2001-06 RESOLUTION NO. 2ooi-06
A RESOLUTION OF THE CITY COUNCIL OF THE
CITY OF GRAND TERRACE, STATE OF CALIFORNIA,
ADOPTING THE MEASURE "I" FIVE-YEAR
CAPITAL IMPROVEMENT PROGRAM
WHEREAS, San Bernardino County voters approved passage of Measure I in
November, 1989, authorizing San Bernardino Associated Governments, acting as the
San Bernardino County Transportation Authority, to impose a one-half of one percent
retail transactions and use tax applicable in the incorporated and unincorporated
territory of the County of San Bernardino, and
WHEREAS, revenue from the tax can only be used for transportation
improvement and traffic management programs authorized in the Expenditure Plans set
forth in Ordinance No. 89-1 of the Authority, and
WHEREAS, Expenditure Plans of the Ordinance require each local jurisdiction
receiving revenue from the tax to expend those funds pursuant to a Five-Year Capital
Improvement Program and a Twenty-Year Transportation Plan adopted by resolution of
the local jurisdiction, and
WHEREAS, the Twenty-Year Transportation Plan has been previously adopted,
and is on file with the Sam Bernardino Association of Governments (SANBAG), and
NOW, THEREFORE, BE IT RESOLVED that:
1) The City Council of the City of Grand Terrace, State of California,hereby adopts the
Measure I Five-Year Capital Improvement Program, a copy of which is attached to this
resolution.
2) In case of an emergency, such as flooding or other major necessary road expenses,these
funds could be reallocated.
i
NOW, THEREFORE, BE IT FURTHER RESOLVED that the City Council of the
City of Grand Terrace, State of California,hereby adopts the Measure I Five-Year Capital
Improvement Program
PASSED,APPROVED AND ADOPTED by the City Council of the City of Grand Terrace,
California at a regular meeting held on the 22nd day of March 2001:
ATTEST:
City Clerk of the City of and Terrace Mayor of the City of Grand Terrace,
and of the City Council thereof. And of the City Council thereof.
I, BRENDA STANFILL, City Clerk of the City of Grand Terrace, do hereby certify that the
foregoing Resolution was introduced and adopted at a regular meeting of the City Council of the
City of Grand Terrace held on the 22nd day of March, 2001, by the following vote:
AYES: Councilmembers Hilkey, Larkin, Ferre; Mayor Pro Tem Garcia and
Mayor Buchanan
NOES: None
ABSENT: None
ABSTAIN: None
Brenda Stanfill
City Clerk
Approved as to form:
4hh4A-,.._
City Attorney
WAUSERMCOMDEV\Steven C\tneasure I res 3-1-1.doc
-City of Grand Terrace
MEASURE I FIVE YEAR PLAN 2000/2005
(Adopted March, 2001)
-� YEAR, . ?, ��� STREET & LIMITS � tt INU�PRQUEMENT� � yCC?5T ESTIN[ATE ,
2000-03 Union Pacific Railroad Bridge at Barton Rd. Replacement and widening of $140,000
Bridge
2000-01 Michigan St. Upgrade to Major Highway
Barton Rd. to Commerce Way & Signal Relocation $105,000
Upgrade Barton Rd. to Major
2000-01 Barton Rd. at Vivienda Highway incl. sidewalks and
ADA ramp at the corner & $ 30,000
storm drain.
Mt. Vernon St. Upgrade to Secondary
2001-02 Grand Terrace Rd./Canal St. Highway w/raised median &
(City entry) to 300 ft. South City entry sign $196,000
2000-01 Minona Dr. Full Street Reconstruction $ 29,032
Kingston St. to Eton Dr.
2000-01 Holly St. Pavement Rehab - OS $ 31,589
Eton Dr. to Arliss Dr.
2000-01 Fairburn Dr. Full Street Reconstruction $ 55,186
Kingston St. to Miriam Way
2001-02 Arliss Ct. Full Street Reconstruction $ 13,569
Arliss Dr. to north end
i
YEARw STREET & LIM.ITS ` _IMPROVEMENT COST ES TIMATE . ;
2001-02 Arliss Dell Pavement Rehab. - OS $ 8,379
Arliss Dr. to north end
2001-02 Arliss Dr. Pavement Rehab. — OS $ 13,733
- Arliss Dell to Eton Dr.-
2001-02 Arliss Dr. Pavement Rehab. — OS $ 16,543
Preston St. to Arliss Dell
2001-02 Arliss Dr. Pavement Rehab. — OS $ 22,047
Eton Dr. to Arliss Way
2002-03 Michigan St. Full Street Reconstruction $ 15,880
Flamingo St. to Pico St.
2002-03 Michigan St. Pavement Rehab. — OS $78,541
Pico St. to Van Buren St.
2003-04 City-Wide Slurry Program 2 $ 90,000
2004-05 Raven Way Pavement Rehab. — OS $ 47,178
Wilmac Ave. to Oriole St.
2004-05 Raven Way Pavement Rehab. — OS $ 26,361
Michigan St. to Vivienda Ave.
2004-05 Vivienda Ave. Pavement Rehab. — OS $ 26,584
Tanager St. to Pico St.
TOTAL $945,622
Contact: Patrizia Materassi SANBAG's Measure I Revenue Estimate (5 yrs.) $ 849,022
909-430-2247 Fund Balance as of June 30, 2000 681,577
TOTAL $1,630,699
Notes: At least 30-50% of overall Measure I revenues shall be allocated to complete the City's General Plan Circulation Element
(transportation/traffic projects). The remaining 50-70% will be allocated to the Street Rehabilitation/Reconstruction Program.
1= Transportation/Traffic Projects
2= Max. expenditures of general program categories shall not exceed 50% of SANBAG's total annual forecast revenue for the
jurisdiction.
OS=-Overlay-with structural support
WAUSERS\COMDEV\Steven MEASURE 102-20-01.doc