Loading...
2018-01 RESOLUTION NO. 2018 - 01 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF GRAND TERRACE, STATE OF CALIFORNIA, AUTHORIZING THE SUBMITTAL OF THE 2017-18 CAPITAL IMPROVEMENT PLAN AND VISTA GRANDE WAY AS THE LIST OF PROJECTS PROPOSED TO BE FUNDED BY THE SB 1 ROAD MAINTENANCE AND REHABILITATION ACCOUNT (RMRA) WHEREAS, SB 1 (2017-2018, Beall) established a Road Maintenance and Rehabilitation Account to address deferred maintenance on the state highway system and on the local street and road system; and WHEREAS, SB 1 established requirements for holding local governments accountable for the efficient use of public funds to maintain public streets and roads; and WHEREAS, SB 1 requires that eligible cities submit a list of projects proposed to be funded with these funds pursuant to an adopted city budget to the California Transportation Commission per criteria and per a schedule established by the Commission. NOW, THEREFORE, BE IT RESOLVED that the Council of the City of Grand Terrace, State of California, hereby authorizes submittal of the City's Senate Bill (SB) 1 Proposed Project List Form as well as the adopted 2017-18 Capital Improvement Plan, a copy of which is attached to this resolution, as the list of projects proposed to be funded in part by the SB 1 Road Maintenance and Rehabilitation Account (RMRA). The attachment includes: project description, project location(s), proposed schedule and estimated useful life. The anticipated funding sources include: Measure 1 ($449,854), Gas Tax ($150,000), RMRA funds ($70,000), Cal Recycle Rubberized Pavement Grant ($68,484) and Maintenance of Efforts —General Fund ($50,000). PASSED, APPROVED AND ADOPTED by the City Council of the City of Grand Terrace at a regular meeting held on the 9th day of January 2018. arc M N e Mayor ATTEST: Debra L. Thomas, City Clerk 2018-01 CC Reso Page 1 of 1 January 09, 2018 Local Streets and Roads Funding Annual Reporting Program (Proposed Proiect List Form) This is the standard form that cities and counties are required to use when submitting a list of projects to the California'transportation Commission (Commission)for funding with Road Maintenance and Rehabilitation Account(RMRA)funds pursuanc to Streets and Highways Code Section 2034. The Proposed Project List Form consists of 3 worksheets: • Part 1—General Information (Input required) • Part 2—Project Information (Input required) • Part 3—Summary (Review only) Parts 1&2 are input pages. Both Required and Optional fields are provided for entering information: • Required input fields(*)are highlighted in yellow and must be filled out completely. • Optional input fields are not highlighted and should be completed as thoroughly as possible. • Input field titles with(?)include comments with explanations and examples which can be viewed by hovering the cursor over the title. Part 3 is a review page. Grayed-out fields are self-populated by information entered in Parts 1&2. No input is needed in this page. Steps to complete & submit Form 1. Save and rename this Excel workbook file with your Agency name (i.e. LSR—Project List—Agency name) 2. Complete"Part 1-General Information"and save worksheet 3. Complete"Part 2—Project Information"and save worksheet 4. Review"Part 3 Summary"for completeness S. Email the completed Excel file along with the required Budget Support Documentation to the Commission(ISR@dot.ca.gov)by October 16,2017 Questions regarding the form can be emailed to: ISR@dot.ca.gov STATE OF CALIFORNIA• CALIFORNIA TRANSPORTATION COMMISSION Senate Bill (SB) 1 Proposed Project List Form Part 1: General Information Local Streets and Roads Program *Agency Name: (Select from dropdown list) LoCode: Grand Terrace S421 *Agency Address: City: *ZIP Code: 22795 BARTON ROAD GRAND TERRRACE I CA 192313 "Agency Contact: -Agency Contact Title: ALAN FRENCH PUBLIC WORKS DIRECTOR/CITY ENGINEER *Agency Contact Phone No.: (i e. 1234567890) *Agency Contact Email Address: (909) 824-6621 afrench@grandterrace-ca.gov Funding for Fiscal Year: I FYI 17/18 *Budget Support Documentation:? Please briefly describe the budget support documentation being provided. An excerpt from the City of Grand Terrace regular operating/capital improvement budget including relevant list of projects and an adopting resolution were provided with September 2017 submittal to CTC.The January 2018 submittal to the CTC includes adopting resolution for detailed project list. (Month) (Year) Average Network PCI: 62 Measurement Date: 02 2016 Additional Information: ? Project Flexibility: Pursuant to SHC Section 2034(a)(1),this project list shall not limit the flexibility of an eligible city or county to fund projects in accordance with local needs and priorities, so long as the projects are consistent with SHC Section 2030(b).After submittal of the project list to the Commission,in the event a city or county elects to make changes to the project list pursuant to the statutory provision noted above,formal notification of the Commission is not required. However,the Project Expenditure Report form that is due to the Commission by October 1st each year, will provide an opportunity for jurisdictions to annually communicate such changes to the Commission as part of the regular reporting process. * Required information B.S.b STATE OF CALIFORNIA•CALIFORNIA TRANSPORTATION COMMISSION Senate Bill(S81 I Proposed Project List Form Part Z: Proiect_Information OLocal Streets and Roads Program 'Required vs c 'Estimated Additional Project Elements Project Type •Estimated (Does the project include element(s)as described in SHC 2030(c)-(q? = ? Compiet;on Date Useful Life Legislative District(s) ISelttt YIN from dropdowr list) ILL oraposed •Project Title la of Yrl .r Project Lo[ode Project ID •Project Description •Project Location ? C_ (if any) Explanation 7 ? Com (PPa Type f"Other"is selected, Pre Climate plete YP (' Construction State Sustainability Technologies Streets Description of Construction Min. May. State Senate Change V JSei.t from dropdown stl please explain) Imm/ Imm/yyyyl Assembly 7 ? ? Elements Elements