2011-19 RESOLUTION NO.2011- 19
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF GRAND
TERRACE, ADOPTING RESIDENTIAL AND COMMERCIAL SOLID
WASTE AND RECYCLING RATES.
WHEREAS; the City Council has determined that due to changes in operating and
program costs, an adjustment in the service rates for the provision of refuse and recycling
collection as shown by Exhibit "A", attached, is hereby deemed appropriate and
reasonable. All other rates existing and not separately identified in Exhibit "A" shall
remain the same; and,
WHEREAS; a Public Hearing was conducted on July 26, 2011, at 6:00 p.m., at the
City Council Chambers, 22795 Barton Road, Grand Terrace California, at which time all
persons interested in or objecting to the proposed solid waste and recycling rate
adjustments were heard; and,
WHEREAS; Notice of said solid waste and recycling rate adjustments were mailed
using the U.S. Postal Mail Service to all residential and commercial customers of record
by Burrtec Waste Industries on or about July 1, 2011 and that said Notice was provided
45-days prior to the Public Hearing in accordance with Proposition 218;and,
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Grand
Terrace that the solid waste and recycling rate adjustments were approved and adopted by
the Council on July 26,2011 and shall become effective on August 26,2011.
ADOPTED this 26"'day of July, 2011.
ckiewitz, Mayor
ATTEST:
Brenda Mesa,City Clerk
kw
1, BRENDA MESA, City Clerk of the City of Grand Terrace, do hereby certify
that Resolution No. 2011-19 was introduced and adopted at a regular meeting of the
City Council of the City of Grand Terrace held on the 26" day of July, 2011, by the
following vote:
AYES: Council Members Sandoval, MCNaboe, Hays; Mayor Pro Tem Garcia;
Mayor Stanckiewitz
NOES: None
ABSENT: None
ABSTAIN: None
Brenda Mesa, City Clerk
Approved as to form:
City Attorney
16 EXHIBIT A
CITY OF GRAND TERRACE
PROPOSED RATE INCREASE
Current Proposed Current
Service Type Rate Rate Service Type Rare Proposed Rate
Ree'darr8el Refuse connauumial Front Load Connootor
Standard-96 Gallon $ 2244 $ 22.86 Size Freg
64 Gallon Trash $ 21.02 S 2152 2 1 $ 128.34 $ 132.33
Erna 96 Gallon Trash Barrel $ 1081 S 11 04 2 2 $ 241 54 $ 249.23
Extra 64 Gallon Trash Barrel $ 880 $ 8 99 2 3 $ ?89.88 $ Ml 58
Extra Re ding Barrel S 2.03 $ 2.07 2 4 $ 498.22 $ 513.92
Extra Green Waste Barrel $ 203 $ 2.07 2 5 S 625.97 $ 645.68
SackyercUSideyard Service $ 12.50 $ 1277 2 6 $ 754.61 $ 77831
Extra Pick-Up 2 yd On-Site S 2143 $ 22.19
Extra Pick-Up 2yd Unscheduled $ 37.54 S 38S3
Ccannnercial Front Load Ranue 3 1 $ 178 46 $ 164.15
So. Fret, 3 2 $ 342.19 $ 35328
2 1 S 8551 $ 87.71 3 3 $ 520.73 $ 537,52
2 2 S 156.21 $ 1W.29 3 4 $ 698.% $ 72145
2 3 $ 241,71 $ 24801 3 5 S 87777 $ W596
2 4 S 327.24 $ 33574 3 6 $ 1,056.00 $ 1,0tlg9W
2 5 $ 412.17 $ 42285 Extra Pick-Up 3yd On-Sae $ 2835 S 2940
2 6 $ 497.97 S 510 W Extra Pick-Up 3yd Unscheduled $ 44.45 $ 45.84
Extra Pick-Up 2 yd On-Site $ 1221 $ 12.58 4 1 $ 236.74 $ 244.32
Extra Pia-Up 2yd Unscheduled $ 2831 $ 2901 4 2 $ 458.58 $ 47342
3 1 S 11452 $ 11753 4 3 $ 69545 $ 717,88
3 2 S 214.65 $ 22037 4 4 $ 93231 $ %2.31
3 3 $ 329.24 $ 33].99 4 5 $ 1,169.17 $ 1206.76
3 4 $ 45333 $ t65.27 4 6 S 1 404.89 $ 1 t50,03
3 5 $ 558.41 $ 573.16 Extra Pia-Up 4 yd On-Site $ 35.27 $ 3683
3 6 $ 672.70 $ 69048 E m Pies-Up 4yd Unscheduled $ 51.37 $ 53.08
Extra Pia-Up 3 yd On-Site $ 14,51 $ 14.%
Extra Pia-Up 3yd Unscheduled $ W.62 $ 3142 Miscelleneow Services
4 1 $ 15153 $ 155.52 Temporary Bin 3 yd(7,lays) $ 5369 $ 5548
4 2 $ 266.49 $ 2%18 Burned Bin $ 29176 $ 29788
4 3 $ "0.13 $ 45180 Exchanges $ 61 a $ 6277
4 4 $ 591.78 $ 60744 Lock Rental(Monthly) $ 12.W $ 12.77
4 5 $ 745.39 $ 765.11 Lost or Stolen Bin $ 52180 $ 531,93
4 6 S 893.94 S 917.57 Oyaage $ 35 W $ 3573
Extra Pia-Up 4yd On-Sda $ 16,82 $ 17.37 Replaced Key $ 521 $ 532
Extra Pia-Up 4yd Unscheduled $ 32.92 $ 33.82 Leeks-Replaced Loa $ 26.05 $ 2660
6 1 $ 21949 $ 225.33
6 2 $ 424.20 $ 435.54 Rdl-0R8 Corn c[o SaM
6 3 $ 844.28 $ 66146 10 yard(plus disposal) $ 19553 5 199.64
6 4 S 863,21 $ 886.20 20 yard(plus diaposa0 $ 195.53 $ 1w'(Pt
6 5 $1.M,71 $1,111.53 40 yard(plus disposal) $ 195.53 $ 199.64
6 6 $1,30221 $1,336.86 40 yard Compacbr(ptus disposal) $ 218.51 $ 223.10
Estro Pia-Up 6 yd On-Sae $ 21.43 $ 22.19 40 yard R cydirg(plus processing) $ 195.53 $ 1N 64
Extra Pia-Up 6yd Unscheduled $ 37.54 $ W63 40 yard Green Waste(plus disposal) $ 218.51 $ 223.10
Refuse Per Ton $ 56.15 $ 57.97
conarrarprolal Front Lgvd Recycling Ternp xt Rental Fe (minimum a ery 7- $ 5 5
26 07 $ 26.62
Size 7092
2 1 1 8 6333 E M65
2 2 $ 1 81. 4 $ 114 18
18
3 t 8 1.24 $ 51.95
20
3 2 $ 148.09 $ TM 41
4 1 $ 107.16 $ 209.41
4 2 $ 15294 $ 1%15
6 1 $ 19294 $ 156.15
6 2 $ 29108 $ 29720