Loading...
1983-49 RESOLUTION NO. 83- 49 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF GRAND TERRACE, CALIFORNIA, RESCINDING RESOLUTION NO. 81-49 AND ESTABLISHING FEES FOR ENGINEERING, PLANNING, AND BUILDING & SAFETY WHEREAS, by City policy, the City Council of the City of Grand Terrace establishes by resolution fees to charged by the City; and WHEREAS, Resolution No. 81-49, adopted July 9, 1981, adopted the County of San Bernardino's Ordinance No. 2543, by reference, establishing fees charged by the City Planning Department and the City Building and Safety Department to become effective July 10, 1981; and WHEREAS, said Council desires fees charged by the County for Engineering, Planning, and Building & Safety services to also apply the . City of Grand Terrace and to be incorporated as Exhibits "A" , "B" and "C" to this Resolution; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF GRAND TERRACE DOES HEREBY RESOLVE, DECLARE, DETERMINE, AND ORDER AS FOLLOWS: Section 1. That Resolution No. 81-49 is hereby rescinded in its entirety. Section 2. That fees charged by the City for Engineering, Planning, and Building & Safety services be those as shown in Exhibits "A", "B", and "C", attached hereto and incorporated herein. ADOPTED this 22nd day of September, 1983. ATTEST: = ity,,q k o the Ci ty o Gr ayor o e i ty Grand Te race =_ ',Term and of the City Cou c 1 and of the Ci t Cou i 1 thereo Approved as to form: Ti ty tto rn ey STATE OF CALIFORNIA ) COUNTY OF SAN BERNARDINO ) ss. CITY OF GRAND TERRACE ) I, MYRNA ERWAY, City Clerk of the City of Grand Terrace, DO HEREBY CERTIFY that the foregoing Resolution was duly adopted by the City Council of said City at a regular meeting of the City Council held on the 22nd day of September, 1983, and that it was so adopted by the following vote: AYES: Councilmembers Petta, Pfennighausen; Mayor Grant. NOES: None. ABSENT: Councilmembers Rigley, Nix. City Clo the City of Gr err�ce -- and of a City Council thereof-.,,- STATE OF; CALIFORNIA ) COUNTY OF SAN BERNARDINO ) ss. CITY OF GRAND TERRACE ) I, MYRNA ERWAY, City Clerk of the City of Grand Terrace, DO HEREBY CERTIFY that the above and foregoing is a full , true, and correct copy of Resolution No. 83-40 of said City, and that the same has not been amended or repealed. DATED: September 23, 1983. City CTqrk of the City of G Ltd Terr--ace- . and o the City Council thereof. _ ; - Pace 1 of 1 EXHIBIT "A" COUNTY SURVEYOR'S FEE SCHEDULE Resolution No. .83-49 ORDINANCE NO. 2755 Adopted 9/22/83 EFFECTIVE JULY 1, 1983 FINAL MAPS - Section 16.0215 . Checking Fee.. . . . . . . . . . . . .Actual 'Cost Deposit Required. . . . . . . . . .$200.00 + $15.00/lot (Minimum Deposit $750.00) Deferred Monumentation - Cash Deposit Required - Section 61.034 (b) (5) (B) : Mountain or Hillside Subdivisions: - 20 lots or less. . . . . . . . . . . . . . . . . . . $ 90.00/lot More than 20 lots. . . . . . . . . . . . . . . . . .$1,800.00 + $80.00/lot for each lot over 20 Valley Subdivisions: 20 lots or less. . . . . . . . . . . . . . . . . . . . . . . . .$ 60.00/lot More than 20 lots. . . . . . . . . . . .. . . . . .$1,200.00 + $50.00/lot for each lot over 20 PARCEL MAPS - Section 16.0215 (A) Checking Fee. . . . . . . . . . . . . . . . . . . . . . .$330.00 + $20.00/ arcel' .; p (B) Checking fee for all resubdivisions of an entire lot or parcel created on a final map or parcel map recorded after January 1- 1960. . . . . .$125.00 ENGINEERING FEE - Section 16.0215 (This applies to all road improvements required for Subdivisions, Minor Subdivisions, and Building Permits) $ 1.00 to $ 25,000.00 .- 4 % of value of work $ 25,000.00 to $100,000.00 - 3-1/2% of value of work $100,000.00 & UP - 3 % of value of work Request for Waiver of Public Roadway Improvements. . . . . . . . .$55.00/request 11LO Final Flood Hazard Report. . . . . . . . . . . . . . . . . . . . . . • • • • • . . . . . .$42.00/report UNTY CODE - Section 16.0228 . (a) Maps & Legal Descriptions - Preparation (1) 30 copies of map and 30 copies of legal description. . . . . . . . . . . .$80.00 (2) Additional charge after 4 hours. . . . . . . . . . ..... . ... . . . . . . . . . . . . . . . .$20.00/hour (b) Maps - Reproduction (Minimum Order $1.00) Blueline Brownline (I) 11-in. x 17-in. Sheets (Assessor Maps, etc.) . . . . . . . . . . . .$0.50. . . .$0.75/per sheet (2) 18-in. x 26-in. Sheets (Road Maps, etc.) . . . . . . . . . . . . . . . .$1.15. . . .$1.60/per sheet (3) Miscellaneous Maps (Wall Maps, C.S. Maps, etc.) . . . . . . . . $ 0.35. . . .$0.50/per sq. ft. (c) Microfilm Prints - ALL ORDERS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1.00/each sheet (d) Xerox Prints. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0.10/each Xerox 2080 Prints. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . .$1.20/ln. ft. (e) Microfiche. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . .$0.35/each (f) Map Certification. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . .$2.00/each set (g) Road and Subdivision. Standards & Specifications Book. . . . . . . .$25.00/book (h) Grading Plan Review in Conjunction w/Issuance of Grading Permit. . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$135.00/plan (i) Non-Single Family Building Permit Review in .Conjunction w/Issuance of Building Permit. . . . . . . . . . . . . . . .