Loading...
HomeMy WebLinkAboutGT_ODS PC CC Workshop PPT 9-21-2026 (1)Multifamily Objective Design Standards (ODS) Joint Planning Commission and City Council Workshop September 21, 2026 Team Scott Hutter, Planning & Development Services Director Gabriel Arguelles, Associate Planner Michael Baker International City of Grand Terrace Cameron Savois, Project Manager Dan Wery, Senior Advisor 2 3 Agenda ODS Purpose & Application Review ODS Development Process Key Revisions Schedule & Next Steps 4 ODS Review: Purpose THE CITY MUST DEVELOP OBJECTIVE DESIGN STANDARDS (ODS) TO: Implement 6th Cycle Housing Element Update Program 13 Pursuant to SB 330, adopt objective design standards to ensure development standards, design guidelines, and findings are objective, promote certainty in the planning and approval process. Comply with State laws for multi-family housing 5 ODS Review: Purpose Establish objective criteria as a tool for the streamlined and ministerial review process to: Comply with recent State housing legislation •SB 167, SB 330, SB 35 Continue to enforce the City’s planning documents and enhance community character •Housing Element -Program 13, Land Use Element, Title 18 -Zoning Provide objective criteria for the review of multifamily residential and mixed-use development projects Create predictability in the review process Respond to demand for multifamily housing 6 ODS Applicability ●Does not apply to single family or Specific Plans 7 ODS Development Process Received and incorporated comments and feedback Staff input PC/CC Workshop #1 Coordination on zoning changes Review previous ODS approval process, standards, and work done by City Existing Regulatory Context Process Format Provide flexibility Graphics Best Practices Guidebook format New approval process New standards New graphics Revised Draft #2 Received and incorporated comments and feedback Staff input PC/CC Workshop #2 Full draft manual Images and graphics New standards for mixed-use & hotel Revised Draft #3 8 Topics Presented ●Purpose & applicability ●ODS development process ●Key revisions ○Approval process ○Manual format ○Organization ○New and revised standards August 25 Workshop Recap What We Heard? ●Why is the update necessary? ●Difference between having ODS as a guidebook vs in Zoning Code ●Avoid being too prescriptive. ●Include more graphics and images to avoid interpretation. ●Recommend remove chapter 2. 9 Key Revisions: Approval Process Ministerial Approval •100% compliance with all 150 design standards •Comply with all zoning standards Discretionary Approval •Site and Architectural Review in accordance with Chapter 18.63 Existing Process 10 Key Revisions: Approval Process Ministerial Approval 1.Comply with all 98 design standards 2.Comply with all zoning standards Discretionary Approval w/deviations •May deviate up to 8 dimensional design standards by no more than 20%. •PC shall only consider the requested deviations. •Must meet the findings (4) New Process 11 Key Revisions: Revised Standards –LEED LEED Costs ●Vivienda Manor Architect ○LEED Certification quotes ■$30k for LEED Consultant ■Through construction and LEED certification ●Assuming $200 sf construction costs and 1,000 sf/unit ○9 units: 9,000 sf X $200/sf = $1.8M -$30,000 / $1,800,000 = 1.6% ○12 units: 12,000 sf X $200/sf = $2.4M -$30,000 / $2,400,000 = 1.25% ○20 units: 20,000 sf X $200/sf = $4M -$30,000 / $4,000,0008 =≤ 1% 12 Key Revisions: Revised Standards –LEED Potential DUs Zone <15 16-25 26-50 >50 Total Parcels Total by Zone R2-10 26 2 0 0 28 4% (percent total lots)93%7%0%0%100% R3-12 449 3 4 5 461 59% (percent total lots)97%1%1%1%100% R3-20 0 1 0 0 1 0% (percent total lots)0%100%0%0%100% R3-40 158 19 7 5 189 24% (percent total lots)84%10%4%3%100% BR-MU (future)83 14 7 5 109 14% (percent total lots)76%13%6%5%100%100% Total Parcels 644 36 13 15 708 100% (percent total lots)91%5%2%2%100% 0 50 100 150 200 250 300 350 400 450 500 R2-10 R3-12 R3-20 R3-40 BR-MU (future) <15 16-25 26-50 >5013 Key Revisions: Revised Standards –LEED 28 parcels 4% of parcels 461 parcels 59% of parcels 1 parcel <1% of parcels 189 parcels 24% of parcels 109 parcels 14% of parcels 14 Options 1 ●Remove LEED requirement Options 2 ●Exempt projects with 15, 25, or 35 units ●Require Scorecard for projects with units between 15–35, or 25–45, or 35–55/units ●Require Certification for projects with more than 35, 45, or 55 of units Key Revisions: Revised Standards –LEED 15 Key Revisions: New Standards –Mixed Use Building Design ●Buildings must not exceed 200 feet in length on any side.●Separate building entrances shall be provided for residential and commercial uses.●Entrance to uses above the ground floor must be through lobby accessible from the street.●Commercial entries shall not be recessed more than 10 feet from the main façade. Open Space ●Outdoor dining may be permitted on public sidewalks outside retail frontages.●Outdoor seating and other pedestrian amenities must be provided. ●60% of the open space area shall be usable for active or passive recreation in the form of landscaped or hardscaped areas. Parking Structures ●Freestanding parking structures must have ground floor liner commercial space along the street frontage.●Parking structures are located behind residential, office, or commercial spaces. 16 Key Revisions: New Section –Commercial Ground Floor Design ●Minimum floor-to-ceiling height of 12 feet. ●Retail bays shall be 25 to 35 feet in width ●One entrance at each retail bay along the primary street frontage. ●Minimum depth of 55 feet. ●Incorporate a horizontal element at a minimum of 9 feet above sidewalk elevation for a minimum of 30 percent of building frontage. ●One canopy tree for every 25 feet of public- street-facing frontages. 12 ft 25-35 ft 9 ft 55 ft 17 Key Revisions: New Section –Horizontal Mixed Use ●Locate residential uses at the rear or side of the site. ●Separate residential parking areas from commercial parking areas. ●Screen surface commercial parking areas from residential. ●Orient commercial uses so there is direct line-of-sight into residential uses. ●All open space areas shall be linked by internal pathways. 18 Key Revisions: New Section –Hotels & Hospitality ●Back of house service areas shall be fully screened ●Public sidewalks shall be provided along all public road frontage. ●All hotel parking areas and hotel loading and service areas shall be screened. ●Exterior corridors are prohibited for buildings three stories or greater. ●Gated, fenced, or underground parking facilities, and gated exterior stairwells shall incorporate access control technology. 19 Next Steps & Schedule PLANNING COMMISSION HEARING NOVEMBER 5,2026 CITY COUNCIL HEARING DECEMBER 8, 2026 THANK YOU! We will now open the floor to questions.