Q ? ? C PPOI 5421 Grind and Overlay 2 S' Year 2 Road Maintenance& Grind and overlay 2.5'asphat concrete of street sectloc Arliss Lane from cut de sac to Arliss Drive Sidewalk,curb.and 2 Asphalt Concrete Rehabditatlon 03/2016 OS/2016 15 20 20 47 Yes No No Yes i. utter repa r tp Grind and Overlay 2.5' Year 2 Road Maintenance& Grind and overta 2.5"as haltconcrete of street section MtClarren Street fmrn Vivienda Avenue to PP02 5421 y p 0312018 05/2018 15 20 20 47 Yes No No Yes Sidewalk,curb and _ Asphalt Concrete Rehatsilitatlon Canal Street utter re pa r Grind and Overlay 2.5' Year I Road Maintenance& Grind and overlay 2.5'asphalt concrete of street section Orangewood Spurt freers Observat=n orve Sidewalk,curb and M PF03 5421 Asphalt Concrete Rehabilitation to end of street 03/2018 0512028 15 20 20 47 Yes No No Yes gutter re ar Qt PP04 5421 Grind and Overlay 2 5' Year 2 Road Maintenance& Grind and overlay 2.5'asphalt tancrete of street section Mavis Street from Marhigan Avenue to Sidewalk,curb and Asphalt Concrete Rehabilitation Vivienda Avenue o3/2018 05/2916 15 2D 20 47 Yes No Na Yes .n utter re pa r C PPOS 5421 Grind and Overlay 2 5' Year 2 Road Maintenance& Grind and overlay 2.5"asphalt roncrete of street section Vivienda Avenue from cut de sae to Van Sidewalk,curb and to AS halt Concrete Rehabilitation 03/2018 05/2018 15 20 20 47 Yes No Na Yes Buren Street utter re r 0) Grind and Overlay 2.S' Year 2 !load Maintenance& Grind and overlay 2 S'asphalt concrete of street section Dos Rios Avenue from Country Club Lane to Sidewalk,curb and V PP06 54ZI 0312018 O5/2018 15 20 20 47 Yes No No Yes C As halt Concrete Rehabilitation De Berry Street utter repa r tp PP07 5421 Grind and Overlay 2.5' Year 2 {toad Maintenance& Grind and overlay 2.5'asphalt eancrete of street section Franklin Street from Mirada Avenue to Mt Sidewalk,curb and C 03/2018 05/2018 15 20 20 47 Yes No No Yes Asphalt Concrete Rehabilitation Vernon Avenue utter repa r C PPOB S421 Grind and Overlay I S' Year 2 Road Maintenance& Grind and overay 2.5"asphalt concrete of street section Arliss lane from Arliss Drive to cut de sac 03/2018 D5/2018 15 20 20 41 Yes No No Yes Sidewalk,curb and Asphalt Concrete Rehabilitation titter reps r PPD9 5421 Slurry Seal Year 2 Road Maintenance& Slurry seal asphalt concrete street section Pascal Avenue from De Berry Street to cut Sidewalk,curb and -� 03/2019 05/2016 7 15 20 47 Yes No Na Yes Rehabilitation de sat utter repa r C PP30 5421 Slurry Seal Year 2 Road Maintenance& S urry seal asphalt concrete street section Arliss Way from cal de sac to Arliss Drive Sidewalk,curb and Rehabilitation 03/2018 05/2018 7 15 20 47 Yes No No Yes IX utter repa r L. Slurry Seal Year 2 Road Maintenance& S urry seal asphalt Concrete street section Eton Drive from Thames Street to Preston Sidewalk,curb and C Plitt 5421 Rehabilitation Street 03/2018 OS/2016 7 15 20 47 Yes Na No Yes 'a' utter reps r C /~ PP12 5421 Slurry Seal Year 2 Road Maintenance& S urry seal asphalt concrete street se_tlon Glendora Drive from Barton Road to end of Sidewalk,curb and O Rehabilitation street 03/2018 05/2018 7 15 ID 47 Yes Na No Yes utter re w r Slurry Seal Year 2 Road Malr4enance& Slurry seal asphalt concrete street section Palm Court from Palm Avenue to,rul de sac Sidewa r.curb and PP13 5421 Rehabilitation 03/2018 OS/2018 7 15 20 47 Na No Yes C utter re pa r N Slur Seal Year 2 Road Maintenance& Stu"seal asphalt concrete street section W.Litton Avenue from S.Rosedale Avenue d PP14 5021 ry p ry p Sidewalk,curb and Rehabilitation to S.La Gdena Drive 03/2018 05120I8 7 15 20 47 No Na Yes gutter repair IX PPLS 5421 Slurry Sea! Year 2 Road Maintenance& Slurry seal asphalt concrete street section Mlr!am Way from Arliss Dr ve to Kingston Sidewalk,curb and Iti Rehabilitation Street 03/2018 05/2018 7 IS 20 47 No No Yes utter repair � Slurry Seal Year 2 Road Maintenance& Na Yes Slurry sea!asphalt concrete street section Robin Way from Warbler Avenue to Oriole Sidewalk,curb and C] PP16 5421 Rehabilitation Avenue 03/2019 05/20I8 7 15 20 47 N. r utter repair PPI7 542I Slurry Seal Year 2 Road Maintenance& Slurry seal asphalt concrete street section Vivienda Avenue from Terrace Avenue to Sidewalk curb and 03/2018 05/2018 7 15 20 47 Ye No Na Yes Rehabilitation Maple Avenue gutter repair � PPla 5421 Slurry Seal Year 2 Road Maintenance& Slurry seal asphat concrete street section Honey Hill Drive from Westwood Street to Sidewalk,curb and Rehabilitation palm Avenue 03/2018 05/2018 7 is 20 47 Yes No N- Yes L. otter repair s- Slu Seal Year 2 Road Maintenance& Slur seal asphalt concrete street section Jensen Court from cull de sac west end to rtY Slurry p Sidewalk.curb and PP19 5421 Rehabilitation Observation Drive 03/2018 05/2018 7 15 20 47 Yes No No Yes gutter repair � PP20 5421 Slurry Seal Year 2 Road Maintenance& Slurry seal asphalt concrete street section De Soto Street from K ngston Street to Do Sidewalk,cl.rb and Rehabilitation Rios Avenue 03/2018 05/2018 7 15 20 47 Yes No No Yes ` otter repair Slurry Seal Year 2 Road Maintenance& Slurry seal asphalt concrete street section _ark Street from Reed Avenue to cut de sac Sidewalk,curb and PP21 S421 slum 03/2018 05/2018 7 15 20 47 Yes No No Yes �..I Otter repair V! Slurry Seal Year 2 Road Maintenance& Slurry seal asphalt concrete street section S skin Court from Paradise Street to Cu de Sidewalk.curb and PP22 5421 03/2016 05/2018 7 15 20 47 Yes No No Yes Rehabilitation sat utter repair PP23 5421 Slurry Seat Year 2 Road Maintenance& Slurry seal asphalt concrete street section Wlllet Avenue from Mavis Street to Van Sidewalk,curb and C] Rehabilitation Buren Street 03/2028 05/2018 7 1s 20 47 Yes No No Yes 01 utter repair '� PP24 5421 Slurry Seal Year 2 Road Maintenance& Slurry seal asphalt concrete street section Dutch Street from Pico Street to Tanager Sldcwalk,curb and11- Rehabilitation Street 0312013 05/2018 7 15 20 47 Yes No No Yes b gutter repair J PP2S S421 Slurry Seal Year 2 Road Maintenance& Slurry seal asphalt concrete street section Dos Rios Avenue from Palm Avenue to Sidewalk,curb and 1L 0312018 OS/Zola 7 15 20 47 Yes Na No Yes Rehabilitation Count Club Lane utter repair � Slurry Seal Year 2 R.