$ 85.00/permit 1111 E. Mill St. , Bldg. 1 San Bernardino, CA 92415 (714) 383-1011 LAND U5E FEE SCHEDULE SUMMARY (Effective 7-1-83) See Ord. 02755 for complete fee eehedule .PAGE 1 LAND EIIS PLANNING DEVELOPMENT REVIEW TOTALS E.R.4 Filing Total E.R.6 Filing Total Filing K.R1 Filing Total . . SITE APPROVAL a. Public [fearing Site Approval 129 + 882 = 1.011 16 + 155 = 171 .54 (80") 145 + 1,091 a 1,236 (1316") b. Non-Hearing Site.Approval 129 + 411' = 540 16 + 155 = 171 54 (80") 145 + 620 a 765 ( 845") 2. MAJOR DEVIATION - a. Major Deviation - Area 129 + 294 = 423 -- 27 129.+ 321 = 450 b. Major Deviation - Structure 294 = 294 -- --- -- 294 a 294 m X c. Lot Size Major Deviation Filed 149 = 149 »- --- 149 a 149 _ H Concurrent with Another Project p� 3. ZONE CHANGE/DISTRICT CHANGE a. 1-10 acres 129 + 588 = 717 --- 27 129 + 615. a .744 b. Over 10, to 25 acres 129 + 588 a 717 + 35.25/ao for ea --- 27 129..+ 615 a 744 + 35.25/ae for ea' ao over 10 ac over 10 _ c. Over 25, through 100 acres 129 + 1.118 = 1.247 + 17.50/ao for ea --- 27 129 + 1,145' a 1,274 + 17.50/80 for ea i ac over 25 ac over 25 d. Over 100. through 500 acres 129 + 2,441' a 2,570 + 12.25/ao for ea --- 27 129 + 2,468 a 2,597 + 12.25/ac for ea ac over• 100 ac over 100 N e. Over 500 acres 129 + 7.149 = 7,278 + 5.75/ae for ea -- 27 129 + 7.176 a 7.305 + 5.75/ac for ea 0 J ac over 500 ao over 500 f. Filed Concurrent with GPA NO CHARGE ___ _- -., c+ J. 4. PLANNED UNIT DEVELOPMENT - 0 Residential• s•a. 0-100 Unit 129 + 1,177 a 1,306 + 11.50/U 16 .+ 240 a 256 + .55 ea/U 107 145 +. 1.524 a 1,669 + 12.50/1) o b. 101-500 Units 129 + 2,354 a 2,483 + 8.75/U for ea 16 + 240 a 256 + .55 ea/U 107 145 + 2,701 a 2.846 + .55/U for all U U over 100 3 + 8.75/U over 100 o. 501-1.000 Units 129 + 5,885 a 6,014 + 5.75/U for ea 16 + 240 ■ 256 + .55 ea/U 107 145 + 6,232 . 6.377 + .55/11 for all U CO U over. 500 6 + 5.75/U over 500 1 d. 1.001 Units and Up 129 + 8.621 = 8.956 + 2.75/U for ea 16 + 240 a 256 # .55 ea/U 107 145 + 9.174.a 9.319 + .55/U for all U it over 1,000 8 + 2..75/U over 1000 Nonresidential: a. 0-10 acres 129 + 1,177 = 1.306 16 + 240 ■ 256 + .55 ea/ae 107 145 + 1.524 = 1.669 �D b. 10.01-25 acres 129 + 1.177 = 1,306 + 35.25/ac for 16 + 240 = 256 + .55 ea/ac 107 145 + 1,524 a 1.669 +. 35.25/ac for ea C ea ac over 10 ac over 10 n c. 25•.01-100 acres 129 + 2,354 = 2.483 + 17.50/ac ,for 16 + 240 = 356 + .55 ea/ac 107 145 + 2.701 a 2.846 + 17.50/ac for earD ea ac over 25 ac over 25 p d. Over 100 acres 129 + 8,827 = 8.956 + 12.25/ac for 16 +.240 = 256 + .55 ea/ac 107 145 + 9.174 = 9.319 + 12.25/ae. for ea ea ac over 100 ae over 100 N 5. TENTATIVE TRACT** 129 + 1.177 = 1,306 + 16/lot 16 + 497 a 513 + 5.35/lot 107 145 + 1.781 a 1,926 + 21.35/lot N a. Filed Concurrent with or Subsequent 129 + 588 = 717 + 5.75/lot 16 + 497 = 513 + 5.35/lot --- 145 + 1.085 a 1.230 + 11.10/lot 00 to Planned Unit Development (PUD) W b. Revised Tentative Map (except when 294 = 294 -- -- - 294. a .294 required by conditions of approval) c. Refile within 180 days of Expiration 129 + 588 = 717 + 5.75/lot 16 + 497 a 5,13 + 5.35/lot 107 145 + 1,192 a 1,337 + 11.10/lot d. Fi"Ling fee when filed concurrent 588 = 588 + 5.75/lot 497 a 513 + 5.35/lot 107 1.192 a 1.192 + 11.16/lot with MOBILEHOME, RVP, LSH or PRO e. Reversion of Subdivided Land to 117 = 117 -- --- -- 117 a 117 Acreage 'o 6. MO_BILENO?IE PARKaa/REC. VEHICLE PARK , a. Site. Approval pproval 3 Development Plan 129 + 1,177 = 1,306 + 11.50/3p 16 + 240 a 256 + .55/sp 107 145 + 1.524 a 1.669 + 12.05/ap CD b. When filed w/Tentative Tract (See 5.d.) 0 • N '..• LAND EH3 PAGE 2 PLANNING DEVELOPMENT REVIEW TOTALS E.R.■ Filing Total E.R.■ Filing Total Filing E.R.■ Filing Total 7. MINOR SUBDIVISION a. Permit 80 + 411 = 491 16 + 96 = 112 27 96 + 534 = 630 b. Refile within 180 days of expiration 80 + 208 = 288 16 + 96 = 112 27 96 + 331 = 427 c. Certificate of Compliance -- + 411 = 411 96 = 96 27 --- 534 = 534 d. Combination Minor Subdivision/C of C 80 + 411 = 491 16 + .96 = 112 27 96 + 534 x 630 8. GENERAL PLAN AMENDMENTS a. 0-100 acres 129 + 1.765 = 1.894 + 11.50/ac or ptn --- 27 129 + 1.792 = 1.921 + 11.50/ac or ptn rn thereof thereof x b. Over 100, through 500 acres 129 + 2.942 = 3.071 + 8.75/ac or ptn --- 27 129 + 2,969 = 3,098 + 8.75/ac or ptn thereof thereof c. Over 500, through 1.000 acres 129 + 6,473 = 6,602 + 5.75/ac or ptn --- 27 129 + 6.500 = 6.629 + 5.75/ac or ptn thereof thereof C d. Over 1,000 acres 129 + 9.416 = 9.545 + 3/ac or ptn --- 27 129 + 9,443 = 9.572 + 3/ac or ptn 9. SPECIFIC PLAN thereof thereof = a. 1-100 units 129 + 1.177 = 1,306 + 11.50/1) 107 129 + 1,284 = 1,413 + 11.50/11 b. Over 100, through 500 units 129 + 2.354 = 2.483 + 8.75/U for ea --- 107 129 + 2.461 = 2.590 + 8.75 U/for ea U over 100 U over 100 N c. Over 500, through 1.000 units 129 + 5,885 = 6,014 + 5.75/1) for ea --- 107 129 + 5,992 = 6.121 + 5.75 U/for ea o U over 500 U over 500 c d. Over 1,000 units 129 + 8,827 = 8,956 + 3/U for ea -- 107 129 + 8,934 = 9.063 + 3/1.1 for ea U U over 1,000 10. LARGE SCALE HOUSING PROJECT,■■ over 1,000 � PLANNED RESIDENTIAL DEVELOPMENT _711 Site Approval o a. Plan 129 + 1.177 = 1.306 + 11.50/U 16 + 240 ■ 256 + .55/U 107 145 + 1,524 = 1,669 + 11.50/1] b. When filed concurrent with a 129 +. 