): 0 cfs Q = (Item 14 * 0.95) Item 10 p-HCOC 4-12 Packet Pg. 107 B.1.g Water Quality Management Plan (WQMP) Grand Terrace DentistGrand Terrace, CA 4.3 Project Conformance Analysis Complete the following forms for each project site DA to document that the proposed LID BMPs conform to the project DCV developed to meet performance criteria specified in the MS4 Permit (WQMP Template Section 4.2). For the LID DCV, the forms are ordered according to hierarchy of BMP selection as required by the MS4 Permit (see Section 5.3.1 in the TGD for WQMP). The forms compute the following for on-site LID BMP: Site Design and Hydrologic Source Controls (Form 4.3-2) Retention and Infiltration (Form 4.3-3) Harvested and Use (Form 4.3-4) or Biotreatment (Form 4.3-5). At the end of each form, additional fields facilitate the determination of the extent of mitigation provided by the specific BMP category, allowing for use of the next category of BMP in the hierarchy, if necessary. The first step in the analysis, using Section 5.3.2.1 of the TGD for WQMP, is to complete Forms 4.3-1 and 4.3-3) to determine if retention and infiltration BMPs are infeasible for the project. For each feasibility criterion in Form 4.3-1, if the answer is used to make the determination of infeasibility. Next, complete Forms 4.3-2 and 4.3-4 to determine the feasibility of applicable HSC and harvest and use BMPs, and, if their implementation is feasible, the extent of mitigation of the DCV. If no site constraints exist that would limit the type of BMP to be implemented in a DA, evaluate the use of combinations of LID BMPs, including all applicable HSC BMPs to maximize on-site retention of the DCV. If no combination of BMP can mitigate the entire DCV, implement the single BMP type, or combination of BMP types, that maximizes on-site retention of the DCV within the minimum effective area. If the combination of LID HSC, retention and infiltration, and harvest and use BMPs are unable to mitigate the entire DCV, then biotreatment BMPs may be implemented by the project proponent. If biotreatment BMPs are used, then they must be sized to provide sufficient capacity for effective treatment of the remainder of the volume- based performance criteria that cannot be achieved with LID BMPs (TGD for WQMP Section 5.4.4.2). Under no circumstances shall any portion of the DCV be released from the site without effective mitigation and/or treatment. Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) 4-13 Packet Pg. 108 B.1.g Water Quality Management Plan (WQMP) Grand Terrace DentistGrand Terrace, CA Form 4.3-1 Infiltration BMP Feasibility (DA-1) Feasibility Criterion Complete evaluation for each DA on the Project Site 1 Would infiltration BMP pose significant risk for groundwater related concerns? Yes No Refer to Section 5.3.2.1 of the TGD for WQMP If Yes, Provide basis: (attach) 2 Would installation of infiltration BMP significantly increase the risk of geotechnical hazards? Yes No (Yes, if the answer to any of the following questions is yes, as established by a geotechnical expert): The location is less than 50 feet away from slopes steeper than 15 percent The location is less than eight feet from building foundations or an alternative setback. A study certified by a geotechnical professional or an available watershed study determines that stormwater infiltration would result in significantly increased risks of geotechnical hazards. If Yes, Provide basis: (attach) 3 Would infiltration of runoff on a Project site violate downstream water rights? Yes No If Yes, Provide basis: (attach) 4 Is proposed infiltration facility located on hydrologic soil group (HSG) D soils or does the site geotechnical investigation indicate presence of soil characteristics, which support categorization as D soils? Yes No If Yes, Provide basis: (attach) 5 Is the design infiltration rate, after accounting for safety factor of 2.0, below proposed facility less than 0.3 in/hr (accounting for soil amendments)? Yes No If Yes, Provide basis: (attach) 6 Would on-site infiltration or reduction of runoff over pre-developed conditions be partially or fully inconsistent with watershed management strategies as defined in the WAP, or impair beneficial uses? Yes No See Section 3.5 of the TGD for WQMP and WAP If Yes, Provide basis: (attach) 7 : Yes No If yes, infiltration of any volume is not feasible onsite. Proceed to Form 4.3-4, Harvest and Use BMP. If no, then proceed to Item 8 below. 8 Any answer from Item 4 through Item 6 Yes No If yes, infiltration is permissible but is not required to be considered. Proceed to Form 4.3-2, Hydrologic Source Control BMP. If no, then proceed to Item 9, below. 9 All answers to Item 1 through Item 6 o: Infiltration of the full DCV is potentially feasible, LID infiltration BMP must be designed to infiltrate the full DCV to the MEP. Proceed to Form 4.3-2, Hydrologic Source Control BMP. Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) 4-14 Packet Pg. 109 B.1.g Water Quality Management Plan (WQMP) Grand Terrace DentistGrand Terrace, CA 4.3.1 Site Design Hydrologic Source Control BMP Section XI.E. of the Permit emphasizes the use of LID preventative measures; and the use of LID HSC BMPs reduces the portion of the DCV that must be addressed in downstream BMPs. Therefore, all applicable HSC shall be provided except where they are mutually exclusive with each other, or with other BMPs. Mutual exclusivity may result from overlapping BMP footprints such that either would be potentially feasible by itself, but both could not be implemented. Please note that while there are no numeric standards regarding the use of HSC, if a project cannot feasibly meet BMP sizing requirements or cannot fully address HCOCs, feasibility of all applicable HSC must be part of demonstrating that the BMP system has been designed to retain the maximum feasible portion of the DCV. Complete Form 4.3-2 to identify and calculate estimated retention volume from implementing site design HSC BMP. Refer to Section 5.4.1 in the TGD for more detailed guidance. Form 4.3-2 Site Design Hydrologic Source Control BMPs (DA-1) 1 Implementation of Impervious Area Dispersion BMP (i.e. routing runoff from impervious to pervious areas), excluding impervious areas planned for routing to on-lot infiltration BMP: Yes No If yes, complete Items 2-5; If no, proceed to Item 6 2 2 Total impervious area draining to pervious area (ft) 3 Ratio of pervious area receiving runoff to impervious area 4 Retention volume achieved from impervious area dispersion 3 (ft) V = Item2 * Item 3 * (0.5/12), assuming retention of 0.5 inches of runoff 5 3 3 Sum of retention volume achieved from impervious area dispersion (ft): 0 ft V =Sum of Item 4 for all BMPs retention 6 Implementation of Localized On-lot Infiltration BMPs (e.g. on-lot rain gardens): Yes No If yes, complete Items 7-13 for aggregate of all on-lot infiltration BMP in each DA; If no, proceed to Item 14 7 2 Ponding surface area (ft) 8 Ponding depth (ft) 9 2 Surface area of amended soil/gravel (ft) 10 Average depth of amended soil/gravel (ft) 11 Average porosity of amended soil/gravel Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) 12 3 Retention volume achieved from on-lot infiltration (ft) V = (Item 7 *Item 8) + (Item 9 * Item 10 * Item 11) retention 13 3 3 Runoff volume retention from on-lot infiltration (ft): 0 ft V =Sum of Item 12 for all BMPs retention 4-15 Packet Pg. 110 B.1.g Water Quality Management Plan (WQMP) Grand Terrace DentistGrand Terrace, CA Form 4.3-2 Site Design Hydrologic Source Control BMPs (DA-1) Form 4.3-2 cont. Site Design Hydrologic Source Control BMPs (DA-1) 14 Implementation of evapotranspiration BMP (green, brown, or blue roofs): Yes No If yes, complete Items 15-20. If no, proceed to Item 21 15 2 Rooftop area planned for ET BMP (ft) 16 Average wet season ET demand (in/day) Use local values, typical ~ 0.1 17 3 Daily ET demand (ft/day) Item 15 * (Item 16 / 12) 18 Drawdown time (hrs) Copy Item 6 in Form 4.2-1 19 3 Retention Volume (ft) V = Item 17 * (Item 18 / 24) retention 20 3 3 Runoff volume retention from evapotranspiration BMPs (ft): 0 ft V =Sum of Item 19 for all BMPs retention 21 Implementation of Street Trees: Yes No If yes, complete Items 22-25. If no, proceed to Item 26 22 Number of Street Trees 23 2 Average canopy cover over impervious area (ft) 24 3 Runoff volume retention from street trees (ft) V = Item 22 * Item 23 * (0.05/12) assume runoff retention of 0.05 retention inches 25 3 3 Runoff volume retention from street tree BMPs (ft): 0 ft V = Sum of Item 24 for all BMPs retention 26 Implementation of residential rain barrel/cisterns: Yes No If yes, complete Items 27-29; If no, proceed to Item 30 27 Number of rain barrels/cisterns 28 3 Runoff volume retention from rain barrels/cisterns (ft) V = Item 27 * 3 retention 29 3 Runoff volume retention from residential rain barrels/Cisterns (ft3): 0 ft V =Sum of Item 28 for all BMPs retention Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) 30 3 Total Retention Volume from Site Design Hydrologic Source Control BMPs: 0 ft Sum of Items 5, 13, 20, 25 and 29 4-16 Packet Pg. 111 B.1.g Water Quality Management Plan (WQMP) Grand Terrace DentistGrand Terrace, CA 4.3.2 Infiltration BMPs Use Form 4.3-3 to compute on-site retention of runoff from proposed retention and infiltration BMPs. Volume retention estimates are sensitive to the percolation rate used, which determines the amount of runoff that can be infiltrated within the specified drawdown time. The infiltration safety factor reduces field measured percolation to account for potential inaccuracy associated with field measurements, declining BMP performance over time, and compaction during construction. Appendix D of the TGD for WQMP provides guidance on estimating an appropriate safety factor to use in Form 4.3-3. If site constraints limit the use of BMPs to a single type and implementation of retention and infiltration BMPs mitigate no more than 40% of the DCV, then they are considered infeasible and the Project Proponent may evaluate the effectiveness of BMPs lower in the LID hierarchy of use (Section 5.5.1 of the TGD for WQMP) If implementation of infiltrations BMPs is feasible as determined using Form 4.3-1, then LID infiltration BMPs shall be implemented to the MEP (section 4.1 of the TGD for WQMP). Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) 4-17 Packet Pg. 112 B.1.g Water Quality Management Plan (WQMP) Grand Terrace DentistGrand Terrace, CA Form 4.3-3 Infiltration LID BMP - including underground BMPs (DA-1) 1 3 3 Remaining LID DCV not met by site design HSC BMP (ft): 4,978 ft V = Form 4.2-1 Item 7 - Form 4.3-2 Item 30 unmet DMA A: BMP Type Use columns to the right to compute runoff volume retention Underground from proposed infiltration BMP (select BMP from Table 5-4 in TGD for WQMP) - Use additional forms for more BMPs Infiltration System 2 Infiltration rate of underlying soils (in/hr) See Section 5.4.2 and 1.18 in/hr Appendix D of the TGD for WQMP for minimum requirements for assessment methods 3 2.00 Infiltration safety factor See TGD Section 5.4.2 and Appendix D 4 0.59 in/hr Design percolation rate (in/hr) P = Item 2 / Item 3 design 5 48 hr Ponded water drawdown time (hr) Copy Item 6 in Form 4.2-1 6 Maximum ponding depth (ft) BMP specific, see Table 5-4 of the TGD n/a for WQMP for BMP design details 7 2.36 ft Ponding Depth (ft) d = Minimum of (1/12*Item 4*Item 5) or Item 6 BMP 8 2 Infiltrating surface area, SA (ft) the lesser of the area needed for BMP 2 1705 ft infiltration of full DCV or minimum space requirements from Table 5.7 of the TGD for WQMP 9 Amended soil depth, d (ft) Only included in certain BMP types, media 0 ft* see Table 5-4 in the TGD for WQMP for reference to BMP design details 10 0* Amended soil porosity 11 Gravel depth, d (ft) Only included in certain BMP types, see media 0.50 ft* Table 5-4 of the TGD for WQMP for BMP design details 12 0.40 Gravel porosity 13 3 hr Duration of storm as basin is filling (hrs) Typical ~ 3hrs 14 3 Above Ground Retention Volume (ft) V = Item 8 * \[Item7 + retention 3 0 ft* (Item 9 * Item 10) + (Item 11 * Item 12)+ (Item 13 * (Item 4 / 12))\] 15 3 Underground Retention Volume (ft) Volume determined using 3 5,003 ft* 16 3 Total Retention Volume from LID Infiltration BMPs: 5,003 ft (Sum of Items 14 and 15 for all infiltration BMP included in plan) 17 Fraction of DCV achieved with infiltration BMP: 100.8% Retention% = Item 16 / Form 4.2-1 Item 7 18 Is full LID DCV retained onsite with combination of hydrologic source control and LID retention/infiltration BMPs? Yes No Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) If yes, demonstrate conformance using Form 4.3-10; If no, then reduce Item 3, Factor of Safety to 2.0 and increase Item 8, Infiltrating Surface Area, such that the portion of the site area used for retention and infiltration BMPs equals or exceeds the minimum effective area thresholds (Table 5-7 of the TGD for WQMP) for the applicable category of development and repeat all above calculations. *Values for proprietary underground infiltration system. Retention and drawdown calculations are included in Attachment C. 4-18 Packet Pg. 113 B.1.g Water Quality Management Plan (WQMP) Grand Terrace DentistGrand Terrace, CA 4.3.3 Harvest and Use BMP Harvest and use BMP may be considered if the full LID DCV cannot be met by maximizing infiltration BMPs. Use Form 4.3-4 to compute on-site retention of runoff from proposed harvest and use BMPs. Volume retention estimates for harvest and use BMPs are sensitive to the on-site demand for captured stormwater. Since irrigation water demand is low in the wet season, when most rainfall events occur in San Bernardino County, the volume of water that can be used within a specified drawdown period is relatively low. The bottom portion of Form 4.3-4 facilitates the necessary computations to show infeasibility if a minimum incremental benefit of 40 percent of the LID DCV would not be achievable with MEP implementation of on-site harvest and use of stormwater (Section 5.5.4 of the TGD for WQMP). Form 4.3-4 Harvest and Use BMPs (DA-1) 1 3 3 Remaining LID DCV not met by site design HSC or infiltration BMP (ft): 0 ft V = Form 4.2-1 Item 7 - Form 4.3-2 Item 30 Form 4.3-3 Item 16 unmet BMP Type(s) Compute runoff volume retention from proposed harvest and use BMP (Select BMPs from Table 5-4 of the TGD for WQMP) - Use additional forms for more BMPs 2 Describe cistern or runoff detention facility 3 3 Storage volume for proposed detention type (ft) Volume of cistern 4 Landscaped area planned for use of harvested stormwater 2 (ft) 5 Average wet season daily irrigation demand (in/day) Use local values, typical ~ 0.1 in/day 6 3 Daily water demand (ft/day) Item 4 * (Item 5 / 12) 7 Drawdown time (hrs) Copy Item 6 from Form 4.2-1 8 3 Retention Volume (ft) V = Minimum of (Item 3) or (Item 6 * (Item 7 / 24)) retention 9 3 3 Total Retention Volume (ft) from Harvest and Use BMP: 0 ft Sum of Item 8 for all harvest and use BMP included in plan 10 Is the full DCV retained with a combination of LID HSC, retention and infiltration, and harvest & use BMPs? Yes No If yes, demonstrate conformance using Form 4.3-10. If no, then re-evaluate combinations of all LID BMP and optimize their implementation such that the maximum portion of the DCV is retained on-site (using a single BMP type or combination of BMP types). If the full DCV cannot be mitigated after this optimization process, proceed to Section 4.3.4. Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) 4-19 Packet Pg. 114 B.1.g Water Quality Management Plan (WQMP) Grand Terrace DentistGrand Terrace, CA 4.3.4 Biotreatment BMP Biotreatment BMPs may be considered if the full LID DCV cannot be met by maximizing retention and infiltration, and harvest and use BMPs. A key consideration when using biotreatment BMP is the effectiveness of the proposed BMP in addressing the pollutants of concern for the project (see Table 5-5 of the TGD for WQMP). Use Form 4.3-5 to summarize the potential for volume based and/or flow based biotreatment options to biotreat the remaining unmet LID DCV w. Biotreatment computations are included as follows: Use Form 4.3-6 to compute biotreatment in small volume based biotreatment BMP (e.g. bioretention w/underdrains); Use Form 4.3-7 to compute biotreatment in large volume based biotreatment BMP (e.g. constructed wetlands); Use Form 4.3-8 to compute sizing criteria for flow-based biotreatment BMP (e.g. bioswales) Form 4.3-5 Selection and Evaluation of Biotreatment BMP (DA-1) 1 Remaining LID DCV not met by site design HSC, List pollutants of concern Copy from Form 2.3-1. infiltration, or harvest and use BMP for potential 3 3 biotreatment (ft): 0 ft Form 4.2-1 Item 7 - Form 4.3-2 Item 30 Form 4.3-3 Item 16- Form 4.3-4 Item 9 Flow-based biotreatment Volume-based biotreatment 2 Use Forms 4.3-6 and 4.3-7 to compute treated volume Use Form 4.3-8 to compute treated volume Biotreatment BMP Selected (Select biotreatment BMP(s) Bioretention with underdrain necessary to ensure all pollutants of Planter box with underdrain Vegetated swale concern are addressed through Unit Constructed wetlands Vegetated filter strip Operations and Processes, described Wet extended detention Proprietary biotreatment in Table 5-5 of the TGD for WQMP) Dry extended detention 4 5 3 Compute remaining LID DCV with Remaining fraction of LID DCV for Volume biotreated in volume based 3 implementation of volume based biotreatment sizing flow based biotreatment BMP: biotreatment BMP (ft): Form 4.3- 3 6 Item 15 + Form 4.3-7 Item 13 BMP (ft): Item 1 Item 3 % Item 4 / Item 1 6 Flow-based biotreatment BMP capacity provided (cfs): Use Figure 5-2 of the TGD for WQMP to determine flow capacity required to ΀ȃ; Item 1) 7 Metrics for MEP determination: Provided a WQMP with the portion of site area used for suite of LID BMP equal to minimum thresholds in Table 5-7 of the TGD for WQMP for the proposed category of development: If maximized on-site retention BMPs is feasible for partial capture, then LID BMP implementation must be optimized to retain and infiltrate the maximum portion of the DCV possible within the prescribed minimum effective area. The remaining portion of the DCV shall then be mitigated using biotreatment BMP. Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) 4-20 Packet Pg. 115 B.1.g Water Quality Management Plan (WQMP) Grand Terrace DentistGrand Terrace, CA Form 4.3-6 Volume Based Biotreatment (DA-1) Bioretention and Planter Boxes with Underdrains Biotreatment BMP Type: Bioretention w/underdrain, planter box w/underdrain, other comparable BMP 1 Pollutants addressed with BMP List all pollutant of concern that will be effectively reduced through specific Unit Operations and Processes described in Table 5-5 of the TGD for WQMP 2 Amended soil infiltration rate Typical ~ 5.0 3 Amended soil infiltration safety factor Typical ~ 2.0 4 Amended soil design percolation rate (in/hr) P = Item 2 / design Item 3 5 Ponded water drawdown time (hr) Copy Item 6 from Form 4.2-1 6 Maximum ponding depth (ft) see Table 5-6 of the TGD for WQMP for reference to BMP design details 7 Ponding Depth (ft) d = Minimum of (1/12 * Item 4 * Item 5) or BMP Item 6 8 2 Amended soil surface area (ft) 9 Amended soil depth (ft) see Table 5-6 of the TGD for WQMP for reference to BMP design details 10 Amended soil porosity, n 11 Gravel depth (ft) see Table 5-6 of the TGD for WQMP for reference to BMP design details 12 Gravel porosity, n 13 Duration of storm as basin is filling (hrs) Typical ~ 3hrs 14 3 Biotreated Volume (ft) V = Item 8 * \[(Item 7/2) + (Item 9 biotreated * Item 10) +(Item 11 * Item 12)+ (Item 13 * (Item 4 / 12))\] 15 3 Total biotreated volume from bioretention and/or planter box with underdrains BMP: 0 ft Sum of Item 14 for all volume-based BMPs included in this form Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) 4-21 Packet Pg. 116 B.1.g Water Quality Management Plan (WQMP) Grand Terrace DentistGrand Terrace, CA Form 4.3-7 Volume Based Biotreatment (DA-1) Constructed Wetlands and Extended Detention Biotreatment BMP Type: Constructed wetlands, extended wet detention, extended dry detention, or other comparable proprietary BMP. If BMP includes multiple modules (e.g. forebay and main basin), provide separate estimates for storage and pollutants treated in each module. 1 Pollutants addressed with BMP forebay and basin List all pollutant of concern that will be effectively reduced through specific Unit Operations and Processes described in Table 5-5 of the TGD for WQMP 2 Bottom width (ft) 3 Bottom length (ft) 4 2 Bottom area (ft) A = Item 2 * Item 3 bottom 5 Side slope (ft/ft) 6 Depth of storage (ft) 7 2 Water surface area (ft) A =(Item 2 + (2 * Item 5 * Item 6)) * (Item 3 + (2 * Item 5 * Item 6)) surface 8 3 Storage volume (ft) For BMP with a forebay, ensure fraction of total storage is within ranges specified in BMP specific fact sheets, see Table 5-6 of the TGD for WQMP for reference to BMP design details V =Item 6 / 3 * \[Item 4 + Item 7 + (Item 4 * Item 7)^0.5\] 9 Drawdown Time (hrs) Copy Item 6 from Form 2.1 10 Outflow rate (cfs) Q = (Item 8 + Item 8) / (Item 9 * 3600) BMPforebaybasin 11 Duration of design storm event (hrs) 12 3 Biotreated Volume (ft) V = (Item 8 + Item 8) +( Item 10 * Item 11 * 3600) biotreatedforebaybasin 13 3 Total biotreated volume from constructed wetlands, extended dry detention, or extended wet detention : 0 ft (Sum of Item 12 for all BMP included in plan) Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) 4-22 Packet Pg. 117 B.1.g Water Quality Management Plan (WQMP) Grand Terrace DentistGrand Terrace, CA Form 4.3-8 Flow Based Biotreatment (DA-1) Biotreatment BMP Type: Vegetated swale, vegetated filter strip, or other comparable proprietary BMP 1 Pollutants addressed with BMP List all pollutant of concern that will be effectively reduced through specific Unit Operations and Processes described in TGD Table 5-5 2 Flow depth for water quality treatment (ft) BMP specific, see Table 5-6 of the TGD for WQMP for reference to BMP design details 3 Bed slope (ft/ft) BMP specific, see Table 5-6 of the TGD for WQMP for reference to BMP design details 4 Manning's roughness coefficient 5 Bottom width (ft) ^1.67^0.5 b = (Form 4.3-5 Item 6 * Item 4) / (1.49 * Item 2 * Item 3) w 6 Side Slope (ft/ft) BMP specific, see Table 5-6 of the TGD for WQMP for reference to BMP design details 7 2 Cross sectional area (ft) ^2 A = (Item 5 * Item 2) + (Item 6 * Item 2) 8 Water quality flow velocity (ft/sec) V = Form 4.3-5 Item 6 / Item 7 9 Hydraulic residence time (min) Pollutant specific, see Table 5-6 of the TGD for WQMP for reference to BMP design details 10 Length of flow based BMP (ft) L = Item 8 * Item 9 * 60 11 2 Water surface area at water quality flow depth (ft) SA = (Item 5 + (2 * Item 2 * Item 6)) * Item 10 top Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) 4-23 Packet Pg. 118 B.1.g Water Quality Management Plan (WQMP) Grand Terrace DentistGrand Terrace, CA 4.3.5 Conformance Summary Complete Form 4.3-9 to demonstrate how on-site LID DCV is met with proposed site design hydrologic source control, infiltration, harvest and use, and/or biotreatment BMP. The bottom line of the form is used to describe the basis for infeasibility determination for on-site LID BMP to achieve full LID DCV, and provides methods for computing remaining volume to be addressed in an alternative compliance plan. If the project has more than one outlet, then complete additional versions of this form for each outlet. Form 4.3-9 Conformance Summary and Alternative Compliance Volume Estimate (DA 1) 1 3 3 Total LID DCV for the Project DA-1 (ft): 5,003 ft Copy Item 7 in Form 4.2-1 2 3 3 On-site retention with site design hydrologic source control LID BMP (ft): 0 ft Copy Item 30 in Form 4.3-2 3 3 3 On-site retention with LID infiltration BMP (ft): 5,003 ft Copy Item 16 in Form 4.3-3 4 3 3 On-site retention with LID harvest and use BMP (ft): 0 ft Copy Item 9 in Form 4.3-4 5 3 3 On-site biotreatment with volume based biotreatment BMP (ft): 0 ft Copy Item 3 in Form 4.3-5 6 3 Flow capacity provided by flow based biotreatment BMP (cfs): 0 ft Copy Item 6 in Form 4.3-5 7 LID BMP performance criteria are achieved if answer to any of the following is es: Full retention of LID DCV with site design HSC, infiltration, or harvest and use BMP: Yes No If yes, sum of Items 2, 3, and 4 is greater than Item 1 Combination of on-site retention BMPs for a portion of the LID DCV and volume-based biotreatment BMP that address all pollutants of concern for the remaining LID DCV: Yes No If yes, a) sum of Items 2, 3, 4, and 5 is greater than Item 1, and Items 2, 3 and 4 are maximized; or b) Item 6 is greater than Form 4.3--5 Item 6 and Items 2, 3 and 4 are maximized On-site retention and infiltration is determined to be infeasible and biotreatment BMP provide biotreatment for all pollutants of concern for full LID DCV: Yes No If yes, Form 4.3-1 Items 7 and 8 were both checked yes 8 If the LID DCV is not achieved by any of these means, then the project may be allowed to develop an alternative compliance plan. Check box that describes the scenario which caused the need for alternative compliance: Combination of HSC, retention and infiltration, harvest and use, and biotreatment BMPs provide less than full LID DCV capture: Checked yes for Form 4.3-5 Item 7, Item 6 is zero, and sum of Items 2, 3, 4, and 5 is less than Item 1. If so, apply water quality credits and calculate volume for alternative compliance, V = (Item 1 Item 2 Item 3 Item 4 Item 5) * (100 - Form 2.4-1 Item 2)% alt An approved Watershed Action Plan (WAP) demonstrates that water quality and hydrologic impacts of urbanization are more effective when managed in at an off-site facility: Attach appropriate WAP section, including technical documentation, showing effectiveness comparisons for the project site and regional watershed Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) 4-24 Packet Pg. 119 B.1.g Water Quality Management Plan (WQMP) Grand Terrace DentistGrand Terrace, CA 4.3.6 Hydromodification Control BMP Use Form 4.3-10 to compute the remaining runoff volume retention, after LID BMP are implemented, needed to address HCOC, and the increase in time of concentration and decrease in peak runoff necessary to meet targets for protection of waterbodies with a potential HCOC. Describe hydromodification control BMP that address HCOC, which may include off-site BMP and/or in-stream controls. Section 5.6 of the TGD for WQMP provides additional details on selection and evaluation of hydromodification control BMP. Form 4.3-10 Hydromodification Control BMPs (DA-1) 2 On-site retention with site design hydrologic source control, infiltration, and 1 Volume reduction needed for HCOC 3 harvest and use LID BMP (ft): Sum of Form 4.3-9 Items 2, 3, and 4 Evaluate 3 3 performance criteria (ft): 0 ft option to increase implementation of on-site retention in Forms 4.3-2, 4.3-3, and 4.3-4 in (Form 4.2-2 Item 4 * 0.95) Form 4.2-2 Item 1 excess of LID DCV toward achieving HCOC volume reduction 4 Volume capture provided by incorporating additional on-site or off-site retention BMPs 3 Remaining volume for HCOC 3 (ft): Existing downstream BMP may be used to demonstrate additional volume capture (if 3 volume capture (ft): Item 1 so, attach to this WQMP a hydrologic analysis showing how the additional volume would be retained Item 2 during a 2-yr storm event for the regional watershed) 5 If Item 4 is less than Item 3, incorporate in-stream controls on downstream waterbody segment to prevent impacts due to hydromodification Attach in-stream control BMP selection and evaluation to this WQMP 6 Is Form 4.2-2 Item 11 less than or equal to 5%: Yes No If yes, HCOC performance criteria is achieved. If no, select one or more mitigation options below: Demonstrate increase in time of concentration achieved by proposed LID site design, LID BMP, and additional on-site or off-site retention BMP BMP upstream of a waterbody segment with a potential HCOC may be used to demonstrate increased time of concentration through hydrograph attenuation (if so, show that the hydraulic residence time provided in BMP for a 2-year storm event is equal or greater than the addition time of concentration requirement in Form 4.2-4 Item 15) Increase time of concentration by preserving pre-developed flow path and/or increase travel time by reducing slope and increasing cross-sectional area and