-ad Maintenance& Slurry seal asphalt concrete street section Rosedale Avenue from Paim Avenue to CL Sidewalk,curb and J PP26 5421 03/201B 05/2018 7 15 20 47 Yes No No Y ;.; Rehabilitation (South) es utter repair C PP27 Sal Slurry Seal Year 2 Road Maintenance& Slurry seal asphalt concrete street section Arlos Drive from Preston Street to end of 03/2018 05/2018 7 15 20 47 Yes No No Yes Sidewalk,curb and Rehabilitation street gutter re air Slurry Seal Year 2 Road Maintenance& Slurry seal asphalt concrete street section Mirada Avenue from P-co Street to Laden Sidewalk,curb and L PP28 5421 Rehabilitation Street 03/2018 OS/2018 7 15 20 47 Yes No No Yes W utter repair � PP29 5421 Slurry Seal Year 2 Road Maintenance& Slurry seal asphalt concrete street section flamingo Street from M c-tiigan Aye"ue tc Sidewalk,curb and Q Rehabilitation cut de sac 03/2015 DS/2016 7 15 20 47 Yes No No Yes utter repair PP30 S421 Slurry Seal Year 2 Road Maintenance& Slurry seal asphalt concrete street section Nandina Street from Preston Street to Sidewalk,curls and Rehab.litatlon Cana Court 03/2018 OS/2018 7 15 20 47 Yes No No Yes Canary utter repair PP31 S411 Slurry Seal Year 2 Road Maintenance& Slurry seal asphalt concrete street section Pasral Avenue from Victoria Street tr. Sidewalk,curb and Rehat1,station Car-art Avenue 03/2DI8 OS/2018 7 I5 20 4T Yes No No Yes utter re air 3of7 Packet Pg. 330 B.S.b STATE OF CAUFORNIA•CAUFORNIA TRANSPORTATION COMM SSION Senate Bill ISBI 1 Proposed Project List Form Part 2: Project Information Local Streets and Roads Program O Required 'Estimated Additional Project Elements ca Project Type •Estimated (Does the project include element(s)as described In 5HC 2030(c)-(47 = p Completion Date Useful Life Legislative Districts) 3 (a of Yr) (Select Y/N from dropdown listl U- Proposed •Project Title T " Project Wad* Project ID 'Project Description 'Project Location C (il any) Explanation 3 4 Complete O (PPN) Pre- Climate CS Type (If"Other"is selected, Construction Min. Max. State Senate Change Construction State Sustainability Technologies Streets Description of ti V (Select from dropdown Intl please explain) YYY (mm/Ymd (mm/YI Assembly Q Elements Elements a 9 ? _ PP32 5921 Slurry Seal Year 2 Road Maintenance& Slurry seal asphalt concrete street section Royal Avenue from Pico Street to end of Sidewalk,curb and .203/20I8 05/20I8 7 15 IO 47 Yes No No Yes Rehabilitation street Siutter repair ram+ Grind and Overlay 2.5" Year 2 Addition Road Maintenance& Grind and overlay 2.5"asphalt concrete of street section Vista Grande Way from Grand Terrace Road Sidwalk,curb and PP33 5421 Asphalt Concrete Rehabilitation to north end of Dog Park(approximately 0312018 05/2018 15 20 20 47 Yes No No Yes gutter repair .1] 400 LF) Itj .0 PP34 S421 PP35 5421 13 PP36 5421 C PP37 5421 R PP38 5421 t7 PP39 5421 C PP40 5421 C PP41 5421 y PP42 S421 C PP43 S421 .M PIS" 5421 PP45 S421 PP46 MI O PP47 5421 PP48 5421 PP49 S421 w ISM S4I1 tC O {�f] N d v ti r e0 r t�l r d ti td L L L R rL� V i I N J w I c1 a O L a W� U) J i.. C G7 Ir t t� liT a 4 of 7 Packet Pg. 139 �.8.b STATE OF CALIFORNIA• CALIFORNIA TRANSPORTATION COMMISSION Senate Bill SB 1 Proposed Project List Form Local Streets and Roads Program Agency Name: Agency Contact: U- ALAN FRENCH FY o Grand Terrace (909)824-6621 a 17/18 = RLoCode: 5421 afrench@grandterrace-ca.gov w Summary of Proposed Project List 43 Estimated Completion Date Estimated Project (mm/dd/yyyy) Useful Life No Project Title Project Description Project Location (#of yrs) Pre Construction Min. Max. c Construction R PPOl Grind and Overlay 2.5"Asphalt Grind and overlay 2.5"asphalt concrete of street section Arliss Lane from cul de sac to Arliss Drive 03/2018 05/2018 15 20 -a Concrete tv PP02 Grind and Overlay 2.5"Asphalt Grind and overlay 2.5"asphalt concrete of street section McClarren Street from Vivienda Avenue to 03/2018 05/2018 15 20 Concrete CanaL5treejo Grind and Overlay 2.5"Asphalt Grind and overlay 2.5"asphalt concrete of street section Orangewood Court from Observation Drive c O PP03 03/2018 05/2018 15 20 0 Concre a to end of street ;r Grind and Overlay 2.5"Asphalt Grind and overlay 2.5"asphalt concrete of street section Mavis Street from Michigan Avenue to PP04 03/2018 05/2018 15 20 0 Concrete Viviencla Avenue y Grind and Overlay 2.5"Asphalt Grind and overlay 2.5"asphalt concrete of street section Vivienda Avenue from cul de sac to Van PP05 03/2018 05/2018 15 20 Concrete B ren ree Grind and Overlay 2.5"Asphalt Grind and overlay 2.5"asphalt concrete of street section Dos Rios Avenue from Country Club Lane to PP06 onaete De Ber ree 03/2018 05/2018 15 20 N Grind and Overlay 2.5"Asphalt Grind and overlay 2.5"asphalt concrete of street section Franklin Street from Mirado Avenue to Mt_ PP07 03/2018 05/2018 15 20 m Concrete Vernon Avenue PP08 Grind and Overlay 2.5"Asphalt Grind and overlay 2.5"asphalt concrete of street section Arliss Lane from Arliss Drive to cul de sac 03/2018 05/2018 15 20 a� Concrete � PP09 Slurry Seal Slurry seal asphalt concrete street section Pascal Avenue from De Berry Street to cul 03/2018 05/2018 7 15 = �a PP10 ISlurry Seal Slurry seal asphalt concrete street section Arliss Way from cuI de sac to Arliss Drive 03/2018 05/2018 7 1 15 c9i PP11 Slurry Seal Slurry seal asphalt concrete street section Eton Drive from Thames Street to Preston 03/2018 05/2018 7 1 15 n PP12 Slurry Seal Slurry seal asphalt concrete street section Glendora Drive from Barton Road to end of 03/2018 05/2018 7 1 15 -i cs PP13 Slurry Seal Slurry seal asphalt concrete street section Palm Court from Palm Avenue to cul de sac 03/2018 05/2018 7 15 PP14 Slurry Seal Slurry seal asphalt concrete street section W.Litton Avenue from S.Rosedale Avenue 03/2018 05/2018 7 15 PP15 Slurry Seal Slurry seal asphalt concrete street section Miriam Way from Arliss Drive to Kingston 03/2018 05/2018 7 15i PP16 Slurry Seal Slurry seal asphalt concrete street section Robin Way from Warbler Avenue to Oriole 03/2018 05/2018 7 15 -r PP17 Slurry Seal Slurry seal asphalt concrete street section Vivienda Avenue from Terrace Avenue to 03/2018 05/2018 7 15 = m PP19 Slurry Seal Slurry seal asphalt concrete street section Honey Hill Drive from Westwood Street to 03/2018 05/2018 7 15 PP14 Slurry Seal Slurry seal asphalt concrete street section Jensen Court from cul de sac west end to 03/2018 05/2018 7 15 PP20 Slurry Seal Slurry seal asphalt concrete street section De Soto Street from Kingston Street to Do 03/2018 05/2018 7 15 a O PP21 Slurry Seal Slurry seal asphalt concrete street section Lark Street from Reed Avenue to cul de sac 03/2018 05/2018 7 15 PP22 ISlurry Sea! ISlurry seal asphalt concrete street section Siskin Court from Paradise Street to cul de 03/2018 05/2018 7 15 5 of 7 Packet Pg.132 B.S.b STATE OF CALIFORNIA•CALIFORNIA TRANSPORTATION COMMISSION Senate Bill(S81 I Proposed Project List Form Part Z: Proiect_Information OLocal Streets and Roads Program 'Required vs c 'Estimated Additional Project Elements Project Type •Estimated (Does the project include element(s)as described in SHC 2030(c)-(q? = ? Compiet;on Date Useful Life Legislative District(s) ISelttt YIN from dropdowr list) ILL oraposed •Project Title la of Yrl .r Project Lo[ode Project ID •Project Description •Project Location ? C_ (if any) Explanation 7 ? Com (PPa Type f"Other"is selected, Pre Climate plete YP (' Construction State Sustainability Technologies Streets Description of Construction Min. May. State Senate Change V JSei.t from dropdown stl please explain) Imm/ Imm/yyyyl Assembly 7 ? ? Elements Elements Q ? ? C PPOI 5421 Grind and Overlay 2 S' Year 2 Road Maintenance& Grind and overlay 2.5'asphat concrete of street sectloc Arliss Lane from cut de sac to Arliss Drive Sidewalk,curb.and 2 Asphalt Concrete Rehabditatlon 03/2016 OS/2016 15 20 20 47 Yes No No Yes i. utter repa r tp Grind and Overlay 2.5' Year 2 Road Maintenance& Grind and overta 2.5"as haltconcrete of street section MtClarren Street fmrn Vivienda Avenue to PP02 5421 y p 0312018 05/2018 15 20 20 47 Yes No No Yes Sidewalk,curb and _ Asphalt Concrete Rehatsilitatlon Canal Street utter re pa r Grind and Overlay 2.5' Year I Road Maintenance& Grind and overlay 2.5'asphalt concrete of street section Orangewood Spurt freers Observat=n orve Sidewalk,curb and M PF03 5421 Asphalt Concrete Rehabilitation to end of street 03/2018 0512028 15 20 20 47 Yes No No Yes gutter re ar Qt PP04 5421 Grind and Overlay 2 5' Year 2 Road Maintenance& Grind and overlay 2.5'asphalt tancrete of street section Mavis Street from Marhigan Avenue to Sidewalk,curb and Asphalt Concrete Rehabilitation Vivienda Avenue o3/2018 05/2916 15 2D 20 47 Yes No Na Yes .n utter re pa r C PPOS 5421 Grind and Overlay 2 5' Year 2 Road Maintenance& Grind and overlay 2.5"asphalt roncrete of street section Vivienda Avenue from cut de sae to Van Sidewalk,curb and to AS halt Concrete Rehabilitation 03/2018 05/2018 15 20 20 47 Yes No Na Yes Buren Street utter re r 0) Grind and Overlay 2.S' Year 2 !load Maintenance& Grind and overlay 2 S'asphalt concrete of street section Dos Rios Avenue from Country Club Lane to Sidewalk,curb and V PP06 54ZI 0312018 O5/2018 15 20 20 47 Yes No No Yes C As halt Concrete Rehabilitation De Berry Street utter repa r tp PP07 5421 Grind and Overlay 2.5' Year 2 {toad Maintenance& Grind and overlay 2.5'asphalt eancrete of street section Franklin Street from Mirada Avenue to Mt Sidewalk,curb and C 03/2018 05/2018 15 20 20 47 Yes No No Yes Asphalt Concrete Rehabilitation Vernon Avenue utter repa r C PPOB S421 Grind and Overlay I S' Year 2 Road Maintenance& Grind and overay 2.5"asphalt concrete of street section Arliss lane from Arliss Drive to cut de sac 03/2018 D5/2018 15 20 20 41 Yes No No Yes Sidewalk,curb and Asphalt Concrete Rehabilitation titter reps r PPD9 5421 Slurry Seal Year 2 Road Maintenance& Slurry seal asphalt concrete street section Pascal Avenue from De Berry Street to cut Sidewalk,curb and -� 03/2019 05/2016 7 15 20 47 Yes No Na Yes Rehabilitation de sat utter repa r C PP30 5421 Slurry Seal Year 2 Road Maintenance& S urry seal asphalt concrete street section Arliss Way from cal de sac to Arliss Drive Sidewalk,curb and Rehabilitation 03/2018 05/2018 7 15 20 47 Yes No No Yes IX utter repa r L. Slurry Seal Year 2 Road Maintenance& S urry seal asphalt Concrete street section Eton Drive from Thames Street to Preston Sidewalk,curb and C Plitt 5421 Rehabilitation Street 03/2018 OS/2016 7 15 20 47 Yes Na No Yes 'a' utter reps r C /~ PP12 5421 Slurry Seal Year 2 Road Maintenance& S urry seal asphalt concrete street se_tlon Glendora Drive from Barton Road to end of Sidewalk,curb and O Rehabilitation street 03/2018 05/2018 7 15 ID 47 Yes Na No Yes utter re w r Slurry Seal Year 2 Road Malr4enance& Slurry seal asphalt concrete street section Palm Court from Palm Avenue to,rul de sac Sidewa r.curb and PP13 5421 Rehabilitation 03/2018 OS/2018 7 15 20 47 Na No Yes C utter re pa r N Slur Seal Year 2 Road Maintenance& Stu"seal asphalt concrete street section W.Litton Avenue from S.Rosedale Avenue d PP14 5021 ry p ry p Sidewalk,curb and Rehabilitation to S.La Gdena Drive 03/2018 05120I8 7 15 20 47 No Na Yes gutter repair IX PPLS 5421 Slurry Sea! Year 2 Road Maintenance& Slurry seal asphalt concrete street section Mlr!am Way from Arliss Dr ve to Kingston Sidewalk,curb and Iti Rehabilitation Street 03/2018 05/2018 7 IS 20 47 No No Yes utter repair � Slurry Seal Year 2 Road Maintenance& Na Yes Slurry sea!asphalt concrete street section Robin Way from Warbler Avenue to Oriole Sidewalk,curb and C] PP16 5421 Rehabilitation Avenue 03/2019 05/20I8 7 15 20 47 N. r utter repair PPI7 542I Slurry Seal Year 2 Road Maintenance& Slurry seal asphalt concrete street section Vivienda Avenue from Terrace Avenue to Sidewalk curb and 03/2018 05/2018 7 15 20 47 Ye No Na Yes Rehabilitation Maple Avenue gutter repair � PPla 5421 Slurry Seal Year 2 Road Maintenance& Slurry seal asphat concrete street section Honey Hill Drive from Westwood Street to Sidewalk,curb and Rehabilitation palm Avenue 03/2018 05/2018 7 is 20 47 Yes No N- Yes L. otter