882 = 1,011 16 + 2110 x 256 + .55/11 107 145 + 1.229 s1.374 00 w Tentative Tract 11. LOT LINE. ADJUSTMENT 117 = 117 --- -_ 117 = 117 4�- 12. APPEALS (Including Planning 117 = 117 -_ --_ 117 = 117 Commisslon for General Plan Interpretation) 13. EXTENSIONS 117 = 117 --- --- 117 = 117 14. FINDINGS OF CONFORMANCE 129 + 411 = 540 -- --- 129 + 411 = 540 15. OFF-SITE SUBD. SIGN LOCATION PLAN 129 + 411 = 540 --- --- 129 + 411 = 5110 16. ALTERATIOtl TO A NON-CONFORMING USE 129 + 411 = 5110 --- -_- 129 + 411 = 540 17. REVISED CONDITIONS OF APPROVAL, 294 - 294 _-_ _ subject to 294 = 294 public hearing 18. DEPT. REVIEW OF LAND USE 6 DEV. 117 x 117 --- --- 117 = 117 'PROJECTS (determined by Bldg.B Sfty.) NOTE: Concurrent files require only one set or the Environmental Review Forms and fees. cc] fD ■ Application for Environmental Review (E.R.) LEGEND: ac = acre ea = each to s N p portion sp = space U = unit 0 ■" 5% Affordable Housing credit for each 101 increment of Affordable housing for tentative tracts, mobllehome parks and large scale housing projects. fi (This 1 pplies to the TOTAL FEE, not Just the Planning portion.) N Late application fee resulting from DEHS enforcement action to be collected IN ADDITION to the $511.00 DEH3 Land Review fee. ARCHIV@O/PLA006(Rev 6-27-83) Exhibit "C" Resolution No. 83-49 Pace .1 of 10 Adopted 9/22/83 ORDINANCE NO. I755 AN ORDINANCE OF THE COUNTY OF SAN BERNARDINO. SECTION 3.Section 16.023A of the San Bernardino County STATE OF CALIFORNIA, AMENDING SAN BERNARDINO Code is amended to read as follows: COUNTY CODE SECTION 16.021 RELATING TO FEES 16.023A Auditor/Controller-Recorder. CHARGED BY THE AGRICULTURAL COMMISSION; 16.023 (a) Auditing Fee................................S28.00 RELATING TO FEES CHARGED BY THE ASSESSOR; 16.023A (b) Management Services Fee .....................S22.00 RELATING TO FEES CHARGED BY THE AUDITOR/ (c) Special assessment processing fee ......S I.00lassessmenc CONTROLLER-RECORDER;. 16.024 RELATING TO FEES or$0.20 if customer furnishes tape CHARGED BY BUILDING AND SAFETY; 16.026 RELATING TO FEES CHARGED BY THE CLERK OF THE BOARD; SECTION 4. Section 16.024 of the San Bernardino County 16.028 RELATING TO FEES CHARGED BY THE COUNTY CLERK; 16.0211 RELATING TO FEES CHARGED FOR Cade is amended to read as follows: ENVIRONMENTAL ANALYSIS; 16.0212 RELATING TO FEES 16.024 Building and Safety. CHARGED BY FLOOD CONTROL;16.0213E RELATING TO (a) Building Permit Fees . . . FEES CHARGED BY ENVIRONMENTAL HEALTH SERVICES; (1) SI.00 to S1,000.00 ......................$24.00 16.0215 RELATING TO FEES CHARGED FOR REVIEW OF (2) Over SI,000.00 to and LAND USE AND BUILDING REGULATIONS: 16.0219 including$2,000.00......................S24.00 RELATING TO FEES CHARGED BY THE PROBATION plus S2.40 for each additional SIOO.00 or DEPARTMENT; 16.0220 RELATING TO FEES CHARGED BY fracton thereof over S1,000.00 THE PUBLIC ADMINISTRATOR AND CORONER; 16.0225 (3) Over S2,000.00 to and RELATING TO FEES CHARGED BY THE TRANSPOR- including$25,000.00.....................S48.00 TATION DEPARTMENT; 16.0228 RELATING TO FEES plus S7.00 for each additional $1,000.00 or CHARGED BY THE SURVEYOR; AND 16.0229 RELATING fraction thereof over S2,000.00 TO FEES CHARGED BY WEIGHTS AND MEASURES. (4) Over S25.000.00 to and The Board of Supervisors of the County of San Bernardino, including SSO,000.QO....................S209.00 State of California, does ordain as follows: plus S6.00 for each additional$1.000.00 or SECTION I.Section 16.021(b)(4),(d)and(f)are amended and fraction thereof over S25,000.00 (n)is added to the San Bernardino County Code to read as follows: (5) Over S50,000.00 to and including S 100.000.00...................S359.00 16.021 Agriculture. plus S3.60 for each additional$1,000.00 or fraction thereof over S50.000.00 (b) Quarantine Certification Fees. (6) OverSIOO,000.00......................S539.00 Apiary Inspection plus$2.40 for each additional S1,000.00 or (4) Pary pec -American fraction thereof over S100,000.00 Foul Brood Control ..........S19.00/hr./Biologist (7) Plan Review Fees. When a plan or other data is With$19.00 as the minimum fee required to be submitted by Section 302 of the Uniform Building Code,a plan review fee shall be paid to the Director of Building and (d) Dust Control Ordinance. Safety at the time of submitting plans and specifications for review. (1) Permits. Said plan review fees for buildings and structures (A) Agriculture .............S5.00 plus S.351acre shall be ninety percent(90%)of the building permit fees as set forth (B) Nonagriculture ........$2.00/acre,$150 Min. in the preceding schedule. Where plans are incomplete, or changed so as to (1) Pest Control. require additional plan review,an additional plan review fee shall be (1) Pest Control Operator Annual charged at a rate of S24.00 per hour with a minimum charge of Registration Fee SI8.00. (renewable January 1) ................SSO.00/year (b) Electrical Permit Fees. Any person filing an application (2). Pest Control Advisor Annual for a permit to do electrical construction shall pay a fee according to Registration Fee the following schedule, at the time of filing. (renewable January 1) ...............:S 10.00lyear (1) Electrical Services: or S5.001year if already registered (A) Each service switch 600 volts in another county or less and not over 200 amperes......S 12.00 (3) Pest Control Pilots Annual . (B) Each service switch 600 volts Registration Fee or less and over 200 amperes (renewable January I) ................SIO.00/ye3r to 1,000 amperes ...................S30.00 or S5.001year if already registered (C) Each service switch over 600 volts in another county