roughness for proposed on-site conveyance facilities Incorporate appropriate in-stream controls for downstream waterbody segment to prevent impacts due to hydromodification, in a plan approved and signed by a licensed engineer in the State of California 7 Form 4.2-2 Item 12 less than or equal to 5%: Yes No If yes, HCOC performance criteria is achieved. If no, select one or more mitigation options below: Demonstrate reduction in peak runoff achieved by proposed LID site design, LID BMPs, and additional on-site or off- site retention BMPs BMPs upstream of a waterbody segment with a potential HCOC may be used to demonstrate additional peak runoff reduction through hydrograph attenuation (if so, attach to this WQMP, a hydrograph analysis showing how the peak runoff would be reduced during a 2-yr storm event) Incorporate appropriate in-stream controls for downstream waterbody segment to prevent impacts due to hydromodification, in a plan approved and signed by a licensed engineer in the State of California Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) 4-25 Packet Pg. 120 B.1.g Water Quality Management Plan (WQMP) Grand Terrace DentistGrand Terrace, CA 4.4 Alternative Compliance Plan (if applicable) Describe an alternative compliance plan (if applicable) for projects not fully able to infiltrate, harvest and use, or biotreat the DCV via on-site LID practices. A project proponent must develop an alternative compliance plan to address the remainder of the LID DCV. Depending on project type some projects may qualify for water quality credits that can be applied to reduce the DCV that must be treated prior to development of an alternative compliance plan (see Form 2.4-1, Water Quality Credits). Form 4.3-9 Item 8 includes instructions on how to apply water quality credits when computing the DCV that must be met through alternative compliance. Alternative compliance plans may include one or more of the following elements: On-site structural treatment control BMP - All treatment control BMP should be located as close to possible to the pollutant sources and should not be located within receiving waters; Off-site structural treatment control BMP - Pollutant removal should occur prior to discharge of runoff to receiving waters; Urban runoff fund or In-lieu program, if available Depending upon the proposed alternative compliance plan, approval by the executive officer may or may not be required (see Section 6 of the TGD for WQMP). NOT APPLICABLE Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) 4-26 Packet Pg. 121 B.1.g Water Quality Management Plan (WQMP) Grand Terrace DentistGrand Terrace, CA Section 5 Inspection and Maintenance Responsibility for Post Construction BMP All BMP included as part of the project WQMP are required to be maintained through regular scheduled inspection and maintenance (refer to Section 8, Post Construction BMP Requirements, in the TGD for WQMP). Fully complete Form 5-1 summarizing all BMP included in the WQMP. Attach additional forms as needed. The WQMP shall also include a detailed Operation and Maintenance Plan for all BMP and may require a Maintenance Agreement (consult the LIP). If a Maintenance Agreement is required, it must also be attached to the WQMP. Form 5-1 BMP Inspection and Maintenance Minimum Reponsible Inspection/ Maintenance BMPFrequency Party(s)Activities Required of Activities Non-Structural Source Control BMPs (N1) (N2) Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) 5-1 Packet Pg. 122 B.1.g Water Quality Management Plan (WQMP) Grand Terrace DentistGrand Terrace, CA (N3) (N4) (N6) (N11) (N12) (N14) Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) 5-2 Packet Pg. 123 B.1.g Water Quality Management Plan (WQMP) Grand Terrace DentistGrand Terrace, CA (N15) (N17) Owner will be responsible for ensuring the project will comply Comply with all with the current NPDES Stormwater Permit R8-2010-0036, other applicable amendments and/or subsequent NPDES Stormwater Permits. NPDES permits Structural Source Control BMPs (S1) (S4) (S5) Low Impact Development (LID) BMPs Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) 5-3 Packet Pg. 124 B.1.g Water Quality Management Plan (WQMP) Grand Terrace DentistGrand Terrace, CA Infiltration BMP: Pre-Treatment BMPs Hydrodynamic Separator: Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) 5-4 Packet Pg. 125 B.1.g Water Quality Management Plan (WQMP) BlissCar WashChino Hills Section 6 WQMP Attachments 6.1. Site Plan and Drainage Plan Include a site plan and drainage plan sheet set containing the following minimum information: Project location Site boundary Land uses and land covers, as applicable Suitability/feasibility constraints Structural Source Control BMP locations Site Design Hydrologic Source Control BMP locations LID BMP details Drainage delineations and flow information Drainage connections 6.2 Electronic Data Submittal Minimum requirements include submittal of PDF exhibits in addition to hard copies. Format must not require specialized software to open. If the local jurisdiction requires specialized electronic document formats (as described in their local Implementation Plan), this section will describe the contents (e.g., layering, nomenclature, geo-referencing, etc.) of these documents so that they may be interpreted efficiently and accurately. Electronic copies of the FWQMP and all exhibits/attachments will be provided prior to final approval. 6.3 Post Construction Attach all O&M Plans and Maintenance Agreements for BMP to the WQMP. BMP Maintenance Agreement. 6.4 Other Supporting Documentation The following items are also provided in this WQMP: Attachment A: Educational Materials Attachment B: Hydrologic Soil Group Map, HCOC Exempt Area Map, and NOAA Rainfall Data Attachment C: BMP Calculations & Details Attachment D: Conditions of Approval Attachment E: Infiltration Soils Report Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Attachment F: O&M Plan, BMP Maintenance Agreement 6-1 Packet Pg. 126 B.1.g Water Quality Management Plan (WQMP) .ƌźƭƭ /ğƩ ‘ğƭŷ Α /ŷźƓƚ Iźƌƌƭ AttachmentA: EducationalMaterials Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Attachments Packet Pg. 127 B.1.g Gps!Sftjefout Uif!gpmmpxjoh!jt!b!qsfwjfx!pg!uif!jogpsnbujpo!xf! ibwf!bwbjmbcmf!up!sftjefout/!Gps!npsf!gbdu!tiffut-! wjtju!! Ipvtfipme!Ib{bsepvt!Xbtuf!Dfoufs!Mpdbujpot TOOTOXICTOTRASH Disposeofyour HOUSEHOLDHAZARDOUSWASTE(HHW)ata FREE HHWCenternear you.Examplesofitemscollected:pesticides,fertilizers,paints,cleaners,antifreeze, batteries,motoroil,oilfilters,andelectronicwaste. SERVICEAREALOCATIONDAYSOPENHOURS (does not accept E- 42040GarstinDr.(cross:BigBearBlvd.)Saturdays9a.m.-2p.m. BigBearLake waste) ndth 2&4Sat. Chino 5050SchaeferAve.(cross:4thSt.)8a.m.-1p.m. Note:Provideatrashbillanda Fontana(Fontanaresidentsonly)16454OrangeWay(cross:CypressAve.)Saturdays8a.m.-12p.m. driver’slicenseasproofofresidency. Ontario 1430S.CucamongaAve.(cross:BelmontSt.)Fri.&Sat.9a.m.-2p.m. RanchoCucamonga 8794 Lion Street. (Off 9th St, between Vineyard and He llma n) Sa turda y s 8 a.m. - 12 p.m. Redlands 500KansasSt.(cross:ParkAve.)Saturdays 9:30a.m.-12:30p.m. ndth (does not accept E-waste) Rialto 246WillowAve.(cross:RialtoAve.)2&4Fri.&Sat.8a.m.-12p.m. Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) SanBernardino 2824East‘W’St.,302(cross:VictoriaAve.)Mon.–Fri.9a.m.-4p.m. Upland 1370N.BensonAve.(cross:14thSt.)Saturdays9a.m.-2p.m. To report illegal dumping, call (877) WASTE18 or visit sbcountystormwater.org TAKEONE Packet Pg. 128 B.1.g QBJOU Xifoqbjoujohzpvsipnf- qspufduzpvsgbnjmzboedpnnvojuz/ uibubsfxbufs.cbtfebsfmfttupyjdboetipvme cfvtfexifofwfsqpttjcmf/ xjuixbufs.cbtfeqbjoutipvmecfxbtife jouiftjol/Uiptfxjuipjm.cbtfeqbjoutipvmecf dmfbofexjuiqbjouuijoofs/ ejtqptf!pg!voxboufe!qbjou!boe!qbjou!uijoofs/ Uif!Dpvouz!pg!Tbo!Cfsobsejop!pggfst!:!IIX!Dfoufst uibu!bddfqu!qbjou!boe!puifs!ipvtfipme!ib{bsepvt!xbtuf gspn!sftjefout!GSFF!pg!dibshf/!!Gps!b!mjtu!pg!bddfqubcmf Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) nbufsjbmt-!mpdbujpo!jogpsnbujpo-!boe!ipvst!pg!pqfsbujpo dbmm!2.911.PJMZ!DBU/ Jo!uif!fwfou!pg!b!tqjmm!ps!ejtdibshf!up!b!tupsn!esbjo!ps!xbufsxbz-!dpoubdu!Tbo!Cfsobejop!Dpvouz! Tupsnxbufs!jnnfejbufmz;!)988*!XBTUF29!!}!!tcdpvouztupsnxbufs/psh0sfqpsu tcdpvouztupsnxbufs/psh Sbodip!Dvdbnpoh Packet Pg. 129 27 Zvdbjqb B.1.g WFIJDMF!NBJOUFOBODF Cfsobsejop!Dpvouz!tupsn!esbjo!tztufn-!boe!ep!opu!hfu!usfbufe!cfgpsf!sfbdijoh!uif!Tboub!Bob!Sjwfs/! Uijt!qpmmvuft!pvs!esjoljoh!xbufs!boe!dpoubnjobuft!xbufsxbzt-!nbljoh!uifn!votbgf!gps!qfpqmf!boe! xjmemjgf/!Gpmmpx!uiftf!cftu!nbobhfnfou!qsbdujdft!up!qsfwfou!qpmmvujpo!boe!qspufdu!qvcmjd!ifbmui/ Dmfbojoh!Bvup!QbsutDmfbojoh!Tqjmmt Tdsbqf!qbsut!xjui!b!xjsf!csvti!ps!vtf!!Vtf!esz!nfuipet!gps!tqjmm!dmfbovq!! b!cblf!pwfo!sbuifs!uibo!mjrvje!dmfbofst/!)txffqjoh-!bctpscfou!nbufsjbmt*/!Up!sfqpsu! Bssbohf!esjq!qbot-!eszjoh!sbdlt!boe!esbjo!bddjefoubm!tqjmmt!joup!uif!tusffu!ps!tupsn!esbjo! dbmm!)988*!XBTUF29!ps!:22/ Ep!opu!xbti!qbsut!ps!frvjqnfou!jo!b!tjol-!Qspqfs!Ejtqptbm!pg qbsljoh!mpu-!esjwfxbz!ps!tusffu/Ib{bsepvt!Xbtuf Ejtqptf!pg!ipvtfipme!ib{bsepvt!xbtuf!! Tupsjoh!Ib{bsepvt!Xbtuf cz!ubljoh!ju!up!zpvs!ofbsftu!ipvtfipme!! Lffq!zpvs!mjrvje!xbtuf!tfhsfhbufe/!Nboz!ib{bsepvt!xbtuf!dfoufs/!Gps!npsf!! jogpsnbujpo-!dbmm!2.911.PJMZ!DBU!ps!difdl!! ejtqptbm!dpnqbojft!jg!uifz!bsf!opu!njyfe/!pvu!tcdpvouztupsnxbufs/psh0Ejtqptbm/iunm Tupsf!bmm!nbufsjbmt!voefs!dpwfs!xjui!! tqjmm!dpoubjonfou!ps!jotjef!up!qsfwfou Qsfwfoujoh!Mfblt!boe!Tqjmmt Dpoevdu!bmm!wfijdmf!nbjoufobodf!jotjef!pg!! b!hbsbhf/!Qmbdf!esjq!qbot!voefsofbui!wfijdmf! jotufbe!pg!xbufs!up!dmfbo!xpsl!bsfbt/ Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Jo!uif!fwfou!pg!b!tqjmm!ps!ejtdibshf!up!b!tupsn!esbjo!ps!xbufsxbz-!dpoubdu!Tbo!Cfsobejop!Dpvouz! Tupsnxbufs!jnnfejbufmz;!)988*!XBTUF29!!}!!tcdpvouztupsnxbufs/psh0sfqpsu tcdpvouztupsnxbufs/psh Sbodip!Dvdbnpoh Packet Pg. 130 28 Zvdbjqb B.1.g QFU!XBTUF!EJTQPTBM FREE DOGGIE WASTE BAGS Remember to pick up after your pet every time to keep San Bernardino County clean and healthy! Jo!uif!fwfou!pg!b!tqjmm!ps!ejtdibshf!up!b!tupsn!esbjo!ps!xbufsxbz-!dpoubdu!Tbo!Cfsobejop!Dpvouz! Tupsnxbufs!jnnfejbufmz;!)988*!XBTUF29!!}!!tcdpvouztupsnxbufs/psh0sfqpsu tcdpvouztupsnxbufs/psh Sbodip!Dvdbnpoh Packet Pg. 131 29 Zvdbjqb B.1.g Hfu!Jo!Upvdi!Xjui!Vt!Pomjof" ¼!Xfctjuf! tcdpvouztupsnxbufs/psh ¼!fVqebuft tcdpvouztupsnxbufs/psh0ofxtmfuufs ¼!Gbdfcppl gbdfcppl/dpn0tcdpvouztupsnxbufs ¼!ZpvUvcf zpvuvcf/dpn0tcdpvouztupsnxbufs ¼!Sfqpsu!Qpmmvujpo!Wjpmbujpot tcdpvouztupsnxbufs/psh0sfqpsu ¼!Fnbjm! jogpAtcdpvouztupsnxbufs/psh Packet Pg. 132 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Packet Pg. 133 B.1.g VOBSEÎOTBOP; NVDIPEFQFOEFEFÊM/ FTUSBUÊHJDBNFOUF FTDBTBNFOUF FMJNJOF Qbsb!sfqpsubs!bdujwjebeft!jmfhbmft!mmbnbs!bm! )988*!XBTUF29!p!wjtjuf! tcdpvouztupsnxbufs/psh Attachment: Attachment 4 - PWQMP (Spring Hills Family Packet Pg. 134 B.1.g XFEJEJUPVSTFMWFT BOEXFEJEJUSJHIU QBJOUT CSVTIFT TBGFMZ Up!sfqpsu!jmmfhbm!evnqjoh-!dbmm! )988*!XBTUF29!ps!wjtju! tcdpvouztupsnxbufs/psh Attachment: Attachment 4 - PWQMP (Spring Hills Family Packet Pg. 137 B.1.g MPIJDJNPTOPTPUSPTNJTNPT ZMPIJDJNPTCJFO QJOUVSBT CSPDIBT TBOBNFOUF Qbsb!sfqpsubs!bdujwjebeft!jmfhbmft!mmbnbs!bm! )988*!XBTUF29!p!wjtjuf! tcdpvouztupsnxbufs/psh Attachment: Attachment 4 - PWQMP (Spring Hills Family Packet Pg. 138 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 139 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 140 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 141 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 142 B.1.g Nbjoubjo!zpvs!qppm!qspqfsmz! boe!ifmq!qspufdu!uif!fowjsponfou Spvujof!txjnnjoh!qppm!nbjoufobodf!hfofsbuft!b!wbsjfuz!pg!xbtuft!tvdi!bt!dmfbojoh! xbtufxbufs-!gjmufs!cbdl.xbti!sftjevft-!cjpdjeft!boe!bdje!xbtift!uibu!dbo!dpousjcvuf! EJE!ZPV up!tupsnxbufs!qpmmvujpo/!Dimpsjof!boe!puifs!qppm!difnjdbmt!dbo!ibsn!pvs!xbufsxbzt! xifo!uifz!bsf!ejtdibshfe!jnqspqfsmz/ LOPX@ Tibsf!uiftf!hppe!ipvtflffqjoh!qsbdujdft!xjui!zpvs!qppm! tfswjdf!qfstpoofm!up!lffq!qpmmvubout!pvu!pg!pvs!xbufsxbzt; Tivu!pgg!uif!dimpsjobujpo!tztufn!ps!tupq!beejoh!dimpsjof/ TIVU;! IPME!JU CFGPSF!ZPV ! Ipme!uif!xbufs!jo!uif!qppm!gps!bu!mfbtu!6!ebzt!ps!bee!b!!!!!!!!!!!!!!!!!!! IPME;! ESBJO!JU/ ef.dimpsjobujoh!bhfou/ Ef.dimpsjobuf!uif!xbufs! cfgpsf!esbjojoh!uif!qppm!up! Vtf!b!qppm!uftujoh!lju!up!fotvsf!uif!mfwfm!pg!dimpsjof!jt!bu! UFTU;! uif!tupsn!esbjo/! 1/2qqn!cfgpsf!ejtdibshjoh!uif!xbufs/ Dpotvmu!xjui!zpvs!qppm! dpousbdups!cfgpsf! ef.dimpsjobujoh!uif!qppm!up! mfbso!bcpvu!zpvs!pqujpot/ Difdl!xjui!zpvs!djuz!gps!mpdbm!sfrvjsfnfout!cfgpsf!ejtdibshjoh! ESBJO; JNQPSUBOU; zpvs!qppm!up!uif!tupsn!esbjo!ps!tfxfs/ Ejtqptf!pg!gjmufs!cbdlxbti! Bmufsobujwf!2; tpmjet!jo!uif!usbti!ps! up!uif!tbojubsz!tfxfs!evsjoh!opo.qfbl!ipvst/ mboetdbqf!bsfb/ Bmufsobujwf!3;! Ofvusbmj{f!bdje!xbtift! qspcmfnt!ps!uif!xbufs!foufsjoh!b!ofjhicps“t!qspqfsuz/ cfgpsf!ejtdibshjoh!up!uif! Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) tfxfs/!Ep!opu!ejtdibshf!up! Gps!Tbmuxbufs!Qppmt; uif!tupsn!esbjo/ tfxfs!ps!ibvmfe!bxbz/! Up!sfqpsu!jmmfhbm!evnqjoh-!dbmm!)988*!XBTUF29!ps!wjtju!tcdpvouztupsnxbufs/psh gbdfcppl/dpn0tcdpvouztupsnxbufs Packet Pg. 143 B.1.g Dpotfswf!tv!qjtdjob!fo!!!!!cvfo!ftubep!z!bzvef!b!qspufhfs!fm!nfejp!bncjfouf ÀTbcîb! !!!rvf///@ Dpnqbsub!ftubt!cvfobt!qsâdujdbt!ef!mjnqjf{b!dpo!tv!qfstpobm!ef!tfswjdjp! ef!qjtdjobt!qbsb!nboufofs!mbt!bmdboubsjmmbt!mjcsft!ef!dpoubnjobouft; DPSUBS; Dpsuf!fm!tjtufnb!ef!dmpsbdjôo!p!efkf!ef!bhsfhbs!dmpsp/ FTQFSF! BOUFT!EF ! Dpotfswf!fm!bhvb!fo!mb!qjtdjob!6!eîbt!p!bhsfhvf!vo!bhfouf!ef! DPOTFSWBS;!! eftdmpsbdjôo/ WBDJBS/ Efcf!fmjnjobs!fm!dmpsp!efm!bhvb! Vujmjdf!vo!frvjqp!ef!qsvfcbt!qbsb!qjtdjobt!dpo!fm!gjo!ef!btfhvsbs! bouft!ef!wbdjbs!mb!qjtdjob!fo!mbt! QSPCBS;!! rvf!fm!ojwfm!ef!dmpsp!ftuê!fo!1/2qqn!bouft!ef!wbdjbs!fm!bhvb/ bmdboubsjmmbt/! Dpotvmuf!dpo!tv!dpousbujtub!ef! qjtdjob!qbsb!pcufofs!nât! jogpsnbdjôo!tpcsf!tvt!pqdjpoft/ Wfsjgjrvf!mpt!sfrvjtjupt!mpdbmft!ef!tv!djvebe!bouft!ef!wbdjbs!tv! WBDJBS;! JNQPSUBOUF; qjtdjob!fo!fm!eftbhýf!ef!mbt!bmdboubsjmmbt/ Eftfdif!mpt!tômjept!efm!bhvb! Bmufsobujwb!2;! ftubodbeb!ef!mpt!gjmuspt!fo! mb!cbtvsb!p!fo!fm!kbseîo/ Bmufsobujwb!3;! Ofvusbmjdf!mpt!mbwbept!bm! âdjep!bouft!ef!wbdjbsmpt!fo! Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) mb!bmdboubsjmmb/!Op!eftfdif! Qbsb!mbt!Qjtdjobt!ef!Bhvb!Tbmbeb;! obeb!dpoubnjobouf!fo!mbt! bmdboubsjmmbt/ Qbsb!sfqpsubs!eftfdipt!jmfhbmft-!dpnvoîrvftf!bm!)988*!XBTUF29!p!wjtjuf!tcdpvouztupsnxbufs/psh gbdfcppl/dpn0tcdpvouztupsnxbufs Packet Pg. 144 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 145 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 146 B.1.g TOOTOXICTOTRASH Disposeofyour HOUSEHOLDHAZARDOUSWASTE(HHW)ata FREE HHWCenternear you.Examplesofitemscollected:pesticides,fertilizers,paints,cleaners,antifreeze, batteries,motoroil,oilfilters,andelectronicwaste. SERVICEAREALOCATIONDAYSOPENHOURS BigBearLake 42040GarstinDr.(cross:BigBearBlvd.)Saturdays9a.m.-2p.m. (does not accept E-waste) ndth Chino 5050SchaeferAve.(cross:4thSt.)2&4Sat.8a.m.-1p.m. Note:Provideatrashbillanda Fontana(Fontanaresidentsonly)16454OrangeWay(cross:CypressAve.)Saturdays8a.m.-12p.m. driver’slicenseasproofofresidency. Ontario 1430S.CucamongaAve.(cross:BelmontSt.)Fri.&Sat.9a.m.-2p.m. RanchoCucamonga 8794 Lion Street. (Off 9th St, between Vineyard an d He llma n) Sa turda y s 8 a.m. - 12 p.m. Redlands 500KansasSt.(cross:ParkAve.)Saturdays 9:30a.m.-12:30p.m. ndth Rialto 246WillowAve.(cross:RialtoAve.)2&4Fri.&Sat.8a.m.-12p.m. (does not accept E-waste) SanBernardino 2824East‘W’St.,302(cross:VictoriaAve.)Mon.–Fri.9a.m.-4p.m. Upland 1370N.BensonAve.(cross:14thSt.)Saturdays9a.m.-2p.m. Attachment: Attachment 4 - PWQMP (Spring Hills To report illegal dumping, call (877) WASTE18 or visit sbcountystormwater.org TAKEONE Packet Pg. 147 B.1.g Water Quality Management Plan (WQMP) .ƌźƭƭ /ğƩ ‘ğƭŷ Α /ŷźƓƚ Iźƌƌƭ AttachmentB: HydrologicSoilGroupMap HCOCExemptAreaMap NOAARainfallData Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Attachments Packet Pg. 148 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 151 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 152 Figure F-1 QSPKFDU TJUF Legend Hydromodification DrainageCourse B.1.g Hydromodification A.1 Hydrologic Conditions of Concern (HCOC) Analysis HCOC Exemption: 1.Sump Condition: All downstream conveyance channel to an adequate sump (for example, Prado Dam, Santa Ana River, or other Lake, Reservoir or naturally erosion resistant feature) that will receive runoff from the project are engineered and regularly maintained to ensure design flow capacity; no sensitive stream habitat areas will be adversely affected; or are not identified on the Co-Permittees Hydromodification Sensitivity Maps. 2.Pre = Post: The runoff flow rate, volume and velocity for the post-development condition of the Priority Development Project do not exceed the pre-development (i.e, naturally occurring condition for the 2-year, 24-hour rainfall event utilizing latest San Bernardino County Hydrology Manual. a.Submit a substantiated hydrologic analysis to justify your request. 3.Diversion to Storage Area: The drainage areas that divert to water storage areas which are considered as control/release point and utilized for water conservation. a.See Appendix F for the HCOC Exemption Map and the on-line Watershed Geodatabase (http://sbcounty.permitrack.com/wap) for reference. 4.Less than One Acre: The Priority Development Project disturbs less than one acre. The Co-permittee has the discretion to require a Project Specific WQMP to address HCOCs on projects less than one acre on a case by case basis. The project disturbs less than one acre and is not part of a common plan of development. 5.Built Out Area:The contributing watershed area to which the project discharges has a developed area percentage greater than 90 percent. a.See Appendix F for the HCOC Exemption Map and the on-line Watershed Geodatabase (http://sbcounty.permitrack.com/wap) for reference. Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 154 B.1.g Summary of HCOC Exempted Area HCOCExemptionreasoning 12345 Area AXX BX CX EX FX GXX H01XX H02XX H02AXX H02BX H03X H04XX H05X H06X H07X H08XX H09X H10XX H11XX H12X JX UX WX IX IIX III X IVX X VX* VI X VII X VIIIX IX X Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) XX XIIIX *Detention/Conservation Basin Packet Pg. 155 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 156 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 157 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 158 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 159 B.1.g Water Quality Management Plan (WQMP) .ƌźƭƭ /ğƩ ‘ğƭŷ Α /ŷźƓƚ Iźƌƌƭ AttachmentC: BMPCalculations&Details Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Attachments Packet Pg. 160 B.1.g 2 1/36 1/61 3 2 1/36 2/36 2/86 3/2: 2/29 / 1/65 Uifjogjmusbujpo0qfsdpmbujpouftusfqpsujtjodmvefejoBuubdinfouCpguijtsfqpsu/Uifuftuxbt qfsgpsnfejouifopsuixftuqspqfsuzdpsofsbubqqspyjnbufmz6(cfmpxhspvoetvsgbdf/Uif nfbtvsfejogjmusbujposbufjtublfobt2/29jo0isgpsuifqspqptfejogjmusbujpotztufn/ UiftbgfuzgbdupstfmfdujpoboeefubjmfefyqmbobujpogpsTvjubcjmjuzbttfttnfou.sfmbufe dpotjefsbujpotdbocfgpvoejoUbcmfWJJ/4boeEftjho.sfmbufedpotjefsbujpotdbocfgpvoejo UbcmfWJJ/5/ Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 161 B.1.g Suitability Assessment Related Considerations for Infiltration Facility Safety Factors Medium ConsiderationHigh Concern Low Concern Concern (Factor of 3) (Factor of 1) (Factor of 2) Directmeasurement of 50 Useof soil survey Directmeasurementof percent of infiltrationarea maps or simple 20 percent of with localized infiltration textureanalysistoinfiltration area with measurement methods estimate short-term localizedinfiltration infiltration rates measurementmethods (e.g.,infiltrometer) Assessment methods (see explanation below) Silty and clayey Granular to slightly loamy soilswith soils Loamy soils significantfines Texture Class Soil borings/testpits Highlyvariablesoils Multiplesoilborings/test indicate moderately indicated from site pits indicate relatively assessment or limited homogeneous soils soil borings collected during site assessment Site soil variability >10 below facility bottom Depth to groundwater/ <5 ft below facility 5-10 ft below facility impervious layer bottombottom (Factor of 1 is applied). Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 162 B.1.g Design Related Considerations for Infiltration Facility Safety Factors High Concern Medium Concern Low Concern Consideration (Factor of 3)(Factor of 2)(Factor of 1) 2acres or less. Greater than 2 acres Tributary area size Greater than 10 acres. but less than 10acres. Pretreatmentfrom gross Good pretreatment with BMPs solidsremoval devices only, that mitigate coarse suchas hydrodynamic sediments such as vegetated separators, racks and swalesAND influent sediment screens AND tributary area Excellent pretreatment loadsfrom thetributaryarea includes landscapedareas, withBMPs that mitigate are expected to be relatively steep slopes, hightraffic fine sediments such as Level of pretreatment/ low (e.g.,low traffic, mild areas,or anyother areas bioretentionor media expected influent slopes, disconnected expectedto produce high filtration OR sedimentation sediment loads impervious areas, etc.). sediment,trash,or debris or facility only treats runoff loads. from relatively clean surfaces, such as rooftops. High redundancy, multiple Noredundancy in BMP Medium redundancy, othercomponents capable of treatment train. BMPs available in treatment operating independently (Underground Infiltration Redundancy of train to maintain at least 50% and in parallel, maintaining the only BMP treatment of functionof facility in eventat least 90% of facility provided for the treatment of failure. functionality in event of areaFactor of 3is applied) failure. Heavy equipment actively prohibitedfrom infiltration areas duringconstruction andlow probability of Constructionof facility on a Medium probability of unintended/ indirect Compaction during compacted site or elevated unintended/ indirect compaction. construction probability of unintended/ compaction. (Heavy equipment indirect compaction. activities are prohibited from the infiltration areas Factor of 1is applied) Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 163 B.1.g LID DCV CALCULATIONS PROJECT:Grand Terrace Dentist LOCATION:Grand Terrace, CA DATE:3/12/2024 BY:WRA LID DCV CALCULATION DA-1, DMA A DRAINAGE AREA: NOTES (entire property) 2 BMP Drainage Area (A) \[ft\] 72,000 DMA \[ac\] 1.653 2 Pervious Area (A) \[ft\]13,234 PERV 2 58,766 Impervious Area (A) \[ft\] IMP A / A (i) \[ratio\] 0.816 IMPTRIB 3 2 Composite Runoff Coefficient (C) 0.619 C = 0.858*i- 0.78*i+ 0.774*i + 0.04 2-yr, 1-hr Rainfall Depth (P) \[in\] 0.459per NOAA Atlas 14 2yr,1hr Regression Constant (a) 1.4807per TGD Section 4.1 Step 4 (desert region) 1 6-hr Mean Storm Rainfall (P) \[in\] P = a * P 0.680 6 612yr,1hr Regression Constant (a) 1.963per TGD Section 4.1 Step 5 (48-hour drawdown) 2 Detention Volume (P) \[in\] P = a * C * P 0.825 0 026 DCV = A* \[a*C * P\] / 12 Design Capture Volume (DCV) \[ac-ft\] 0.114 DMA26 3 4,952= \[ac-ft\] * 43,560 \] \[ft Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 164 B.1.g VOLUME-BASED BMP: PROJECT:Grand Terrace Dentist LOCATION:Grand Terrace, CA STORAGE & DRAWDOWN TIME CALCULAT DATE:3/12/2024 BY:WRA DRAINAGE AREA:DA-A, DMA-A STORMTANK MODULE SYSTEM DATA BMP STAGE-VOLUME TABLE: V (cf)H (ft)V (cf)V (cf) StorageH (ft)% Req. Module Storage: stonetanktankBMP Module Length60.000.0% ft Gravel 0.0000.0000 Module Width25.502.3% ft0.171140.000114 No. of Modules14.6% ea0.332270.000227 Total Surface Area1,5306.9% sf0.503410.000341 Module Height3.0012.1% ft0.673530.17247600 Gravel 0.97017.3% Module Porosity+ Tank 0.833640.33495859 22.5% Module Storage4,452cf1.003760.507421,118 Gravel Pit Storage:27.7% 1.173880.679891,377 62.0032.9% sf1.333990.831,2371,636 System Width 27.5038.1% System Lengthsf1.504111.001,4841,895 1,70543.3% sf1.674231.171,7312,154 Total Surface Area 48.5% Gravel Depth3.50ft1.834341.331,9792,413 0.4053.7% Stone Porosity2.004461.502,2262,672 Stone Storage551cf Total BMP Storage5,003cf 0.115ac-ft INFILTRATION RATE Measured 1.18in/hr ) Infiltration (I 0.0983ft/hr avg Factor of Safety2.0000 Design Infiltration 0.59in/hr (I) 0.05ft/hr design BMP DRAWDOWN TIMEBMP VOLUME MITIGATION SUMMARY 3 T = d / I Required Volume (DCV)4,978 EQdesign ft 23 nf. Surface Area, SARetention Volume (V) 1,705 n/a ftft infret 3 Equivalent Depth, dDetention Volume (V) 2.93ft 5,003 ft EQBMP 3 Drawdown Time (T)59.68hrTotal Mitigated Volume5,003 ft T < 48hr ? V > V ? NOYES100.5% BMP designreq. Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 165 B.1.g Volume Calculator Project Name:Grand Terrace DentistModule Length:60ft Engineer:CDRDate:8/23/2023Width:25.5ft Units:USShape:Square/RectangleExcavation Length:62ft Liner:YesLocation:N/AWidth:27.5ft Stacking:SingleHeight:36Stone Leveling Bed:0.5ft Stone Storage:Excluding AbovePorosity:40%Top Backfill:1ft Compacted Fill:1ft Results Capacity: Stone Storage Volume:551.00 ft^3 Storage Capacity Ratio Module Storage Volume:4,452.64 ft^3 Total Storage Volume:5,003.64 ft^3 11% Quantities: Required Excavation:347.31 y^3 Required Stone Volume:114.17 y^3 89% Estimated Geotextile:961.54 y^2 Estimated Liner:0.00 ft^2 Stone Storage Volume:Module Storage Volume: Λ9ƭƷźƒğƷźƚƓƭ źƓĭƌǒķĻ ЊЉі ŅƚƩ ƭĭƩğƦ ğƓķ ƚǝĻƩƌğƦΜ Basin Detail Component Quantities:Cross-Section: Bottom Top Total LayerLayer Height36.0N/A36.0 340N/A340 # of Modules # of Platens680N/A680 114N/A114 # of Side Panels # of Columns2,720N/A2,720 0N/A0 # of Stacking Pins SSI Packet Pg. 166 Module FootprintModule CountModule PerimeterSide Panel CountModule HeightModule CapacityTotal Module Storage sfftinft^3 15303401711143613.0964452.64 Stone FootprintStone PerimeterStone HeightStone PorosityStone Volume (All)Stone Volume (Minus Top)Stone Volume (None) sfftftft^3ft^3ft^3 17051794.5040%7672.5005967.5000.000 Excavation FootprintExcavation HeightExcavation VolumeModule GeotextileExcavation GeotextileModule LinerExcavation Liner sfftft^3sfsfsfsf 17055.509377.50039704683.88888900 B.1.g FLOW-BASED BMP: PROJECT:Grand Terrace Dentist LOCATION:Grand Terrace, CA TREATMENT FLOW SIZING CALCULATIONS DATE:3/12/2024 BY:WRA FLOW-BASED BMP DESIGN DRAINAGE AREA:DA-1, DMA-A Notes BMP Drainage Area (A ) 72,000sf DMA 1.653ac Pervious Area (A) 13,234sf PERV Impervious Area (A) 58,766sf IMP / A (i) A 0.82 IMPTRIB 3 2 Composite Runoff Coefficient (C) 0.619 C = 0.858*i- 0.78*i+ 0.774*i + 0.04 2-yr, 1-hr Rainfall Depth (P) 0.459inper NOAA Atlas 14 2yr,1hr Rainfall Intensity (I) 2.50 per SBCFCD Hydrology Manual Figure D-3 2yr,1hr 2yr-1hr Flow Rate (Q) Q = A * C* I 2.56cfs 2 DMA2yr,1hr BMP Capacity (Q) 3.20cfs Aqua-Swirl Model AS-4 BMP CHECK: Q > Q ? YES125% BMP2 Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Page 1 of 1 Packet Pg. 168 B.1.g Aqua-Swirl™Sizing Chart WaterQuality Maximum SwirlOil/DebrisSediment Aqua-Swirl™ Treatment Stub-Out Pipe ChamberStorageStorage Model 2 Outer Diameter DiameterCapacityCapacity Flow 3 (cfs)(ft) (ft.)(in.)(gal) 1 On/Offline CFD AS-22.501.13710 812 AS-33.2510161.811020 AS-44.2512183.219032 AS-55.0012244.427045 AS-66.0014306.339065 AS-77.0016368.654090 AS-88.00184211.2710115 AS-99.00204814.2910145 AS-1010.0225417.51130180 AS-1212.0244825.21698270 AS-XXCustom---->26---- *Higher water quality treatment flow rates can be designed with multiple swirls. TheAqua-Swirl™ConveyanceFlowDiversion(CFD)providesfulltreatmentofthe "firstflush,"whilethepeakdesignstormisdivertedandchanneledthroughthemain conveyance pipe. Please refer to your local representative for more information. Manyregulatoryagenciesareestablishing"waterqualitytreatmentflowrates"fortheir areasbasedontheinitialmovementofpollutantsintothestormdrainagesystem.The treatmentflowrateoftheAqua-Swirl™systemisengineeredtomeetorexceedthe localwaterqualitytreatmentcriteria.This"waterqualitytreatmentflowrate" typically represents approximately 90% to 95% of the total annual runoff volume. Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 169 B.1.g Water Quality Management Plan (WQMP) .