repair s- Slu Seal Year 2 Road Maintenance& Slur seal asphalt concrete street section Jensen Court from cull de sac west end to rtY Slurry p Sidewalk.curb and PP19 5421 Rehabilitation Observation Drive 03/2018 05/2018 7 15 20 47 Yes No No Yes gutter repair � PP20 5421 Slurry Seal Year 2 Road Maintenance& Slurry seal asphalt concrete street section De Soto Street from K ngston Street to Do Sidewalk,cl.rb and Rehabilitation Rios Avenue 03/2018 05/2018 7 15 20 47 Yes No No Yes ` otter repair Slurry Seal Year 2 Road Maintenance& Slurry seal asphalt concrete street section _ark Street from Reed Avenue to cut de sac Sidewalk,curb and PP21 S421 slum 03/2018 05/2018 7 15 20 47 Yes No No Yes �..I Otter repair V! Slurry Seal Year 2 Road Maintenance& Slurry seal asphalt concrete street section S skin Court from Paradise Street to Cu de Sidewalk.curb and PP22 5421 03/2016 05/2018 7 15 20 47 Yes No No Yes Rehabilitation sat utter repair PP23 5421 Slurry Seat Year 2 Road Maintenance& Slurry seal asphalt concrete street section Wlllet Avenue from Mavis Street to Van Sidewalk,curb and C] Rehabilitation Buren Street 03/2028 05/2018 7 1s 20 47 Yes No No Yes 01 utter repair '� PP24 5421 Slurry Seal Year 2 Road Maintenance& Slurry seal asphalt concrete street section Dutch Street from Pico Street to Tanager Sldcwalk,curb and11- Rehabilitation Street 0312013 05/2018 7 15 20 47 Yes No No Yes b gutter repair J PP2S S421 Slurry Seal Year 2 Road Maintenance& Slurry seal asphalt concrete street section Dos Rios Avenue from Palm Avenue to Sidewalk,curb and 1L 0312018 OS/Zola 7 15 20 47 Yes Na No Yes Rehabilitation Count Club Lane utter repair � Slurry Seal Year 2 R.-ad Maintenance& Slurry seal asphalt concrete street section Rosedale Avenue from Paim Avenue to CL Sidewalk,curb and J PP26 5421 03/201B 05/2018 7 15 20 47 Yes No No Y ;.; Rehabilitation (South) es utter repair C PP27 Sal Slurry Seal Year 2 Road Maintenance& Slurry seal asphalt concrete street section Arlos Drive from Preston Street to end of 03/2018 05/2018 7 15 20 47 Yes No No Yes Sidewalk,curb and Rehabilitation street gutter re air Slurry Seal Year 2 Road Maintenance& Slurry seal asphalt concrete street section Mirada Avenue from P-co Street to Laden Sidewalk,curb and L PP28 5421 Rehabilitation Street 03/2018 OS/2018 7 15 20 47 Yes No No Yes W utter repair � PP29 5421 Slurry Seal Year 2 Road Maintenance& Slurry seal asphalt concrete street section flamingo Street from M c-tiigan Aye"ue tc Sidewalk,curb and Q Rehabilitation cut de sac 03/2015 DS/2016 7 15 20 47 Yes No No Yes utter repair PP30 S421 Slurry Seal Year 2 Road Maintenance& Slurry seal asphalt concrete street section Nandina Street from Preston Street to Sidewalk,curls and Rehab.litatlon Cana Court 03/2018 OS/2018 7 15 20 47 Yes No No Yes Canary utter repair PP31 S411 Slurry Seal Year 2 Road Maintenance& Slurry seal asphalt concrete street section Pasral Avenue from Victoria Street tr. Sidewalk,curb and Rehat1,station Car-art Avenue 03/2DI8 OS/2018 7 I5 20 4T Yes No No Yes utter re air 3of7 Packet Pg. 330 B.S.b STATE OF CAUFORNIA•CAUFORNIA TRANSPORTATION COMM SSION Senate Bill ISBI 1 Proposed Project List Form Part 2: Project Information Local Streets and Roads Program O Required 'Estimated Additional Project Elements ca Project Type •Estimated (Does the project include element(s)as described In 5HC 2030(c)-(47 = p Completion Date Useful Life Legislative Districts) 3 (a of Yr) (Select Y/N from dropdown listl U- Proposed •Project Title T " Project Wad* Project ID 'Project Description 'Project Location C (il any) Explanation 3 4 Complete O (PPN) Pre- Climate CS Type (If"Other"is selected, Construction Min. Max. State Senate Change Construction State Sustainability Technologies Streets Description of ti V (Select from dropdown Intl please explain) YYY (mm/Ymd (mm/YI Assembly Q Elements Elements a 9 ? _ PP32 5921 Slurry Seal Year 2 Road Maintenance& Slurry seal asphalt concrete street section Royal Avenue from Pico Street to end of Sidewalk,curb and .203/20I8 05/20I8 7 15 IO 47 Yes No No Yes Rehabilitation street Siutter repair ram+ Grind and Overlay 2.5" Year 2 Addition Road Maintenance& Grind and overlay 2.5"asphalt concrete of street section Vista Grande Way from Grand Terrace Road Sidwalk,curb and PP33 5421 Asphalt Concrete Rehabilitation to north end of Dog Park(approximately 0312018 05/2018 15 20 20 47 Yes No No Yes gutter repair .1] 400 LF) Itj .0 PP34 S421 PP35 5421 13 PP36 5421 C PP37 5421 R PP38 5421 t7 PP39 5421 C PP40 5421 C PP41 5421 y PP42 S421 C PP43 S421 .M PIS" 5421 PP45 S421 PP46 MI O PP47 5421 PP48 5421 PP49 S421 w ISM S4I1 tC O {�f] N d v ti r e0 r t�l r d ti td L L L R rL� V i I N J w I c1 a O L a W� U) J i.. C G7 Ir t t� liT a 4 of 7 Packet Pg. 139 �.8.b STATE OF CALIFORNIA• CALIFORNIA TRANSPORTATION COMMISSION Senate Bill SB 1 Proposed Project List Form Local Streets and Roads Program Agency Name: Agency Contact: U- ALAN FRENCH FY o Grand Terrace (909)824-6621 a 17/18 = RLoCode: 5421 afrench@grandterrace-ca.gov w Summary of Proposed Project List 43 Estimated Completion Date Estimated Project (mm/dd/yyyy) Useful Life No Project Title Project Description Project Location (#of yrs) Pre Construction Min. Max. c Construction R PPOl Grind and Overlay 2.5"Asphalt Grind and overlay 2.5"asphalt concrete of street section Arliss Lane from cul de sac to Arliss Drive 03/2018 05/2018 15 20 -a Concrete tv PP02 Grind and Overlay 2.5"Asphalt Grind and overlay 2.5"asphalt concrete of street section McClarren Street from Vivienda Avenue to 03/2018 05/2018 15 20 Concrete CanaL5treejo Grind and Overlay 2.5"Asphalt Grind and overlay 2.5"asphalt concrete of street section Orangewood Court from Observation Drive c O PP03 03/2018 05/2018 15 20 0 Concre a to end of street ;r Grind and Overlay 2.5"Asphalt Grind and overlay 2.5"asphalt concrete of street section Mavis Street from Michigan Avenue to PP04 03/2018 05/2018 15 20 0 Concrete Viviencla Avenue y Grind and Overlay 2.5"Asphalt Grind and overlay 2.5"asphalt concrete of street section Vivienda Avenue from cul de sac to Van PP05 03/2018 