or over 1.000 amperes...............S60.00 (4) Pest Control Maintenance Gardeners (2) The following permit fees are based on the actual Registration Fee area of the occupancies listed,determined from exterior dimensions, (renewable January 1) ................S25.00lyear and include all lighting fixtures,switches, receptacles and the circuit wiring thereof and are in addition to the fee for the electrical service. (n) Apiary Inspection-disease abatement .....SI9.00/hour An additional fee shall apply to each motor, transformer or other S19.00 minimum electrical appliance that exceeds fifty (50)units, in accordance with SECTION 2.Section 16.023(e)is amended and(i), (j)and(k) the alternate fee schedule in this subsection (b). are added to the San Bernardino County Code to read as follows: (A) Warehouse, scorage garages and 16.023 Assessor. aircraft hangars where no repair work is done.............S.005/sq.ft. (e) Name and address lisulmaiiing labels: (B) All occupanices not listen, up to (I) Minimum fee ...................S150.00/request and including 5,000 sq.ft.........S.025/sq.ft. (2) List or mailing labels.................SO.081parcel (C) A!I occupancies not listed - that part (3) List and mailing labels................SO.I Olparcel which is over 5.000 sq.ft. ........S.01 isq.ft. (3) Plan Review Fees. Where no plan review fee is (i) Photocopy fee.......................S 1.00 first copy charged under Section 16.024(a)of this Code and an electrical plan is $0.10 each additional required to be submitted, a plan review fee of one-half ('ii) the (j) Assessor Records fee............S2.00 per parceliname electrical permit fee shall be paid at the time of submitting plans and (k) Sales Data Inspection................S I0.001inspection specifications for review. Exhibit "C" Resolution No. 33-49 Pape 2 of 10 (4) Alternate Fee Schedule. Alterations, additions and (12) For each water distribution system on new construction where no structural work is being done or where private property,with over 5 connections .S30.00 it is impractical to use the square footage schedule,convert to units Over 10 connections,each................S 3.00 as follows: (13) For each swimming pool, including all (A) For each motor or appliance, necessary piping: each horsepower ....................I unit Public .................................$42.00 (B) For each transformer or appliance, Private ................................$30.00 each kilowatt or kilovolt-ampere .......I unit (14) For repair or alteration of drainage (C) For each 3 oudets, each 3 lighting or vent piping...........................S 6.00 fixtures or fraction thereof, where (15) For each lawn sprinkler system on any current is used or controlled...........I unit one meter, including backflow protection (D) For multi-outlet assembly(festoon devices therefor.........................S 7.00 type,plug mold,etc.)each 20 feet......I unit (16) For vacuum breakers or backflow protective (E) Unit Application:- devices on tanks, vats, etc., or for - Up to and including I unit............S 2.40 installation on unprotected plumbing fixtures, Over I.not over 10.................S 6.00 including necessary water piping: Over 10,not over 50................S12.00 I to 5 .................................S 6.00 Over 50,not over 100...............S24.00 Over S.each ...........................S 1.00 Over 100...........................S36.00 (II) Plan Review Fees. Where no plan review fee is (5) Temporary Service: charged under Section 16.024(a)of this Code and a plumbing plan is (A) Temporary or construction service, required to be submitted, a plan review fee of one-half(%:) the including poles or pedestals,each......S 12A plumbing permit fee shall be paid at the time of submitting.plans and (B) Approval for temporary use of permanent specifications.for review. service equipment prior to completion of structure or final inspection,each......S 7.00 (d) Mechanical Permit Fees. Any person filing an application (C) Additional secondary or for a permit to do mechanical construction shall pay a fee,according supporting poles,each........... ...$ 4.00 to the following schedule, at the time of filing: (6) Miscellaneous: (1) For the installation or relocation of each (A) Area lighting standards................S4.00 forted-air or gravity-type furnace or burner, (B) Private residential swimming pools, including ducts and vents attached to such .including supply wiring, lights, appliance, up to and including motors and bonding.................S12.00 100,000 B.T.U.s ........................S 7.00 (C) Commercial swimming pools..........S24.00 (2) For the installation or relocation of each (D) Temporary sales stand, including forced-air or gravity-type furnace or burner service connections,ecc. .............$18.00 including ducts and vents attached to such (E) Inspection for reinstallation of idle appliance,over 100,000 B.T.U.s ...........S 8.00 meter(removed by utility company)....S 7.00 (3) For the installation or relocation of each (F) Any electrical work for which a permit floor furnace,including vent...............S 7.00 is required, but no fee is herein (4) For the instillation or relocation of each provided,a fee of...................S 18.00 suspended heater, recessed wall heater, or (7) Illuminated Signs: Floor-mounted unit heater ................S 7.00 New, relocated, or altered: (5) For the installation, relocation or Up to and including 5 sq.ft...............