ƌźƭƭ /ğƩ ‘ğƭŷ Α /ŷźƓƚ Iźƌƌƭ AttachmentD: Copyof0±®©¤¢³Ȍ²InfiltrationSoilsReport Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Attachments Packet Pg. 170 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 171 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 172 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 173 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 174 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 175 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 176 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 177 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 178 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 179 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 180 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 181 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 182 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 183 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 184 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 185 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 186 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 187 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 188 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 189 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 190 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 191 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 192 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 193 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 194 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 195 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 196 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 197 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 198 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 199 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 200 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 201 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 202 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 203 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 204 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 205 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 206 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 207 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 208 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 209 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 210 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 211 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 212 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 213 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 214 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 215 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 216 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 217 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 218 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 219 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 220 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 221 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 222 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 223 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 224 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 225 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 226 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 227 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 228 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 229 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 230 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 231 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 232 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 233 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 234 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 235 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 236 B.1.g Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Packet Pg. 237 B.1.g & A S S O C I A T E S , I N C . June 20, 2023KA Project No. 112-23069 Mr. Walter Kurfurst, CFO Firestation Properties, LLC 22737 Barton Road #12 Grand Terrace, CA 92313 RE: Update to Geotechnical Engineering Investigation Report Proposed Spring Hills Family Dentistry 12167 Mt. Vernon Avenue Grand Terrace, CA Reference: Geotechnical Engineering Investigation, Proposed Dental and Medical Buildings, NEC of Mount Vernon Avenue & City Center Court, Grand Terrace, California, Project No. 112-17056, dated August 16, 2017. Dear Mr. Kurfurst: In accordance with your request, we are providing this letter to update our previous Geotechnical Engineering Investigation report, KA Project No. 112-17056, dated August 16, 2017 for the above- referenced project site. Based on our review of the proposed site plan provided by the project representatives and our discussions with the project owners, we understand that the proposed site plan and development are similar to those described in the referenced Geotechnical Engineering Investigation report. It is our understanding that the proposed development will include the construction of a new dental office structure at the subject site. The structure is anticipated to be a two-story building with an approximate building footprint of 10,000 square feet. In addition, the proposed development is understood to include paved parking and drive areas, and localized landscaped areas. The proposed building is anticipated to be a wood-framed structure supported on a conventional shallow foundation system and incorporating slab-on-grade floor construction. Based on our recent observation of the subject site, review of the previous geotechnical investigation reports, and review of the proposed development site plan, the site and proposed development is consistent with the conclusions and recommendations of the previous Geotechnical Engineering Investigation report. Additional information to conform to seismic design requirements of the 2022 California Building Code (2022 CBC) is provided below. Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) In the event these structural or grading details are inconsistent with the final design criteria, we should be notified so that we can evaluate the potential impacts of the changes on the recommendations presented in this report and provide an updated report as necessary. With Offices Serving The Western United States 1100 Olympic Drive suite 103 Corona, California 92881 (951) 273-1011 Fax: (951) 273-1003 11223069 Update Letter (Spring Hills Dental Clinic) Packet Pg. 238 B.1.g KA Project No. 112-23069 Page No. 2 The Site Class per Section 1613 of the 2022 California Building Code (2022 CBC) and ASCE 7-16, Chapter 20 is based upon the site soil conditions. It is our opinion that a Site Class D is most consistent with the subject site soil conditions. For seismic design of the structures based on the seismic provisions of the 2022 CBC, we recommend the following parameters: Seismic ItemValueCBC Reference Site ClassDSection 1613.2.2 Site Coefficient F1.000Table 1613.2.3 (1) a S2.006Section 1613.2.1 S S2.006Section 1613.2.3 MS S1.338Section 1613.2.4 DS Site Coefficient F1.700Table 1613.2.3 (2) v S0.794Section 1613.2.1 1 S1.350Section 1613.2.3 M1 S0.900Section 1613.2.4 D1 T0.673Section 1613.2 S PGA0.932Figure 22.7 M * Based on Equivalent Lateral Force (ELF) Design Procedure being used. The recommendations and limitations provided in our Geotechnical Engineering Investigation report, KA Project No. 112-17056 apply to this letter and should be incorporated into the design and construction of the proposed building addition. If you have any questions, or if we may be of further assistance, please do not hesitate to contact our office at (951)273-1011. Respectfully submitted, KRAZAN & ASSOCIATES, INC. Jorge A. Pelayo, PE Project Engineer RCE No. 91269 Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Krazan & Associates, Inc. With Offices Serving The Western United States 11223069 Update Letter (Spring Hills Dental Clinic) Packet Pg. 239 B.1.g Water Quality Management Plan (WQMP) .ƌźƭƭ /ğƩ ‘ğƭŷ Α /ŷźƓƚ Iźƌƌƭ AttachmentE: Operation&Maintenance(O&M)Plan BMPMaintenanceAgreement XJMM!CF!JODMVEFE!JO!GJOBM!SFQPSU Attachment: Attachment 4 - PWQMP (Spring Hills Family Dentistry Site and Architectural Review 23-23) Attachments Packet Pg. 240 C.2 AGENDA REPORT MEETING DATE:May 2, 2024 TITLE:Review and Consideration of Zone Change Amendment (ZCA) 23-01, a Proposal to Amend the Grand Terrace Municipal Code Chapter 18.60 (Off-Street Parking) to Update Parking Requirements. California Environmental Quality Act (CEQA) Exempt Pursuant to Section §15061(B)(3) Common Sense Exemption. PRESENTED BY:Scott Hutter, Planning & Development Services Director RECOMMENDATION:It is recommended that the Planning Commission/Site and Architectural Review Board take the following actions: 1)Open the Public Hearing 2)Receive Staff Report 3)Commission Member Comment and Questions 4)Receive Public Input 5)Close the Public Hearing 6)Adopt a Resolution Of The Planning Commission/Site And Architectural Review Board Of The City Of Grand Terrace Recommending That The City Council Adopt An Amendment To Title 18 (Zoning) Of The Grand Terrace Municipal Code Amending Chapter 18.60 (Off-Street Parking) To Update Parking Requirements (Zone Change Amendment 23-01) And Find An Environmental Exemption Pursuant to Section 15061(b)(3) Of The California Environmental Quality Act (CEQA) Guidelines. CEQA exempt pursuant to Section §15061(b)(3) -Common Sense Exemption. 2030 VISION STATEMENT: This project supports Goal 3 to promote economic development by preparing for future development by updating the zoning and development codes to ensure parking standards are current per the Circulation Element Implementation Plan Goal 3.3 and Policy 3.3.2. Packet Pg. 241 C.2 SUMMARY: The City of Grand Terrace proposes a Zone Change Amendment (ZCA) 23-01 to amend parking regulations found within Chapter 18.60 (Off- clarify areas of the off-street parking requirements that are unclear such as can a car overhang into a planter area and what is the parking needed for a drive-through only restaurant with no indoor dining or take-out. BACKGROUND: Title 18 of the Municipal Code contains Section 18.60.030 which identifies off-street parking regulations for residential and non-residential uses. Through the project proposal review process, uses are reviewed for compliance with off-street parking regulations. Although Section 18.60.030 currently includes off-street parking regulations for a variety of use types, updates and modifications were needed to provide additional regulations to be more in line with development best practices. ANALYSIS: Upon receiving a recommendation from the Planning Commission/ Site Architectural Review Board regarding the proposed Zone Change Amendment, the City Council shall act as follows: A. If the Planning Commission's recommendation is for approval, the City Council shall hold a Public Hearing on the proposed Zone Change Amendment. Said Public Hearing shall be duly noticed. After conducting a Public Hearing, the City Council may approve, modify, or disapprove the recommendation of the Planning Commission, provided that any modification of the proposed amendment by the City Council not previously considered by the Planning Commission during its hearing, shall first be referred back to the Planning Commission for its consideration and recommendation. Such consideration resulting from a City Council referral shall require a Public Hearing. Failure by the Planning Commission to report to the City Council on the proposed modification within 40 days, or such longer period as the City Council may designate, shall be deemed an approval of the proposed modification by the Planning Commission. B. If the Planning Commission's recommendation is for denial, the City Council shall not be required to take any further action, unless the applicant, any member of the City Council or any other person affected by the decision, within ten (10) calendar days after the action of the Planning Commission, files an application for appeal, accompanied by the appropriate fee, with the City Clerk. Notable modifications proposed in ZCA 23-01 to parking regulations that the Planning Packet Pg. 242 C.2 Commission/Site Architectural Review Board would be recommending to the City Council are: 1. Updating parking standards for fast food restaurants with and without drive- throughs. 2. Updating gas station parking to address convenience stores and fuel pumps. 3. Added drive-through queueing standards from the Institute of Transportation Engineers. 4. Added handicapped, queued, and electric vehicle spaces into parking space counts. 5. Added a parking space overhang into a planter area into space dimensions. 6. Added a parking management plan requirement to ministerial parking adjustments. 