05/2018 15 20 Concrete B ren ree Grind and Overlay 2.5"Asphalt Grind and overlay 2.5"asphalt concrete of street section Dos Rios Avenue from Country Club Lane to PP06 onaete De Ber ree 03/2018 05/2018 15 20 N Grind and Overlay 2.5"Asphalt Grind and overlay 2.5"asphalt concrete of street section Franklin Street from Mirado Avenue to Mt_ PP07 03/2018 05/2018 15 20 m Concrete Vernon Avenue PP08 Grind and Overlay 2.5"Asphalt Grind and overlay 2.5"asphalt concrete of street section Arliss Lane from Arliss Drive to cul de sac 03/2018 05/2018 15 20 a� Concrete � PP09 Slurry Seal Slurry seal asphalt concrete street section Pascal Avenue from De Berry Street to cul 03/2018 05/2018 7 15 = �a PP10 ISlurry Seal Slurry seal asphalt concrete street section Arliss Way from cuI de sac to Arliss Drive 03/2018 05/2018 7 1 15 c9i PP11 Slurry Seal Slurry seal asphalt concrete street section Eton Drive from Thames Street to Preston 03/2018 05/2018 7 1 15 n PP12 Slurry Seal Slurry seal asphalt concrete street section Glendora Drive from Barton Road to end of 03/2018 05/2018 7 1 15 -i cs PP13 Slurry Seal Slurry seal asphalt concrete street section Palm Court from Palm Avenue to cul de sac 03/2018 05/2018 7 15 PP14 Slurry Seal Slurry seal asphalt concrete street section W.Litton Avenue from S.Rosedale Avenue 03/2018 05/2018 7 15 PP15 Slurry Seal Slurry seal asphalt concrete street section Miriam Way from Arliss Drive to Kingston 03/2018 05/2018 7 15i PP16 Slurry Seal Slurry seal asphalt concrete street section Robin Way from Warbler Avenue to Oriole 03/2018 05/2018 7 15 -r PP17 Slurry Seal Slurry seal asphalt concrete street section Vivienda Avenue from Terrace Avenue to 03/2018 05/2018 7 15 = m PP19 Slurry Seal Slurry seal asphalt concrete street section Honey Hill Drive from Westwood Street to 03/2018 05/2018 7 15 PP14 Slurry Seal Slurry seal asphalt concrete street section Jensen Court from cul de sac west end to 03/2018 05/2018 7 15 PP20 Slurry Seal Slurry seal asphalt concrete street section De Soto Street from Kingston Street to Do 03/2018 05/2018 7 15 a O PP21 Slurry Seal Slurry seal asphalt concrete street section Lark Street from Reed Avenue to cul de sac 03/2018 05/2018 7 15 PP22 ISlurry Sea! ISlurry seal asphalt concrete street section Siskin Court from Paradise Street to cul de 03/2018 05/2018 7 15 5 of 7 Packet Pg.132 B.B.b 5TATF OF CALIFORNIA• CALIFORNIA TRANSPORTATION COMMISSION Senate Bill (58) 1 Proposed Project List Form 0 Local Streets and Roads Program Agency game: Agency Contact: "- FY ALAN FRENCH o Grand Terrace U (909)824-6621 17,10 a � LoCode: 5421 afrench@grandterrace-ca.gov O r.. Summary of Proposed Project List Estimated Estimated Completion Date Useful Life Project project Title Project Description Project Location (mm/dd/yyyyl (q of yrs) No. Pre- Construction Min. Max. Construction PP23 Slurry Seal Slurry seal asphalt concrete street section Willet Avenue from Mavis Street to Van 03/2018 05/2018 7 15 a PP24 Slurry Seal Slurry seal asphalt concrete street section Dutch Street from Pico Street to Tanager 03/2018 05/2018 7 15 0 PP25 Slurry Seal Slurry seal asphalt concrete street section Dos Rios Avenue from Palm Avenue to 03/2018 05/2018 7 15 o� 0 PP26 iSlurry Seal Slurry seal asphalt concrete street section Rosedale Avenue from Palm Avenue to CI. 03/2018 05/2018 7 15 = PP27 Slurry Seal Slurry seal asphalt concrete street section Arliss Drive from Preston Street to end of 03/2018 05/2018 7 15 20 PP28 Slurry Seal Slurry seal asphalt concrete street section Mirado Avenue from Pico Street to L.adera 03/2018 05/2018 7 15 N PP29 Slurry Seal Slurry seal asphalt concrete street section Flamingo Street from Michigan Avenue to 03/2018 05/2018 7 15 PP30 Slurry Seal Slurry seal asphalt concrete street section Nand ina Street from Preston Street to 03/2018 05/2018 7 15 PP31 Slurry Seal Slurry seal asphalt concrete street section Pascal Avenue from Victoria Street to 03/2018 05/2018 7 15 PP32 Slurry Seal Slurry sea4 asphalt concrete street section Royal Avenue from Pico Street to end of 03/2018 05/2018 7 15 cv PP33 Grind and Overlay 2.5"Asphalt Grind and overlay 2.5"asphalt concrete of street section Vista Grande Way from Grand Terrace 03/2018 05/2018 15 20 0) PP34 t a� PP35 PP36 0 PP37 i PP38 T J PP39 PP40 0 PP41 ai PP42 °C rn PP43 PP44 m PP45 t 0 PP46 PP47 a PP48 PP49 6 of 7 Packet Pg. 133 B.B.b 5TATF OF CALIFORNIA• CALIFORNIA TRANSPORTATION COMMISSION Senate Bill (58) 1 Proposed Project List Form 0 Local Streets and Roads Program Agency game: Agency Contact: "- FY ALAN FRENCH o Grand Terrace U (909)824-6621 17,10 a � LoCode: 5421 afrench@grandterrace-ca.gov O r.. Summary of Proposed Project List Estimated Estimated Completion Date Useful Life Project project Title Project Description Project Location (mm/dd/yyyyl (q of yrs) No. Pre- Construction Min. Max. Construction PP23 Slurry Seal Slurry seal asphalt concrete street section Willet Avenue from Mavis Street to Van 03/2018 05/2018 7 15 a PP24 Slurry Seal Slurry seal asphalt concrete street section Dutch Street from Pico Street to Tanager 03/2018 05/2018 7 15 0 PP25 Slurry Seal Slurry seal asphalt concrete street section Dos Rios Avenue from Palm Avenue to 03/2018 05/2018 7 15 o� 0 PP26 iSlurry Seal Slurry seal asphalt concrete street section Rosedale Avenue from Palm Avenue to CI. 03/2018 05/2018 7 15 = PP27 Slurry Seal Slurry seal asphalt concrete street section Arliss Drive from Preston Street to end of 03/2018 05/2018 7 15 20 PP28 Slurry Seal Slurry seal asphalt concrete street section Mirado Avenue from Pico Street to L.adera 03/2018 05/2018 7 15 N PP29 Slurry Seal Slurry seal asphalt concrete street section Flamingo Street from Michigan Avenue to 03/2018 05/2018 7 15 PP30 Slurry Seal Slurry seal asphalt concrete street section Nand ina Street from Preston Street to 03/2018 05/2018 7 15 PP31 Slurry Seal Slurry seal asphalt concrete street section Pascal Avenue from Victoria Street to 03/2018 05/2018 7 15 PP32 Slurry Seal Slurry sea4 asphalt concrete street section Royal Avenue from Pico Street to end of 03/2018 05/2018 7 15 cv PP33 Grind