$ 8.00 replacement of each appliance vent installed Over 5,not over 25 sq.ft.................S 10.00 and not included in an appliance permit......S 4.00 Over 25,not over 50 sq.ft................S 12.00 (6) For the repair of, alteration of, or addition Over 50,not over 100 sq.ft...............S 16.00 to each heating appliance, refrigeration unit, Over 100,not over 200 sq.ft.............$19.00 cooling unit, absorption unit, or each heating, Over 200,not over 300 sq.ft.............S22.00 cooling, absorption, or evaporative cooling All over 300 sq.ft....................S.07/sq.ft. system, including installation of controls (8) Overhead Line Construction: regulated by the Uniform Mechanical Code ..S 7.00 Poles and anchors,each ..................S.4.00 (7) For the installation or relocation of each (In addition, all applicable fees boiler or compressor, to and including 3 hp shown in this schedule shall apply.) or each absorption system to and including (c) Plumbing Permit Fees.Any person filing an application for 100,000 B.T.U.s ........................S 7.00 a permit to do plumbing work shall pay a fee, according to the (8) Fob•the installation or relocation of each following schedule:at the time of filing: boiler or compressor. (1) For each plumbing fixture or trap (A) Over 3 hp to and including 15 hp, (including water, drainage piping or each absorption system over and backflow protection therefor)..........S 5.00 100,000 B.T.U.s to and including (2) For each building sewer...................$12.00 500,000 B.T.U.s....................S12.00 (3) For each private sewer line with over (B) Over 15 hp, to and including 30 hp. 5 building sewer connections ..............S30.00 or each absorption system over Over 10 building sewer connections,each ...S 3.00 500.000 B.T.U.s to and including (4) For each private sewage lift station 1,000.000 B.T.U.s ..................$16.00 or sump pump,rated up to I hp ...........S 6.00 (C) Over 30 hp, to and including 50 hp, Over I hp,add per rated horsepower.......S 1.00 or for each absorption system over (5) For each cesspool .......................S18.00 1,000,000 B.T.U.s co and including (6) For each septic tank......................$18.00 1,750.000 B.T.U.s ..................S24.00 (7) For each complete private sewage (D) Over 50 hp, or each absorption system disposal system..........................S36.00 over1,750,000 B.T.U.s..............S40.00 (8) For each water heater and/or vent..........S 5.00 (9) For each air handling unit: (9) For each gas piping system (A) To and including 10,000 cubic feet I to 5 outlets...........................S 6.00 per minute including ducts attached For each gas piping system of chereto............................S 5.50 6 or more outlets,per outlet..............$ 1.00 (B) Over 10.000 cubic feet per minute.....S 9.00 (10) For each industrial waste pretreatment NOTE: This fee shall not apply to an air incerceptor, including its trap and vent, handling unit which is a portion of a factory excepting kitchen-type grease interceptors assembled appliance, cooling unit, evaporative functioning as fixture traps................S 8.00 cooler, or absorption unit for which a permit (11) For installation, alteration or repair of water fee is prescribed elsewhere in this section. piping and/or water creating . (10) For each evaporative cooler other each ........................S 5.00 than portable ............S 5.50 equipment, fro type........... 2 Exhibit "C" Pace 3 of 10 Resolution No. 83-49 (11) For each ventilation fan connected (f) Miscellaneous Permit and Inspection Fees.Schedule of fees to asingle duct..........................S 4.00 not otherwise provided for in this section: (12) For each ventilation system which is not a (1) Permit Issuance Fee: portion of any heating or air conditioning In addition to the fees prescribed in the system authorized by a permit.............S 5.50 Electrical, Mechanical, Plumbing and (13) For the installation of each hood, other than Solar Energy schedules for each such permit a Type I grease hood, served by mechanical on a single application form ...............S 12.00 exhaust, including the ducts from, (2) Minimum total fee for any permit ...........530.00 such hood..............................S 6.00 (3) Field investigation and report..............$48.00 (14) For each Type I grease hood, including (4) Short-term installation: the exhaust system ......................S 18.00 Temporary-construction- (15) For the installation or relocation of each material processing ........:............5100.00 domestic-type incinerator.................S 8.00 Approved temporary tents................S60.00 (16) For the installation or relocation of each (5) Special Inspector approvals................$24.00 commercial or industrial-type incinerator....