7. Updated shared parking to require site-specific parking study from an engineer. A full accounting of the proposed modifications to Chapter 18.60 - Off-Street Parking is provided in EXHIBIT A of Attachment 1 (Planning Commission Resolution). ENVIRONMENTAL REVIEW: Zone Change Amendment (ZCA) 23-01 is exempt from California Environmental Quality Act (CEQA) pursuant to Section 15061(b)(3) - Common Sense Exemption. The Zone Change Amendment activity is covered by the common sense exemption that CEQA applies only to projects which have the potential for causing a significant effect on the environment. Where it can be seen with certainty that there is no possibility that the Zone Change Amendment activity in question may have a significant effect on the environment, the Zone Change Amendment activity is not subject to CEQA. The project will not have a significant effect on the environment because the amendment only changes administration procedures to the requirement of the municipal code. NOTIFICATION: The Public Hearing Notice for the Project was published in compliance with the City's Grand Terrace City News, posted in three public places, including Grand Terrace News Paper, City Hall Lobby and Kiosk. To date, staff has not received any comments. FINDINGS: Municipal Code Section §18.90.040 - Planning Commission Public Hearing and Recommendation, the Planning Commission/Site and Architectural Review Board shall hold a Public Hearing on any proposed amendment and shall notice said Public Hearing in accordance with Sections 65090 and 65091 of the California Government Code and with Section 18.03.070 (Public Hearing Notice) of Chapter 18.03 (General provisions). Packet Pg. 243 C.2 The Planning Commission/Site Architectural Review Board, after examination of the proposed Zone Change Amendment (ZCA) 23-01, shall make its recommendation to the City Council via a resolution. The Planning Commission/Site Architectural Review Board shall recommend approval only if it makes all necessary findings which are EXHIBIT BAttachment 1 to this agenda report. CONCLUSION: This Parking Ordinance is consistent with the spirit and intent of the Implementation Plan Goal 3.3 and Policy 3.3.2 in that is the City conducting a periodical review of the Zoning Code parking standards to assure that adequate off-street parking is available for specific land uses. The modifications to Chapter 18.60 (Off-Street Parking) are intended to address identified shortcomings of the code and make it more clear what parking is required for land uses and developments. Staff recommends that the Planning Commission/Site and Architectural Review Board approve the Resolution provided as Attachment 1 to this agenda report recommending that City Council determine that Zone Change Amendment (ZCA) 23-01 is exempt from CEQA pursuant to Section 15061(b)(3) - Common Sense Exemption and recommend City Council approve Zone Change Amendment (ZCA) 23-01. ATTACHMENTS: Attachment 1 Resolution for ZCA 23-01 (DOCX) Attachment 1 EXHIBIT A Chapter_18.60___OFF_STREET_PARKING (REDLINED) (DOCX) Attachment 1 - EXHIBIT B - Findings for PC Resolution for ZCA23-01(DOCX) APPROVALS: Scott Hutter Completed 04/26/2024 10:35 AM City Manager Completed 04/26/2024 10:35 AM Planning Commission/Site And Architectural Review Board Pending 05/02/2024 6:30 PM Packet Pg. 244 C.2.a RESOLUTION NO. 2024-03 A RESOLUTION OF THE PLANNING COMMISSION/SITE AND ARCHITECTURAL REVIEW BOARDOF THE CITY OF GRAND TERRACE, CALIFORNIA, RECOMMENDING THAT THE CITY COUNCILADOPT AND FIND AN ENVIRONMENTAL EXEMPTION PURSUANT TO SECTION 15061(b)(3)OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) GUIDELINESAND AMEND TITLE 18 (ZONING) OF THE GRAND TERRACE MUNICIPAL CODE BY AMENDING CHAPTER 18.60 (OFF-STREET PARKING) TO UPDATE PARKING REQUIREMENTS (ZONE CHANGE AMENDMENT 23- 01). WHEREAS, Zoning Code, which has been amended from time to time; and WHEREAS, Chapter 18.60 (Off-Street Parking) requires off-street parking for all proposed development within the City of Grand Terrace to ensure that adequate facilities are provided to meet the needs created by specific land uses, thereby promoting the usefulness of the various uses and protecting the public health and safety, and WHEREAS, Chapter WHEREAS,Zoning Code Amendment 23-01proposes to amend Section 18.60.030 (Parking Regulations) of Chapter 18.60 (Off Street Parking) relating to parking requirements for non-residential uses; and WHEREAS,Grand Terrace , and WHEREAS,pursuant to Sections 65800 and 65850 of the California Government Code, the City may adopt ordinances to establish requirements for off-street parking, in compliance with the California Government Code, and WHEREAS, Zoning Code Amendment 23-01is exempt from California Environmental Quality Act (CEQA) pursuant to Section 15061(b)(3) Common Sense Exemptionin that the activity is covered by the general rule that CEQA applies only to projects, which have the potential for causing a significant effect on the environmentand the Zoning Code update to parking standardswill not have a significant effect on the environment because the amendment only changesminimum code requirements; and WHEREAS, onMay 2, 2024, the Planning Commission/Site and Architectural Review Boardof the City of Grand Terraceconducted a duly noticed Public Hearing on Zoning Code Amendment 23-01and considered testimony and evidence presented by the public, city staff, and other interested parties, at the Public Hearing held within respect thereto; and WHEREAS,all legal prerequisites to the adoption of this Resolution have occurred. NOW THEREFORE, THE PLANNING COMMISSION/SITE ARCHITECTURAL REVIEW BOARDOF THE CITY OF GRAND TERRACE DOES HEREBY RESOLVE AS FOLLOWS: Page 1of 4 Packet Pg. 245 C.2.a SECTION 1.The foregoing recitals set forth above are true and correct and incorporated herein by this reference and made a part hereof. SECTION 2.The Planning Commission/Site and Architectural Review Board hereby finds that the Zone Change Amendment (ZCA) 23-01 is not subject to environmental review pursuant to Section15061(b)(3)of the California Environmental Quality Act (CEQA) Guidelines,a Notice of Exemptionhas been prepared for the project in that the activity is covered by the general rule that CEQA applies only to projects, which have the potential for causing a significant effect on the environment. The project will not have a significant effect on the environment because the amendments only change administration procedures to the requirement of the municipal code; and SECTION 3.The findings for Zone Change Amendment (ZCA) 23-01 pursuant to Grand Terrace Municipal Code Section §18.90.040 can be made supporting the project application as follows: 1)The proposed amendment will not be detrimental to the health, safety, morals, comfort or general welfare of the persons residing or working within the neighborhood of the proposed amendment or within the City. 2)The proposed amendment will not be: Injurious to property or improvements in the neighborhood or within the City. 3)The proposed amendment will be consistent with the latest adopted general plan. EXHIBIT B incorporated herein by this reference. SECTION 4.Based upon the forgoing and all oral and written communications from members of the public and City staff (including, but not limited to, all oral and written staff reports and attachments) presented at the May 2, 2024, Public Hearing, the Planning Commission/Site and Architectural Review Board hereby recommends that the City Council adopt Zone Change Amendment (ZCA) 23-01and adopt and find an environmental exemption pursuant to Section 15061(b)(3) of the California Environmental Quality Act (CEQA) Guidelines to amend Section 18.60.030 of the City of Grand Terrace Municipal Code as shown in redlined tracked changes document includedEXHIBIT Ato this Resolutionand incorporated herein by this reference. SECTION 5.If any section, subsection, subdivision, paragraph, sentence, clause, or phrase contained approved by this Resolution, or any part thereof, is for any reason held to be unconstitutional or invalid or ineffective by any court of competent jurisdiction, such decision shall not affect the validity of effectiveness of the remaining portions of this Resolution or any part thereof. The Planning Commission/Site and Architectural Review Board hereby declares that it would have passed each section, subsection, subdivision, paragraph, sentence, clause, or phrase thereof irrespective of the fact that any one or more subsections, subdivisions, paragraphs, sentences, clauses, or phrases are declared unconstitutional, invalid, or ineffective. APPROVEDAND ADOPTED by the Planning Commission/Site and Architectural Review Boardof the City of Grand Terrace, California, at a regular Public Hearing held on the 2ndday of May2024. Page 2of 4 Packet Pg. 246 C.2.a ATTEST: ____________________________________________________ Debra L. ThomasEdward A. Giroux City ClerkChairman Page 3of 4 Packet Pg. 247 C.2.a STATE OF CALIFORNIA) COUNTY OF SAN BERNARDINO) SS. CITY OF GRAND TERRACE) I Debra Thomas, City Clerk of the CITY OF GRAND TERRACE, CALIFORNIA, DO HEREBY CERTIFY that the foregoing Resolution, being Resolution No. 2024-03,was duly passed, approved and adopted by the Planning Commission/Site and Architectural Review Board, approved and signed by the Chairman, and attested by the City Clerk, at the regular meeting of nd said Planning Commission/Site and Architectural Review Boardheld on the 2day of May 2024, and that and that it was adopted by the called vote as follows: AYES: NOES: ABSENT: ABSTAIN: RECUSE: nd Executed this 2day of May2024, at Grand Terrace, California. ___________________________ Debra Thomas City Clerk Page 4of 4 Packet Pg. 248 C.2.b Title 18 -ZONING Chapter 18.60 OFF-STREET PARKING Chapter 18.60 OFF-STREET PARKING Sections: 18.60.010 Purpose. The purpose of this Chapter is to establish off-street parking regulations to ensure that adequate facilities are provided to meet the needs created by specific land uses, thereby promoting the usefulness of the various uses and protecting the public health and safety. (Ord. 126 § 2, Exh. A(part), 1990) 18.60.020 Application. The regulations of this Chapter shall apply in the event any of the following actions occur: A. Any new construction; B. Any change of use or new use established (includes any proposed use of a structure which has been vacant for a period of six months or more); C. Any addition or enlargement of an existing structure or use; D. Any change in the occupancy of a structure or manner in which a use is conducted which results in the need for additional parking facilities. (Ord. 126 § 2, Exh. A(part), 1990) 18.60.030 Parking regulations. The requirements for off-street parking shall be as follows: A. Residential Uses. 1. Single-family dwellings (detached): a. Two parking spaces for each residential unit shall be provided on the same parcel of land as the residential unit, b. The required spaces shall be located within a garage;. 2. Multiple-family dwellings: a. One parking space for each studio or efficiency unit. b. Two parking spaces for each one-, two- or three-bedroom unit. c. Three parking spaces for each four-bedroom unit or more. d. At least one space shall be located within a garage or carport, and all required spaces shall be located within 150 feet of the unit being served. e. Guest parking shall be provided at a ratio of 0.25 spaces for each residential unit, and shall be rounded up to the next whole number. Attachment: Attachment 1 EXHIBIT A Chapter_18.60___OFF_STREET_PARKING (REDLINED) (Off-Street Parking Amendment) Grand Terrace, California, Municipal Code #±¤ ³¤£Ÿ ʆʂʆʈŻʂʅŻʅʌ ʅʂŸʆʈŸʇʈ Ơ%34ơ (Supp. No. 14) Page 1 of 10 Packet Pg. 249 C.2.b f. Guest parking: (i) Shall be identified as "Guest Parking"; (ii) Shall not be used for the storage of recreational vehicles, boats, trailers or other similar items; (iii) Shall be located on the same parcel of land as the residential units and shall be within reasonable walking distance of said units; (iv) May be uncovered spaces; and (v) May be located on a private street within the site or in a common parking area. 3. Second units and two-unit developments: See Chapter 18.65. 4. Accessory dwelling units and junior accessory dwelling units: See Chapter 18.69. B. Commercial/Office Uses. 1. General commercial and/or office centers comprised of a minimum of 35,000 square feet of gross floor area: One parking space shall be required for every 225 square feet of gross floor area or area devoted to a specific use. Note: The following uses shall in any case provide the number of parking spaces as required in the following subdivision (3); drive-through fast-food restaurants, educational facilities, hospitals, motor vehicle sales facilities and theaters. 2. General Commercial and/or office centers comprised of a minimum of seventy-five thousand square feet of gross floor area: One parking space shall be required for every 250 square feet of gross floor area or other area devoted to a specific use. Note: The following uses shall in any case provide the number of parking spaces as required in following subdivision (3); drive-through fast-food restaurants, educational facilities, hospitals, motor vehicle sales facilities and theaters. 3. The following number of parking spaces shall be required for specific commercial/office uses which are not located within a center as described in the above subdivisions (1) and (2): a. Amusement enterprises, commercial recreation and similar uses: One parking space for every four persons using or attending the facility; b. Automobile washing and cleaning establishments: (i) Full-service facilities require one parking space for each employee; (ii) Self-service facilities require two and one-half parking spaces for each washing bay; c. Barbershops and beauty salons: Two parking spaces for each barber chair or beautician's station; d. Banks, savings and loan offices and other financial institutions: One parking space for every 200 square feet of gross floor area; e. Bowling alleys and/or billiard halls: (i) Five parking spaces for each lane; (ii) Two parking spaces for each billiard table; f. Churches and other areas of assembly not specified in this chapter: (i) One parking space for every four fixed seats; (ii) One parking space for every 25 square feet of seating area within the main auditorium where there are no fixed seats; Note: Twenty-four linear inches of bench or pew shall be considered a fixed seat; Attachment: Attachment 1 EXHIBIT A Chapter_18.60___OFF_STREET_PARKING (REDLINED) (Off-Street Parking Amendment) #±¤ ³¤£Ÿ ʆʂʆʈŻʂʅŻʅʌ ʅʂŸʆʈŸʇʈ Ơ%34ơ (Supp. No. 14) Page 2 of 10 Packet Pg. 250 C.2.b g. Delicatessens, sandwich shops, retail bakeries, fast food restaurants that do not have a drive-through, and other establishments for the sale of food and beverages to be consumed either on or off the premises: (i) require Oone parking space for every 200 square feet of gross floor area (includes outdoor seating areas); (ii) Fast-food restaurants require one parking space for every 75 square feet of gross floor area (includes outdoor seating areas); h. Educational facilities: (i) Elementary and junior high schools require two parking spaces for each classroom; (ii) Senior high schools require one parking space for each employee and one parking space for every six students regularly enrolled; (iii) Colleges, universities and institutions of higher learning require one parking space for each employee and one parking space for every three students regularly enrolled; (iv) Trade schools, business colleges and commercial schools require one parking space for each employee and one parking space for every three students regularly enrolled; i. Drive-Through Fast Food Restaurants: (i) Fast food restaurants that are drive-through only (no dine in and no take-out/walk-up) require one parking space