and Overlay 2.5"Asphalt Grind and overlay 2.5"asphalt concrete of street section Vista Grande Way from Grand Terrace 03/2018 05/2018 15 20 0) PP34 t a� PP35 PP36 0 PP37 i PP38 T J PP39 PP40 0 PP41 ai PP42 °C rn PP43 PP44 m PP45 t 0 PP46 PP47 a PP48 PP49 6 of 7 Packet Pg. 133 B.B.b STATE OF CALIFORNIA • CALIFORNIA TRANSPORTATION COMMISSION Senate Bill (SB) 1 Proposed Project List Form Local Streets and Roads Program En c Agency Name: Agency Contact: LL ALAN FRENCH FY o Grand Terrace (909)824-6621 a 17/18 0 LoCode: 5421 afrench@grandterrace-ca.gov •2 M a Summary of Proposed Project List Estimated Estimated Completion Date M Useful LifeProject (mm/dd/yyyy)No Project Title Project Description Project Location (#of yrs) _ c Pre Construction Min. Max. Construction PP50 0 e: 0 w c 0 0 N C7 n A N d U L c R ,L^ V yl N J yl a? O L a i a N J ai C a E r a 0 7 0f 7 Packet Pg.134 This page left intentionally blank. L t , Y . B.B.c RESOLUTION NO. 2017-33 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF GRAND TERRACE, STATE OF CALIFORNIA, ADOPTING THE MEASURE I FIVE- YEAR CAPITAL IMPROVEMENT PLAN a WHEREAS, San Bernardino County voters approved passage of Measure I in LL November 2004, authorizing the San Bernardino County Transportation Authority to impose a one-half of one percent retail transactions and use tax applicable in the incorporated and c unincorporated territory of the County of San Bernardino; and U WHEREAS, revenue from the lax can only be used for transportation improvement e and traffic management programs authorized in the Expenditure Plans set forth in — Ordinance No. 04-1 of the Authority; and =° WHEREAS, Ile Strategic Plan requires each local jurisdiction applying for revenue from the Local Street Program to annually adopt and update a Five-Year Capital Improvement Plan; and m d WHEREAS, California Public Utilities Code 190300 and Ordinance No. 04-1 require ro each local jurisdiction to maintain General Fund expenditures for transportation- related m construction and maintenance activities at the required Maintenance of Effort base year level in each fiscal year of the adopted Five-Year Capital Improvement Plan, which for the City of Grand Terrace is $115,156; and .o 0 NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Grand °C Terrace, County of San Bernardino, State of California, that the Measure I Five- Year Capital improvement Plan and Expenditure Strategy, attached to this resolution as Exhibit A and c Exhibit B, are hereby adopted. 0 PASSED, APPROVED AND ADOPTED by the City Council of the City of Grand Terrace at a regular meeting held on the 141h day of November 2017. N CD V Darby MdNaboe,,M yor ATTEST: w�� m o L I Debra L. Thomas, ity Clerk m r fa APPROVED AS TO FORM: X . C m E r chard L. dams, It City Attorney a 2017-33 CC Reso Page 1 of 1 November 14, 2017 Packet Pg. 5 ■MaHlia reel enaq..yl,rd.amllr lase.\.sµtlr UN PIYI,l�Ier MV JS111ib101 wM\fM{IW atl616w.1i1Ml MlwInLILLIC/JRMIM{/rowt l�HW.IYU.Il.L.4rJrMlM1lpy��14 MEASURE I LOCAL STREET PASS THROUGH FUNDS FIVE YEAR CAPITAL 11APROVENIVIT PLAN 1'LAI/PER1W FY2UITf2ois I*F 521l z CITY OF GRAND TERRACE TOW Av44a4 AGENCYNAIAE: Frzntt4ole I iY2olelsol9 I crzulsrp;u PY202R:031 frzmlrz: CAARYOV[RINNA4M Swims ANNUAL uEASUREIESTUMATE: 5200.907.4k1 S2116,e]Q.00 S212,92S.m 5219019-00 f225.363.D0 f1,37],7eT76 TIru.� '�•irmu�ll rrnlaanl iias�7rn --- IT•.QRylgl � ��I��.-... irl/\+r+lsrre i „ •- - >,.. r.rwe c..t w:n ..^.. c.nu c..r•+. cr..w crrr.•„ -[..'.CP .. i.tt/nr I/.yr•.•..wlartyyw..{ry�.JrL.nr+.Sarw{ _ _ 4r2+I'+ {q,ql>. \r,>_.r/rl� i .ryru.ir\rn,....wtw.•�^•r=1{'•'7 w.s..w]___�.__, .. ...—_ IIg47.7r rlmanJu , wlr,r lelsae►..w!{\wp rr.i..ir.w\ry.l„Iw.....-,�. w }+n.-_.;_ � Ilaemwl .. I -.-. +/°m°S° r.r7a¢¢2riw+..ILw:l.tK^.f w.rl{n frry raw,a - --+ i .n:.ir•; .� - ._ .a I i Llvian[ - 1 I:alm�n -tam.J.le,r fv�i•:lf.:..+.ur.y.w+r+r�.r.,u l.r,sr.'w..'..�...__ � -.__ .---.-_ � I` i J w + I I t 19 I--O I I vp wm' m i w Ift '1 Yp1� f_IneM 13 c•�_^. F no®m s c woum o - f \aamo / . n wrfo�tn �l aivun — rL56v �' frSoroim_. �M1 17� 1101 —__ — Alt �s.�p K�I��trih.fH L 14�iF Yitlf--��__ 1 F 4 HfYI�S WFi aft Ilw ` +i a cJwrww Irr•n..rr W MJrN r�-..�r:�r�� rwrr•r•IM,,.rrlw {rl,F{Mli Y.r LrL lywWrnl/•wwN 7 '1�{'r i. r 1 rill lll" •Y,•w•,r•1•rwrw rw•r.-Irr9P1 Jr\rwr�rrw Y••.,Frw w1w i.rr•.rw{tir'1 r,Y�WIrrJ•�,Ywlrh 'l�Il/.rlwr'rtl4rrrrllMlam r.r, 1 :1iW 10H tlw„.,.Nwrr..r...alr...........,.w.wl......{..�.. n.r,.•...w..�•......s ifa.w 1.. •Ir.w,tw,rMlMwrrl\Wi,•YLra WrY�wL{�w/•-,IrL.W 4.w•�rr'•.H•YrrM w+�..Mw M•"�'lW f Mrw[/Y•IMW'��r1�WH.,1MVIIr,MwlMMrr,rl Mrrin'��w,.rw•w I` n ,rtyy,yi•irJ}.J lali✓4{fJ, L W °f Attachment: Executed Reso Measure I CIP (002) (Resolution for Road Maintenance and Rehabilitation Acccount Funding) B,8.c ATTAChMlfir A Annual Paving Pr ect 2017-2018 Slurry Sea! i 2.8"Grind and ovefla Cast to Slurry Seal at No. Street Name. From To Area Current PCi $0 19 per Sq Ft so S 6.47520 C WAY Cos Suss DM WE swan 49 S t Gal 15 C 3 UON OR TWWE.SST RLSTGNST 41-W 49 s � $,19256 LL 4 GLENOCRA GR TON RD OF SiR==1 Si6T2 49 3 10 007.68 +' S PALit CT PALM AVE .;�s 8 B«t C 49 S 1.307.20 O N UTTC14 AL'E 5 ROSEDALE AVE S LA MENA DR 17.5:6 0 e 49 s 3.73312 � 1--RLAAI WAY SUSS OR :*STOII ST 1190L U 7 48 s aE12t.76 Q I L3 ROSIIWAY NARSLERAVE ]FLEAVE 36= 48 3 L%8.64 TERRACE AVE MAPLE AVE I3,G=9 C 48 s z020.06 2 hgNEY 1CLL DR VESTVW0 ST PALM AVe 42 912 47 s 8.15328 � i1 w115ENCT 41 E•]0 csV-"Lrot1CR 4,777 47 3 '= -SBTD ST QNG-370H ST =5 R103 A',S; XUZ 45 s 5.a2464. M 13 'Sr 'lMA"E 'ems 19L4 45 S 74178 OT 14 5:SKIHCT OAP.QNSEST =5 12544 45 I 2.383.35. ,5 NRLETAVE LlAV1S ST VA118:1RPNi 5T 27 t%i 45 3 4,882 24 C ITCHST t5 PICO ST rAr4 Oa ST Ir CA �44 S 3.30752 � t T R105 AVE aALM AVE COUNTRY CtUa Ui 1i M 43 s 3,496 00 Ll C 1, ..Sr"II4LEA•!E PAUTAVd_ CLtSC1TTIiI 17.432 43 s 1.UZ09 to SSOR aRESTONST 6w MUD C Z401.50 0) iC ':RAOOAA MCIOST LAOE:RAST 37.C98 42 s 6.9:58.24 C U,GR ST WCHZAH AVC COS 6 8CL •19 2l 41 s 1.66416 g 22 IA1,C*A ST PRESTCN ST Cl LMY GT I'.240 41 3 1.9450 13 2] ASCrII AVE YICTOR"ST GLRHAWA4 13013 40 $ 3.423.04 O 71 YALAVC Pico