$30.00 (6) Standard Plans: (17) For each appliance or piece of equipment Fee to establish standard plan .............Regular regulated by the Uniform Mechanical Code, Plan review fee,with minimum of..........S36.00 but not classed in other applicance categories, Comparison plan.review fee...............S 12.00 or.for which no other fee is listed in Annual renewal .........................S36.00 this section.............................S 6.00 (7) Service charge for cash deposits (18) Plan Review Fees. Where no plan review fee is and ocher sureties.......................S30.00 charged under Section 16.024(a)of this Code and a mechanical plan (8) Relocation Inspection and Setdown Permit Fees: is required to be.submitted, a plan review fee of one-half('h) the (A) Relocation Inspection Fee when a mechanical permit fee shall be paid at the time of submitting plans building is co be moved: and specifications for review. I building the same property(e) Grading Permit Fees. () P P y••••••••••.S60.00 (1) Any person filing an application for a permit to do (11) From one property to another grading work shall pay a fee according to the following schedule,at within the County.............S 120.00 the time of filing. (III) From outside the County.......S180.00 The fee for a grading permit authorizing additional When the structure is located more than fifty work to that under a valid permit shall be the difference between the (50)miles outside the boundaries of the County of San Bernardino, fee paid for the original permit and the fee shown for the entire the Department of Building and Safety may request and reimburse a project. local agency in that area for an on-site inspection and report. (A) 100 cubic yards or less ...............S 18.00 (B) Setdown Permit Fees. (B) Over 100 cubic yards, co and (1) Group R-3 Occupancies up to including 1,000 cu.yds-,,i*...**,***, ds. ..............S18.00 2,000 square feet in area including plus SI 1.00 for each additional all fees.......................S180.00 100 cu. yds. or fraction thereof (11) Group R-3 Occupancies 2,000 over 100 cu. yds. square feet and over in area including (C) Over 1,000 cubic yards, to and all fees.......................$300.00 including 10,000 cu.yds. ............SI 11,00 (111) Group M-1 Occupancies plus S 11.00 for each additional including all fees...............S 60.00 100 cu. yds. or fraction thereof (IV) All ocher Occupancies- fee based over 100 cu. yds. on the valuation of the work per (D) Over 10,000 cubic yards, to and Section 16.024(a)of this Code, plus including 100,000 cu.yds. ...........S216.00 all'required electrical, mechanical, plus$36.00 for each additional plumbing and solar energy fees. 10,000 cu. yds. or fraction thereof (9) Annual Permits. over 10,000 cu. yds. (A) I to 10 employees.... ........ .S 120.00 (E) Over 100,000 cu.yds. ..............S540.00 (B) I I to 75 employees......................S240.00 plus$18.00 for each additional (C) 76 to 150 employees................S360.00 10.000 cu. yds. or fraction chereof (D) 151 to 300 employees...............S600.00 over 100.000 cu. yds. (10) Land Use Fees: (2) .Plan Review Fee.For excavation and fill on the same (A) Minor Deviations, minor site approvals, site, the fee.,shafl be based on the volume of the excavation or fill, director reviews. T-Standard whichever is greater. Before accepting a sec of plans and reviews.for each...................S120.00 specifications for review, the Director of Building and Safety shall (B) Appeals filed on the above collect a plan review fee. Separate permits and fees shall apply to actions,for each...................S 120.00 retaining walls or major drainage structures as indicated elsewhere in - (C) Where no plan.review fee is charged under this section.There shail be no separate charges for standard terrace Section 16.024(a)of this Code and none of the actions shown in this drains and similar facilities. The amount of the plan review fee for subsection(11)have been requested and a plot plan is submitted for grading pans shall be as set forth in the following schedule.The plan review,a plot plan review fee of sixty dollars(S60.00)shall be paid ac review fee for a grading permit authorizing additional work to chat the time of submitting the plot plan for review.Should one of the under a valid permit shall be the difference between such fee paid for actions in (A), above, be found to be needed during the plot plan the original permit and fee shown for the entire project. review and the sixty dollars(S60.00)plot plan review fee having been (A) 100 cu.yds.or less.................S 12.00 paid,the fee prescribed in(A)above may be reduced by sixty dollars (B) Over 100 cu. yds. to and including (S60.00). 1,000 cu.yds. .....................S 24.00 (11) Professional Report Review. The fee for review of (C) Over 1,000 cu. yds, to and including professional reports submitted for approval which requires review by 100.000 cu.yds. ...................S 24.00 a consultant to the County shall be the actual fee charged by the plus SI5.00 for each additional consultant, plus a service charge far.administration and handling of 10,000 cu. yds. or fraction thereof thirty dollars (S30.00). No portion of this fee is refundable unless over 10,000 cu. yds. accepted in error. (D) Over 100,000 cu. yds. to and including (12) Rehabilitation and Demolition Processing Fees 200,000 cu.yds. ...................$159.00 pursuant co Section 63.0617 of this Code: plus$11.00 for each additional (A) Preparation of job specifications ......S 180.00 10,000 cu. yds. or fraction thereof (B) Board of Supervisors'approval .......S 55.00 over 100,000 cu. yds. (C) Contract performance inspection .....S 55.00 (E) Over 200,000 cu.yds. ..............S269.00 (D) Billing............................S 30.00 plus S5.00 for each additional (E) Record special assignment ...........S 90.00 10,000 cu.yds. or fraction thereof (13) Wire and/or wood fences..............S 18.00/lot over 200,000 cu. yds. (14) Residential driveway approach ............S 30.00 3 Exhibit "C" Resolution No. 83-49 - PaOe 4 of 10 (15) Document Copy Fee: 2.100 517 172 Per document side ...................S I.00 2,201 534 111 Single plan sheet.....................