for every two employees on the largest shift; (ii) Fast food restaurants that are drive-through and dine-in require one-sparking space per 100 square feet of gross floor area; (iii) Fast food restaurants that are drive-through and take-out/walk-up with no dine-in seating require one parking space for every two employees and one space for every 200 square feet of outdoor seating/eating area; ij. Gas stations: (i) Three parking spaces; (ii) Plus two parking spaces for each service bay; (iii) Plus one parking space per 250 square feet of gross floor area for an ancillary retail store or restaurant component (iv) Plus no more than one parking space per fuel pump nozzle may be credited towards meeting off-street parking requirements; jk. Health clubs, spas and exercise studios: One parking space for every 150 square feet of gross floor area; kl. Hospitals: (i) One and three-quarters parking spaces for each bed; (ii) Convalescent hospitals, sanitariums and retirement facilities require one parking space for every four beds; lm. Motels and hotels: (i) One parking space for each guest unit; (ii) Two parking spaces for each employee; mn. Mortuaries and funeral homes: (i) One parking space for every 25 square feet of gross floor area; no. Motor vehicle sales and automotive repair: (i) One parking space for every 400 square feet of gross floor area; op. Offices: (i) General offices require one parking space for every 200 square feet of gross floor area; (ii) Medical, dental and veterinary offices/clinics require one parking space for every 200 square feet of gross floor area; pq. Residential and child care facilities: (i) One parking space for each employee; (ii) One parking space for the first six children or patients and one parking space for every four children or patients thereafter; qr. Restaurants, taverns and other establishments for the sale of food and beverages to be consumed primarily on the premises: One parking space for every one hundred square feet of gross floor area (includes outdoor seating areas); rs. Retail sales: (i) One parking space for every two hundred square feet of gross floor area; Attachment: Attachment 1 EXHIBIT A Chapter_18.60___OFF_STREET_PARKING (REDLINED) (Off-Street Parking Amendment) #±¤ ³¤£Ÿ ʆʂʆʈŻʂʅŻʅʌ ʅʂŸʆʈŸʇʈ Ơ%34ơ (Supp. No. 14) Page 3 of 10 Packet Pg. 251 C.2.b st. Skating rinks (ice or roller): (i) One parking space for every one hundred square feet of gross floor area; tu. Theaters: (i) One parking space for every four seats; (ii) One parking space for each employee. C. Manufacturing Uses. Warehousing and other facilities for which the primary purpose is the storage of goods: One parking space for every one thousand square feet of gross floor area. 2. Manufacturing and other facilities for which the purpose is the processing or assembly of goods: One parking space for every five hundred square feet of gross floor area. 3. Research and development: One parking space for every three hundred fifty square feet. D. Special Requirements. 1. Drive-thruthrough facilities; a. Each drive-through lane shall be separated from the circulation routes necessary for ingress and egress from the property, or access to any parking space. b. Each drive-through lane shall be clearly marked and maintained with directional arrows for the purpose of delineation. c. In order to facilitate proper review of a drive-thru facility and the adequacy of a proposed site design, the following information shall be required at the time of submittal for a conditional use permit and/or site and architectural review and shall contain the following information: (i) The nature of the product or service being offered; (ii) The method by which the order is processed; (iii) The time required to serve a typical customer; (iv) The arrival rate of customers; (v) The peak demand hours; (vi) The anticipated vehicular stacking requirements; d. Drive-through queueing areas shall be sized in accordance with the most current Informational Report of the Institute of Transportation Engineers (ITE) prepared by the ITE Technical Council Committee. e. A drive-through queueing analysis shall be prepared by a qualified traffic engineer and shall be subject to review by the City Engineer or their designee. f. No more than five drive-through queueing spaces shall be counted towards the total number of off-street parking spaces required for the business with the drive-through. g. At a minimum one 45-gallon trash can with a chute shall be placed near the exit of each drive through. 2. Handicapped spaces: At least one parking space or two percent of the required parking spaces, which ever is greater, shall be designated for use by the handicapped. Said parking spaces shall be identified in the manner required by the most current editions of the Uniform Building Code and the California Vehicle Code. Handicapped spaces shall count toward the total number of off- street parking spaces required. 3. Loading spaces. In addition to the number of parking spaces required for a specific use, all commercial and industrial uses shall provide loading spaces as follows: a. One loading space for the first five thousand square feet of gross floor area and one loading space for every ten thousand square feet of gross floor area thereafter up to forty- five thousand square feet of gross floor area; b. Each loading space shall be twelve feet in width and twenty feet in depth; Attachment: Attachment 1 EXHIBIT A Chapter_18.60___OFF_STREET_PARKING (REDLINED) (Off-Street Parking Amendment) #±¤ ³¤£Ÿ ʆʂʆʈŻʂʅŻʅʌ ʅʂŸʆʈŸʇʈ Ơ%34ơ (Supp. No. 14) Page 4 of 10 Packet Pg. 252 C.2.b c. Loading spaces shall be located in an area to provide easy access to the loading entrance of the use or uses it is to serve. Such loading entrances and loading spaces should be located in a manner so as not to interfere with pedestrian and/or vehicular traffic. 4. Bicycle Parking Facilities. All commercial and office uses may provide bicycle parking facilities in a location convenient to the necessitating use as follows: a. All bicycle parking facilities shall be of a design to allow the bicycle to be secured in an upright position and shall be in a designated location; b. Weatherproofing or facility covering should be used whenever possible; c. The placement and design of all bicycle parking facilities shall be approved by the planning department; 5. Shared parking. The pPlanning dDirector may allow a certain number of parking spaces to be designated as meeting the requirements of more than one use subject to the following conditions: a. A site-specific parking study prepared by a qualified traffic engineer shall be presented to the planning department demonstrating that substantial conflict will not exist between the peak hours of operations of the individual uses proposing to share the parking spaces; b. The number of shared parking spaces shall not exceed twenty percent of the required number of parking spaces for either designated use; c. The shared parking spaces shall be located on the same or adjacent parcel as the uses they are to serve and a convenient, visible pedestrian connection between the lots existsthey shall not be located more than two hundred fifty feet from said uses; d. A written agreement shall be executed, prior to establishing shared use of parking, by all parties concerned assuring the continued availability of the shared parking spaces. Said agreement shall be reviewed and approved by the Planning Director and/or City Engineer and shall be recorded on the title records of each affected property and filed with the San Bernadino County Office; e. The availability of parking for all affected properties is indicated by directional signs and the properties shall be within one thousand feet of each other. 6. Recreational vehicle/utility trailer parking and storage: a. Recreational vehicles/utility trailers when parked or stored on residential properties must be kept neat and clean at all times. Spider webs, debris, excessive dirt, weed accumulation on and under a recreational vehicle/utility trailer are prohibited at all times as are broken windows and flat tires. All recreational vehicles/utility trailers must be weather resistant at all times; b. All recreational vehicles/utility trailers when parked or stored on residential properties must display current vehicle registration tags. Those recreational vehicles/utility trailers not displaying current registration tags will be considered inoperable and must be removed from the public view which includes streets, sidewalks and adjacent properties; c. All covers and tarps or any other material employed to protect a recreational vehicle/utility trailer from the elements must be secured and must be weather proof; d. Rocks/bricks or other weighted items cannot be used to secure the weather proofing cover; Attachment: Attachment 1 EXHIBIT A Chapter_18.60___OFF_STREET_PARKING (REDLINED) (Off-Street Parking Amendment) #±¤ ³¤£Ÿ ʆʂʆʈŻʂʅŻʅʌ ʅʂŸʆʈŸʇʈ Ơ%34ơ (Supp. No. 14) Page 5 of 10 Packet Pg. 253 C.2.b e. All recreational vehicle/utility trailer parking and storage areas shall be properly maintained and kept free of weeds, mud and other debris; f. No recreational vehicle/utility trailer shall be parked or stored closer than ten and one-half feet to curb face. Where there is no curb, the ten and one-half feet shall be measured from the edge of the street pavement. No part of the recreational vehicle/utility trailer including all equipment and towing mechanisms, shall encroach into this ten and one-half feet; g. In no instance shall a recreational vehicle/utility trailer be parked or stored where any portion of the recreational vehicle/utility trailer blocks or overhangs the sidewalk within the public right-of-way; h. A recreational vehicle/utility trailer shall not be parked or stored where such parking or storage constitutes a clear and demonstrable traffic hazard and threat to public health and safety. Either the sheriff or city manager can, at their discretion, declare the parking or storage of a particular recreational vehicle/utility trailer to be a traffic hazard and require the immediate removal of the recreational vehicle/utility trailer; i. If a recreational vehicle/utility trailer is parked or stored on a portion of a driveway leading to the garage of the residence, the garage door must be fully operational which means it can be fully opened at all times; j. No recreational vehicle/utility trailer shall be parked or stored in the corner lot sideyard next to the street unless it complies with all other provisions of this section; k. All recreational vehicle/utility trailer must park perpendicular to the street except where they are parked on a curved or circular driveway; l. All recreational vehicles/utility trailers in the front yard or the sideyard must be parked or stored on an improved surface such as concrete, asphalt, laid brick, or other impervious material. Recreational vehicles/utility trailers parked in the backyard may be parked on gravel in lieu of an impervious surface; m. All paved areas including areas used for recreational vehicle/utility trailer parking and storage shall not exceed fifty percent of the lot area located between the front property line and the required front setback line of the residential zone and of the lot area located between the corner side property line and the required sideyard setback line of a corner lot; n. Recreational vehicles/utility trailers shall not be occupied for living purposes or be used as a storage container. Electrical hookups are prohibited except during loading and unloading or for the charging of batteries for no more than forty-eight consecutive hours per week. Sewer hookups are prohibited at all times; o. No recreational vehicle/utility trailer shall be parked or stored on a residential site for a period exceeding one month unless it is owned by the resident; p. No camper shells or cab-over-campers shall be stored in the frontyard or the corner sideyard of a corner lot other than on an operable and licensed pick-up truck parked in a lawful manner. Said camper shells or cab-over-campers may be stored unmounted in the interior sideyard or rearyard so long as they are screened in conformance with Section 18.73.200 of the Municipal Code; q. No boats or other watercraft shall be stored in the frontyard or sideyard other than on a validly licensed trailer parked in a lawful manner; Attachment: Attachment 1 EXHIBIT A Chapter_18.60___OFF_STREET_PARKING (REDLINED) (Off-Street Parking Amendment) #±¤ ³¤£Ÿ ʆʂʆʈŻʂʅŻʅʌ ʅʂŸʆʈŸʇʈ Ơ%34ơ (Supp. No. 14) Page 6 of 10 Packet Pg. 254 C.2.b r. No more than one recreational vehicle/utility trailer shall be parked in the frontyard or sideyard for any lot or parcel less than 20,000 square feet in size. A maximum of one additional recreational vehicle/utility trailer may be parked in the rearyard for any parcel less than 20,000 square feet. For parcels 20,000 square feet or larger, two recreational vehicles/utility trailers may be parked in the frontyard or sideyard. A maximum of two additional recreational vehicles/utility trailers may be parked in the rearyard for any parcel 20,000 square feet or larger; s. No second driveways or driveway approaches may be created or used for the purposes of parking or storing a recreational vehicle/utility trailer except where the lot is 100 feet wide or except where the second driveway would be on the side of a corner lot where there is no existing driveway or driveway approach. Any second driveway shall have the proper driveway approach requiring a public works permit; t. No recreational vehicle/utility trailer shall be parked on a public street if it is within 50 feet of any intersection or within 50 feet of any crosswalk; u. All non-motorized recreational vehicles/utility trailers must be attached to the tow vehicle if parked on a public street. Any owner of a detached, non-motorized recreational vehicle/utility trailer parked on the public street for any length of time will be subject to immediate citation and/or to the removal of the recreational vehicle/utility trailer at the owner's expense; v. No recreational vehicle/utility trailer shall be parked on a public street longer than 72 consecutive hours without being moved. The total number of days a recreational vehicle may be parked on a public street shall not exceed six days per month; w. Minor modifications or adjustments to this Section may be administratively approved by the Community Development Director by means of a recreational vehicle/utility trailer parking minor variance where conditions such as, but not limited to, lot size, lot configuration, house location, previous construction or improvements warrant a minor modification or adjustment. If the Community Development Director cannot make such a determination, the matter may be appealed to the City's Planning Commission with the appropriate appeal fee. In no instance shall a modification or adjustment be made to the provisions of this Section if it violates a safety concern/regulation of this Section. (Ord. No. 338 , § 14, 5-24-2022; Ord. No. 298 , § 12, 10-11-2016; Ord. No. 264, § 19, 6-12-2012 ; Ord. 210 § 3, 2004; Ord. 126 § 2, Exh. A(part), 1990) 18.60.040 Design standards. The following design standards are established to provide the minimum specifications for design, construction and maintenance of parking areas. A. Dimensions. Table 18.60.040 with its associated illustrations establishes the minimum dimensional requirements for parking areas in all districts, except in the case of "garage" parking spaces as required by this subsection for single-family dwelling units. Such a parking space shall be dimensioned as follows: A garaged parking space shall be ten feet in width and 20 feet in depth. B. Paving. 