It 843 40 3 3.57960 cc L TOTAL $ 99,016.7fi �° ' c 0 Cosa to Grind&o'rerlay at No. Street Name From To Area Current PC[ S719 per sq Fi o to i AAUS5 LN A9 rJSLl DDRNE a.eCT34 25 3 1232871 ARL755U1 iFLLRSOR COS � � !l,Ti6iFi 25 S 21,4$8.62 ] UXtARRENST NIMMA AVE CANALST 358T07t 25 S 11321701) C 4 ORANGEWOOD CT OBSFRVAT101I OR ENO OF STREET IT 370 25 S 65.429 44 0 HAM ST AEfd7AAM Is= 26 S 53.894.06'11MICAAYE VANMwerST 3-19w 26 3 105,142.40'M RR1a AVE fG41VAlrLF ri11Y f7. B UJ OE BERRY 5T 1TIT2 27FFWil%krSTAE R VERd10NAVE 7a060 27 S 9595527 T ;AL $ 546,734.13 0 rA O a SLURAY $ 99 wGi0o m GFCNO'OVERLAY S 546,000.00 3 ADA Rarng S 2000000 d AC OIO OUT 3 19,000.00 x INSPECTION S 19.M.00 to OIEOrECN 3 14,D0000 c CONTMIGENCY S 36,200.00 4) PY 2017-19 E TOTAL PROJECT cosT 758,200.00 a Packet Pg_ 37 ATTACHMENT B Year 2018 -2019 Grind and Overlay 2.5" Asphalt Concrete Street From TO L W Area PO g.As} Rf-fP.AVE W#,SIN SF 1;25q. 32" 40;12ii. 27 +1N ENUA--Avt 9211; 2,1. 17;388. .27 8r #rYAR84 t.AVE ORIOLE AVE 927_ 32 291664. 26 *Okle:T' ' ERpm URavFRO ADS 216.31 32. 8;907:69 2 ONM* 4q h1tti+IEr1ClA`.L4T CANAL 3F MI.. 32. 27,231s. 36 f AVM De-SERRY ST 527 32. 16,OCA 30 _ - lawtf 98, M—0;,%T 210. $2. '.680 3 r r,wsr ass. 32_ 15 d24 31 dY'IIAi SVEBUaKS AVE 448, 32 Be 336, 31 Fr4aLiFfF VF.ft1+iC] JIL;F , DEI=AVE #2s3. :41). 50;520. 3 Additional Scope: Repair Damaged Curb & Gutter: 3000 L.F. at $40 Per L.F. _ $120,000 Perform A.C. Dig-Outs: 5,000 Sq.Ft. at $20.00 Per Sq. Ft. = $100,000 Restore Striping: Lump Sum for all streets on this list = $50,000 FY 2018-19 Year Grand Total = $1 ,002,431 d n � p0 w � O° Attachment: Executed Reso Measure 1 CIP (002) (Resolution for Road Maintenance and Rehabilitation Acccount Funding) B.S.c ATTACHMENT C Yeah _-N QRQ *y r "A h Ca crstip Street From To L W Area Pp VIVIENDA CT CD5 VIVIENDA AVE520 32 16AA0 32 DE SOTO ST 1.IIRADO AVE MOUNT VERNON Al a35 32 26.720 33 c PICO ST MICHIGAN ST REED AVE 1 376 40 55,120 33 � VAN BUREN ST WEST ENO MICHIGAN AVE 1,311 40 52 440 33 ti VAN BUREN ST REED AVE(5) MOUNT VERN7N A% 1,423 40 56.920 33 VIVIEPIDAAVE VMENDA CT BARTON RD E33 32 20.2$6 33 0 FULLIAR PL PASCAL AVE CDs 32294 32 10 334 09 35 v v a 0 Additional Scope: .� Repair Damaged Curb & Ginter: 3000 L.F. at$40 Per L.F. = $120,000 5 Perform A.C. Dig-Outs. 5,000 Sq.Ft.at$20.00 Per Sq. Ft. = $100,000 Restore Striping: Lump Sum for all streets on this list= $50,000 -� c �o d u FY 2019-20 Grand Total _ $985,290 co 2 a m 0 0 c 0 w a 0 u, a� N G O a U N L N Gl O FA co M d w a V 01 x LU r.+ C G1 E V R Q Packet Pg. 139 BAC ATTACHMENT D Year k20 - Gji I nd and Overipy 2.6" AN)baft Concrete 70 L W Area PCI U_ 4qUN'tVM4i *g U j P_ LZ i'�� 0 Additional Scope: o Repair Damaged Curb & Gutter: 3000 L.F. at$40 Per L.F. = $120,000 M Perform A.C. Dig-Outs: 5,000 Sq,Ft.at$20.00 Per Sq. Ft. = $100,000 Restore Striping: Lump Sum for all streets on this list= $50,000 C5 FY 2020-21 Grand Total = $712,972.62 0 0 O O ai Vl LLI E Packet Pg. 140 B.B.c _ ATTACHMENT E Y. ar 21 a0p 1•ii� nd Qver :, It Q 0 c�ete Street From TO C w Arid 17 1 ORIOLE AVE VAN BUREN ST LARK ST 484 32. 15,485 38 PARADISE ST MERLE CT PALM AVE 1.001 32 32,032 38 C TAHAGFRST ROYALAVE MICHIGAN AVE 1,162 32 37,184 3$ C WARBLER AVE RAVEN WY RDSW WY 246 32 7,872 37 ti ROSEDALE AVE W SEVILLE ST PALM AVE T 760 32 R _ 24.320 35 O [] U U Q Additional Scope: � Repair Damaged Curb & Gutter: 3000 L.F. at$40 Per L.F. = $120,000 Perform A.C. Dig-Outs: 5,000 Sq,Ft. at$20.00 Per Sq. Ft. _$100,000 Restore Striping: Lump Sum for all streets on this list= $50.000 a� >x -o FY 2021-22 Grand Total = $620,688.00 m fG 0 EL' L 0 w C y 4) N C O_ L1. V Q7 L N1 M G1 2 O Cn 4) G7 r 3 U X Uj i+ C 41 r U M a Packet Pg. 141 B.8.c EXHIBITS tNil( II` V1 I It 11"M.N V 10 CITY OF GRAND TERRACE c+ MEASURE I CAPITAL IMPROVEMENT PLAN S c EXPENDITURE STRATEGY U. Fiscal Year 2017/20118 to Fiscal Year 2021/202? 0 U U V a The City of Grand Terrace has adopted it Measure I expenditure strategy that o facuses on improvements to existing facilities through nn annual Pavement Management Program. In addition to slurry and grind and overlay treatment of City streets, the expenditure strategy includes: a tree trimming program to L increase visibility along roadways, ADA curb ramp and sidc%Galk repair programs as well as outer necessary improvements to the right of way as needed. -a c d U c 19 c C7 r+ ca 2 V SC O O c O 7 O N q7 N O O a U m 3 N 14 G1 0 N W ♦r 7 U 61 X LU r+ C N E r a a FY20172018 to FY2021I2077 MICIP ExpwditureStrategy Packet Pg. 142 B.B.c STATE OF CALIFORNIA } COUNTY OF SAN BERNARDINO CITY OF GRAND TERRACE c U- c 0 1 Debra L. Thomas, City Clerk of the CITY OF GRAND TERRACE, CALIFORNIA, a DO HEREBY CERTIFY that the foregoing Resolution, being Resolution No. 2017-33 was duly passed, approved and adopted by the City Council, approved and signed by the Mayor, and attested by the City Clerk, at the regular meeting of said City Council held on the 14Eh day of November 2017, and that the same was passed and adopted by the following vote. a .c AYES: Council Members Wilson, Hussey; Mayor Pro Tem Robles; Mayor McNaboe = a NOES: None. V ABSENT: None. c L ABSTAIN: None. ° 0 Executed this 161h day of November 2017, at Grand Terrace, California. O U Debra L. Thomas City Clerk [SEAL) s -c w x r.i C N E t C1 !d y r.. a Packet Pg.1473 1 This page left intentionally blank. STATE OF CALIFORNIA COUNTY OF SAN BERNARDINO CITY OF GRAND TERRACE ) 1 Debra L. Thomas, City Clerk of the CITY OF GRAND TERRACE, CALIFORNIA, DO HEREBY CERTIFY that the foregoing Resolution, being Resolution No. 2018-01 was duly passed, approved and adopted by the City Council, approved and signed by the Mayor, and attested by the City Clerk, at the regular meeting of said City Council held on the 9th day of January 2018, and that the same was passed and adopted by the following vote: AYES: Council Members Wilson, Hussey, Henderson; Mayor Pro Tern Robles; Mayor McNaboe NOES: None. ABSENT: None. ABSTAIN: None. Executed this 10th day of January 2018, at Grand Terrace, California. 2— aeL-�z Debra L. Thomas City Clerk [SEAL]