$8.00 2,300 552 183 CertificadO�fee..........................S2.50 2,400 568 189 (g) Permit Fees for Residential Buildings:The building permit 2,500 585 194 fee and the plan review fee for-one-,two-,and three-story buildings, 2.600 599 200 housing only groups R and M occupancies shall be computed from 2,700 614 205 "Table A" and"Table B"in this subsection.The permit fee from 2.800 629 211 "Table B includes all inspection fees for all phases of the 2,900 643 214 construction including issuance fees, sewer connection or disposal 3,000 656 219 permit fees, residential driveway approach permit fees, temporary 3,100 668 223 construction power pole permit fee, and permit fee for temporary 3,200 685 229 construction shed that is removed prior co final inspection. This 3.300 696 232 subsection (g) shall not apply to roof-covering repairs or to 3,400 707 236 residential aluminum patio covers constructed in addition to existing 3,500 721 241 buildings. The permit fee for roof-covering repairs is to be 3,600 732 244 determined in accordance with Section 16.024(a)of this Code.The 3,700 743 248 permit fee for residential aluminum patio covers constructed in 3,800 753 252 addition to existing buildings shall be as prescribed in Section 3,900 764 255 16.024(i) of this Code. 4,000 773 258 The adjusted floor area used in "Table B" shall be 4,100 783 261 computed from "Table A" by multiplying the actual area of each 4,200 791 265 . use,determined from exterior dimension,by the appropriate factor. 4.300 800 266 4.400 807 270 TABLE A' 4.500 816 272 USE FACTOR 4.600 823 275 Uving areas,including basements and cellars.................1.00 4,700 829 277 Gars and store buildin 0.50 4,800 836 279 Garages storage gs............................. Porch,patio,carport....................................0.20 4,900 841 280 Raised floor decking............... ... .... ...0.20 5,000 850 284 Slab only(when requested for record)......................0.10 Over 5,000 Add S7.00 Add$2.00 Masonry fireplace(for each firebox)................Add 60 sq.ft. per 100 sq. ft. per 100 sq. ft. Retaining walls and masonry fences ........................0.20 or portion or portion Air-supported and film-covered agricultural buildings..........0.10 thereof thereof Milking barns ..........................................0.80 Agricultural building-with open sides.....................0.10 'For State of California approved factory-built housing, the plan Other agricultural buildings............................ 0.20 review and permit fees shall be 50%of the fees prescribed by this 'When converting from one use to another use the factor shall be Table,rounded up to the nearest dollar. the difference between the factor for the new use and the factor 'Fee for any area exceeding the stared square feet shall be at the for the existing use(i.e.,when converting a garage to living area next higher figure. the factor will be 1.00 less 50 = .50). For remodeling, repair, alteration and rehabilitation in existing (h) Permit Fee for Swimming Pools. The building permit fee buildings,'the factor is to be determined by dividing the valuation of for new swimming pools shall be as prescribed in this subsection.The the new work by the valuation of the existing building. The permit fee includes plan review fees as shown below and all valuations to be determined by the prealteradon inspection. inspection fees for all phases of the construction including permit issuance fees,electrical permit fees,mechanical permit fees,plumbing TABLE B' permit fees and solar energy permit fees. These fees are in addition to the fee prescribed in Section 16.02138 of this Code. .. Adjusted Plan Review (1) Swimming pools accessory to single-family dwellings: Arent Permit Fee Fee (A) With a Standard Plan ...............S 120.00 (Square Feet) (Dollars) (Dollar) (B) With Other than a Standard Plan......S 144.00 (2) All other swimming pools: 50 20 7 (A) With a Standard Plan ...............S 174.00 100 31 11 (B) With other than a Standard Plan......$198.00 150 42 13 (3) Spas and/or Hot Tubs...................S 60.00 200 53 17 (i) Permit Fee for Residential Aluminum Patio Covers. The 250 63 22 building permit fee for residential aluminum patio covers constructed 300 73 25 in addition to existing buildings shall be thirty-six dollars (S36.00) 350 83 29 which includes plan review and permit issuance fees.When the patio 400 92 32 cover is to be constructed from a San Bernardino County Standard 450 102 36 Plan or an International Conference of Building Official Standard Soo III 40 Plan, the fee shall be thirty dollars (S30.00) which includes 550 126 43 comparison plan review and permit issuance fees. 600 143 48 (j) Fee Refunds. 650 162 54 (1) The Building Official may authorize the refunding of 700 183 61 any fee paid hereunder which was erroneously paid or collected. 