Loading...
2011-19 RESOLUTION NO.2011- 19 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF GRAND TERRACE, ADOPTING RESIDENTIAL AND COMMERCIAL SOLID WASTE AND RECYCLING RATES. WHEREAS; the City Council has determined that due to changes in operating and program costs, an adjustment in the service rates for the provision of refuse and recycling collection as shown by Exhibit "A", attached, is hereby deemed appropriate and reasonable. All other rates existing and not separately identified in Exhibit "A" shall remain the same; and, WHEREAS; a Public Hearing was conducted on July 26, 2011, at 6:00 p.m., at the City Council Chambers, 22795 Barton Road, Grand Terrace California, at which time all persons interested in or objecting to the proposed solid waste and recycling rate adjustments were heard; and, WHEREAS; Notice of said solid waste and recycling rate adjustments were mailed using the U.S. Postal Mail Service to all residential and commercial customers of record by Burrtec Waste Industries on or about July 1, 2011 and that said Notice was provided 45-days prior to the Public Hearing in accordance with Proposition 218;and, NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Grand Terrace that the solid waste and recycling rate adjustments were approved and adopted by the Council on July 26,2011 and shall become effective on August 26,2011. ADOPTED this 26"'day of July, 2011. ckiewitz, Mayor ATTEST: Brenda Mesa,City Clerk kw 1, BRENDA MESA, City Clerk of the City of Grand Terrace, do hereby certify that Resolution No. 2011-19 was introduced and adopted at a regular meeting of the City Council of the City of Grand Terrace held on the 26" day of July, 2011, by the following vote: AYES: Council Members Sandoval, MCNaboe, Hays; Mayor Pro Tem Garcia; Mayor Stanckiewitz NOES: None ABSENT: None ABSTAIN: None Brenda Mesa, City Clerk Approved as to form: City Attorney 16 EXHIBIT A CITY OF GRAND TERRACE PROPOSED RATE INCREASE Current Proposed Current Service Type Rate Rate Service Type Rare Proposed Rate Ree'darr8el Refuse connauumial Front Load Connootor Standard-96 Gallon $ 2244 $ 22.86 Size Freg 64 Gallon Trash $ 21.02 S 2152 2 1 $ 128.34 $ 132.33 Erna 96 Gallon Trash Barrel $ 1081 S 11 04 2 2 $ 241 54 $ 249.23 Extra 64 Gallon Trash Barrel $ 880 $ 8 99 2 3 $ ?89.88 $ Ml 58 Extra Re ding Barrel S 2.03 $ 2.07 2 4 $ 498.22 $ 513.92 Extra Green Waste Barrel $ 203 $ 2.07 2 5 S 625.97 $ 645.68 SackyercUSideyard Service $ 12.50 $ 1277 2 6 $ 754.61 $ 77831 Extra Pick-Up 2 yd On-Site S 2143 $ 22.19 Extra Pick-Up 2yd Unscheduled $ 37.54 S 38S3 Ccannnercial Front Load Ranue 3 1 $ 178 46 $ 164.15 So. Fret, 3 2 $ 342.19 $ 35328 2 1 S 8551 $ 87.71 3 3 $ 520.73 $ 537,52 2 2 S 156.21 $ 1W.29 3 4 $ 698.% $ 72145 2 3 $ 241,71 $ 24801 3 5 S 87777 $ W596 2 4 S 327.24 $ 33574 3 6 $ 1,056.00 $ 1,0tlg9W 2 5 $ 412.17 $ 42285 Extra Pick-Up 3yd On-Sae $ 2835 S 2940 2 6 $ 497.97 S 510 W Extra Pick-Up 3yd Unscheduled $ 44.45 $ 45.84 Extra Pick-Up 2 yd On-Site $ 1221 $ 12.58 4 1 $ 236.74 $ 244.32 Extra Pia-Up 2yd Unscheduled $ 2831 $ 2901 4 2 $ 458.58 $ 47342 3 1 S 11452 $ 11753 4 3 $ 69545 $ 717,88 3 2 S 214.65 $ 22037 4 4 $ 93231 $ %2.31 3 3 $ 329.24 $ 33].99 4 5 $ 1,169.17 $ 1206.76 3 4 $ 45333 $ t65.27 4 6 S 1 404.89 $ 1 t50,03 3 5 $ 558.41 $ 573.16 Extra Pia-Up 4 yd On-Site $ 35.27 $ 3683 3 6 $ 672.70 $ 69048 E m Pies-Up 4yd Unscheduled $ 51.37 $ 53.08 Extra Pia-Up 3 yd On-Site $ 14,51 $ 14.% Extra Pia-Up 3yd Unscheduled $ W.62 $ 3142 Miscelleneow Services 4 1 $ 15153 $ 155.52 Temporary Bin 3 yd(7,lays) $ 5369 $ 5548 4 2 $ 266.49 $ 2%18 Burned Bin $ 29176 $ 29788 4 3 $ "0.13 $ 45180 Exchanges $ 61 a $ 6277 4 4 $ 591.78 $ 60744 Lock Rental(Monthly) $ 12.W $ 12.77 4 5 $ 745.39 $ 765.11 Lost or Stolen Bin $ 52180 $ 531,93 4 6 S 893.94 S 917.57 Oyaage $ 35 W $ 3573 Extra Pia-Up 4yd On-Sda $ 16,82 $ 17.37 Replaced Key $ 521 $ 532 Extra Pia-Up 4yd Unscheduled $ 32.92 $ 33.82 Leeks-Replaced Loa $ 26.05 $ 2660 6 1 $ 21949 $ 225.33 6 2 $ 424.20 $ 435.54 Rdl-0R8 Corn c[o SaM 6 3 $ 844.28 $ 66146 10 yard(plus disposal) $ 19553 5 199.64 6 4 S 863,21 $ 886.20 20 yard(plus diaposa0 $ 195.53 $ 1w'(Pt 6 5 $1.M,71 $1,111.53 40 yard(plus disposal) $ 195.53 $ 199.64 6 6 $1,30221 $1,336.86 40 yard Compacbr(ptus disposal) $ 218.51 $ 223.10 Estro Pia-Up 6 yd On-Sae $ 21.43 $ 22.19 40 yard R cydirg(plus processing) $ 195.53 $ 1N 64 Extra Pia-Up 6yd Unscheduled $ 37.54 $ W63 40 yard Green Waste(plus disposal) $ 218.51 $ 223.10 Refuse Per Ton $ 56.15 $ 57.97 conarrarprolal Front Lgvd Recycling Ternp xt Rental Fe (minimum a ery 7- $ 5 5 26 07 $ 26.62 Size 7092 2 1 1 8 6333 E M65 2 2 $ 1 81. 4 $ 114 18 18 3 t 8 1.24 $ 51.95 20 3 2 $ 148.09 $ TM 41 4 1 $ 107.16 $ 209.41 4 2 $ 15294 $ 1%15 6 1 $ 19294 $ 156.15 6 2 $ 29108 $ 29720