1. All parking areas shall be surfaced and maintained with asphaltic, concrete, or other permanent, impervious surfacing material so as to prevent mud, dust, loose material, and other nuisances. Attachment: Attachment 1 EXHIBIT A Chapter_18.60___OFF_STREET_PARKING (REDLINED) (Off-Street Parking Amendment) #±¤ ³¤£Ÿ ʆʂʆʈŻʂʅŻʅʌ ʅʂŸʆʈŸʇʈ Ơ%34ơ (Supp. No. 14) Page 7 of 10 Packet Pg. 255 C.2.b Alternate surface material may be approved by the planning commission or Site and Architectural Review Board. 2. Concrete wheel stops shall be placed two feet from the front end of the parking space. The resulting area between the wheel stop and the front end may be landscaped with a low growing ground cover material. This area should not to be included as part of any perimeter landscape area required in subsection E. 3. Parking spaces may include a maximum two-foot overhang into landscape areas provided that concrete wheel stops or curbs are provided, and the landscaping is appropriately designed to accommodate the vehicle overhang. 4. Accessible electric vehicle (EV) charging spaces with access aisle count as two standard parking spaces toward the total number of off-street parking spaces required. C. Lighting. 1. Lighting shall be designed to reflect away from residential districts and public roadways. 2. Light standards shall not exceed eighteen feet in height measured from the finished grade of the parking surface. 3. No lighting shall create illumination on an adjacent property which exceeds five footcandles (measured at ground level). D. Striping. 1. All parking spaces and loading spaces shall be clearly striped and maintained with double (hairpin) lines. Each of the lines shall be an equal nine inches from the sideline of the required parking space. Handicapped parking spaces shall be striped and individually identified in accordance with the Uniform Building Code and the California Vehicle Code. 2. All aisles, fire lanes, maneuvering areas and/or other specified non-parking areas shall be clearly marked and maintained with directional arrows and striping. E. Landscaping. Landscaping shall be required in all parking areas as follows: 1. A minimum of five percent of the parking area shall be landscaped; 2. The required landscaping shall consist of low growing ground cover materials, shrubs not to exceed three feet in height and one fifteen gallon tree for every five parking spaces. Once established, the required trees shall be trimmed in a manner to remove branches below the height of six feet from the parking surface; 3. Each parking area shall provide a perimeter landscape area around the perimeter of the parking area. The perimeter landscape area shall be a minimum of five feet in depth; 4. Each parking bay shall begin and end with a landscape planter. Landscape planters shall contain a minimum of seventy-five square feet of landscape area and the narrowest measurement from side to side shall be at least four feet; 5. One landscape planter shall be located approximately every ten parking spaces and there shall in no case be more than fifteen parking spaces in an uninterrupted row; 6. The required landscaping trees shall be located at the front end of the parking spaces at a rate of one tree for every five parking spaces; 7. In the case where two parking bays are adjacent to each other, tree wells shall be located at the front end of the parking spaces at the intervals as required above. The tree wells shall contain a Attachment: Attachment 1 EXHIBIT A Chapter_18.60___OFF_STREET_PARKING (REDLINED) (Off-Street Parking Amendment) #±¤ ³¤£Ÿ ʆʂʆʈŻʂʅŻʅʌ ʅʂŸʆʈŸʇʈ Ơ%34ơ (Supp. No. 14) Page 8 of 10 Packet Pg. 256 C.2.b minimum of sixteen square feet of landscape area and the narrowest measurement from side to side shall be at least four feet. 8. All landscaping areas, including landscape planters, perimeter landscape areas and tree wells shall be fully irrigated by an automatic sprinkler system, shall be separated from the paved parking surface by a six inch raised concrete curb or its equivalent and shall be kept in a clean, neat and healthy condition and the irrigation system in an adequate working order. 9. All parking areas shall be screened from view from public streets and adjacent less intensive uses by any one or combination of the following: a. Walls. Low profile walls, not to exceed three feet in height, which shall consist of stone, brick, decorative block or stuccoed block masonry materials. b. Fences (solid). A solid fence not to exceed three feet in height, which shall consist of wood, or wood and masonry or other similar materials which form an opaque screen. c. Fences (open). An open weave, or wrought iron fence not to exceed three feet in height which is combined with landscape materials to form an opaque screen. d. Landscaping. Landscaping materials, when maintained in a manner to create an opaque screen not to exceed three feet in height. The materials shall be of a size and variety so as to attain a minimum height of two feet, within eighteen months after installation. e. Berms. The mounding of soil not to exceed three feet in height. (Ord. 126 § 2, Exh. A(part), 1990) TABLE 18.60.040 DESIGN STANDARDS Design Element 0° 45° 90° A. Parking space width (minimum linear width) B. Parking space depth (minimum linear feet)* C. Aisle width (minimum linear feet) One-way Two-way D. Driveway width (minimum linear feet) residential commercial E. Perimeter landscape area depth (minimum linear feet) F. Parking bay width (minimum linear feet) Single loaded one-way two-way Double loaded one-way two-way G. Landscape planter Width (minimum linear feet) Area (minimum square feet) H. Tree well Attachment: Attachment 1 EXHIBIT A Chapter_18.60___OFF_STREET_PARKING (REDLINED) (Off-Street Parking Amendment) #±¤ ³¤£Ÿ ʆʂʆʈŻʂʅŻʅʌ ʅʂŸʆʈŸʇʈ Ơ%34ơ (Supp. No. 14) Page 9 of 10 Packet Pg. 257 C.2.b Width (minimum linear feet) Area (minimum square feet) *Parking stall depth can be reduced a maximum of two feet if an overhang is incorporated into landscape areas provided that concrete wheel stops or curbs are provided, and the landscaping is appropriately designed to accommodate the vehicle overhang. 18.60.050 Adjustments by pPlanning dDirector and City Engineer. The off-street parking requirements may be adjusted by the pPlanning dDirector snf/or City Engineer if supported by a site-specific parking study prepared by a qualified traffic engineer in the following instances: A. A minor relaxation of the parking requirements of this chapter may be granted by the pPlanning dDirector and/or City Engineer if it is determined that the adjustment is minor in nature, will be of benefit to the project and will not create a negative impact on existing or potential uses adjacent to or in the vicinity of the project. B. Requirements in addition to those of this chapter may be required by the pPlanning dDirector and/or City Engineer if it is determined that additional requirements are necessary, such as a parking management plan, to avoid a negative impact on existing or potential uses adjacent to or in the vicinity of the project. (Ord. 126 § 2, Exh. A(part), 1990) Attachment: Attachment 1 EXHIBIT A Chapter_18.60___OFF_STREET_PARKING (REDLINED) (Off-Street Parking Amendment) #±¤ ³¤£Ÿ ʆʂʆʈŻʂʅŻʅʌ ʅʂŸʆʈŸʇʈ Ơ%34ơ (Supp. No. 14) Page 10 of 10 Packet Pg. 258 C.2.c EXHIBIT B FINDINGS OF APPROVAL FOR ZONE CHANGE AMENDMENT 23-01 An Addendum to Section 18.60.030 (Parking Regulations) of Chapter 18.60 (Off-Street Parking) As required by Municipal Code Section §18.90.040 - Planning Commission Public Hearing and Recommendation, the Planning Commission/Site and Architectural Review Board shall hold a The Planning Commission/Site Architectural Review Board, after examination of the proposed Zone Change Amendment (ZCA) 23-01, which is included in redlined format EXHIBIT A this Resolution and incorporated herein by this reference, shall make its recommendation to the City Council based on the following findings: 1. Finding: The proposed amendment will not be detrimental to the health, safety, morals, comfort or general welfare of the persons residing or working within the neighborhood of the proposed amendment or within the City. Facts in Support of Finding: The Zone Change Amendment (ZCA) 23-01 to amend Section 18.60.030 (Parking Regulations) of Chapter 18.60 (Off-Street Parking) of the -01 is addressing drive-through fast- food restaurants, employee parking, gas stations, stacking/queuing among other changes to Section 18.60.030 is provided in EXHIBIT A of Attachment 1 (Planning Commission Resolution). There is no foreseeable detriment to the persons working or living within the City resulting from the proposed ZCA 23-01 Off-Street Parking modifications. 2. Finding: The proposed amendment will not be: Injurious to property or improvements in the neighborhood or within the City. Facts in Support of Finding: The Zone Change Amendment (ZCA) 23-01 to amend Section 18.60.030 (Parking Regulations) of Chapter 18.60 (Off-Street Parking) of the -01 is addressing drive-through fast- food restaurants, employee parking, gas stations, stacking/queuing among other changes to Section 18.60.030 is provided in EXHIBIT A of Attachment 1 (Planning Commission Resolution). There is no anticipated injurious fallout to property improvements within neighborhoods in the City as a result of the proposed ZCA 23-01 Off-Street Parking modifications. 3. Finding: The proposed amendment will be consistent with the latest adopted general plan. Facts in Support of Finding: of Grand Terrace addresses the administrative aspects of the Element. The Implementation Plan includes: Attachment: Attachment 1 - EXHIBIT B - Findings for PC Resolution for ZCA23-01 (Off-Street Parking Amendment) Code and its administration including determination of General Plan consistency and the development review process. Exhibit B Resolution No. 2024-03 Page 1 of 2 Packet Pg. 259 C.2.c Organizational Commitments such as interdepartmental coordination that is required for General Plan implementation and the budgeting for specific implementation programs. Funding programs and financial considerations of implementing specific General Plan policies and programs. -street n up- to-date Parking Ordinance in the Zoning Code. Specifically, Policy 3.3.2 of the Implementation Plan states: Review all new development projects for compliance with off-street parking standards of the Zoning Ordinance. Periodically review Zoning Ordinance parking standards compared to other jurisdictions to assure that adequate off-street parking is available for specific land uses. This Parking Ordinance is consistent with the spirit and intent of the Implementation Plan Goal 3.3 and Policy 3.3.2 in that is the City conducting a periodical review of the Zoning Code parking standards to assure that adequate off-street parking is available for specific land uses. Environmental Finding 4. Finding: A project is exempt from CEQA if the activity is covered by the commonsense exemption that CEQA applies only to projects which have the potential for causing a significant effect on the environment. Where it can be seen with certainty that there is no possibility that the activity in question may have a significant effect on the environment, the activity is not subject to CEQA. Facts in Support of Finding: The City of Grand Terrace has reviewed the proposed project pursuant to: 1) CEQA Guidelines Section 15002(k) General Concepts, the three- step process for deciding which document to prepare for a project subject to CEQA; and 2) CEQA Guidelines Section 15061 Review for Exemption, procedures for determining if the Zone Change Amendment project is exempt from CEQA. Since it can be seen with certainty that the proposed Zone Change Amendment (ZCA) 23-01 solely proposes to modify -residential off-street parking standards, it has no foreseeable potential to have a significant adverse effect on the environment. The City of Grand Terrace has determined that the proposed Zone Change Amendment (ZCA) 23-01 is considered to be exempt from CEQA pursuant to CEQA Guidelines Section 15061(b)(3) - because it does not involve any grading, demolition, or construction activities that will have a signifi parking standards found within the Zoning Code. It can be said with certainty that the Attachment: Attachment 1 - EXHIBIT B - Findings for PC Resolution for ZCA23-01 (Off-Street Parking Amendment) project will not have a significant effect on the environment. As such, the proposed project is exempt from CEQA, or not subject to CEQA, pursuant to CEQA Guidelines Section 15061(b)(3) Common Sense Exemption. Exhibit B Resolution No. 2024-03 Page 2 of 2 Packet Pg. 260