750 206 68 (2) The Building Official may authorize the refunding of Soo 228 75 not more than eighty, percent(80%)of the permit fee paid when no 850 250 84 work has been done under a permit issued in accordance with this 900 273 91 Code. 950 296 99 (3) The Building Official may authorize the refunding of 1,000 320 107 not more than eighty percent (80%) of the plan review fee paid 1,100 338 114 when an application for a permit for which a plan review fee has been 1,200 358 119 paid is withdrawn or cancelled before any plan reviewing is done. 1,300 377 126 (4) The Building Official may authorize the refunding of 1,400 395 132 not more than eighty percent(80%)of any land use fee paid when 1,500 416 139 the request for the land use action is withdrawn or cancelled before 1.600 431 144 any work by the Department has been done. 1,700 449 150 In no case shall the Building Official retain more than fifty 1.800 466 111 dollars(S50.00)of the fees paid,as described in numbers(2).(3)and 1,900 484 162 (4) above, nor shall he refund any amount of said fees less than 2,000 499 168 thirteen dollars(S13.00). 4 Exhibit- "C" Resolution No3-49 Paae 5. of 10 The Building Official shall not authorize the refunding of (b) The fee for Environmental Impact Reporss and any fee paid except upon written application filed by the original Environmental Review Board Determination Y permittee not later than one hundred eighty(180)days after the date which is in addition to initial filing fee. of fee payment. Preparation Fee.........................S32.00/hour (k) Exemptions.There shall be an exemption from all permit, Deposit Required .........................SI,000.00 plan review and inspection fees as set forth in this section,when all (c) Request for Environmental Review Board of the following conditions exist: Determination on the Single Use of an (1) The building permit is for rebuilding or rehabilitating Environmental Impact Report(S-EIR)...........$129.00 a structure because of damage caused by and occurring in the course If amendments or addenda to an existing of a disaster. Environmental Impact Report are required, (2) The Board of Supervisors has adopted a resolution the following fee will apply in addition to the declaring a state of emergency due to the disaster,for damage caused. S-EIR filing fee...........................S32.001hour by and occurring in the same disaster, and If a new Environmental Impact Report is required (3) The application for the building permit is filed with by the Environmental Review Board, the the Department of Building and Safety within one hundred and eighty fees for.preparing EIRs will apply.....(see Sec. 16.0211(b) (180) days after the resolution of the Board of Supervisors and 16.0211(f)[ mentioned in (2)above. (d) Information Report/Negative Declaration. (1) Solar Energy Permit Fees.Any person filing an application Fee...................................$32.00/hour ................... for a permit to do solar energy work shall pay a fee according to the Deposit required..........................S I,000.00 following schedule, at the time of filing: If a Negative Declaration is not granted by the (1) For Collectors Environmental Review Board, completion of an (including related piping and regulating devices): Environmental Impact Report is required. The fees (A) Up to 1,000 sq.ft. ...................S4.00 for preparing EIRs will apply in addition to the (8) Over 1.000 sq. ft., not over initial filing fee and 2.000 sq.ft..........................S6.00 Information Report Fee. ...........[see Sec. 16.0211(b) (C) Over 2.000 sq.ft.....................S6.00 and 16.0211(f)) plus S2.00 each additional 1.000 sq. ft.. (e) Environmental Administrative Guidelines or fraction thereof over 2,000 sq. ft. for Local Entities(E.A.G.L.E.)..............S5.001copy (2) For Storage Tanks plus mailing charges (including related piping and regulating devices): (f) Coordination Fee for Consultant-Contracted (A) Up to 750 gallons ....................S3.00 Environmental Impact Reports, Information (B) Over 750 gallons. not over Reports and other studies, and for Environmental 2.000 gallons........................S4.00 Review Board Determination. The following fees (C) Over 2.000 gallons...................S4.00 will apply in addition to the initial filing fee. plus$2.00 for each additional 1,000 gallons, Coordination fee........................S32.00/hour or fraction thereof over 2.000 gallons Deposit required ...........................S600.00 (3) For Rock Storage: (g) Mining and Reclamation Plan Review. (A) Up to 1,500 CU.ft. ...................S3.00 Fee....... ...........................S32.00/hour (B) Over 1.500 cu. ft., not over Deposit required $600.00 .................... 3.000 cu.ft.:.........................S4.00 (h) Environmental Document Reproduction Costs.actual cost (C) Over 3,000 cu.ft.....................S4.00 plus mailing plus S2.00 for each additional 1.000 cu. ft., The fees required by this Section are in addition to the fees or fraction thereof over 3,000 cu. ft. required by any other Section which involves a discretionary project (4) For each appliance or piece of equipment within the meaning of the California Environmental Quality Act. regulated by the Uniform Solar Energy Code SECTION 8. Section 16.0212(b)(2), (4), (5). (6)(D), (7), (c), for which no fee is listed...................S3.00 (d)and(g)of the San Bernardino County Code are amended to read NOTE: These fees, (1) through (4) above, do not as follows: include permit fees for any parts of the solar system 16.0212 Flood Control. which are subject to the requirements of ocher applicable codes. (b) Permits and Permit Amendments. (5) Plan Review Fee. Where no plah review fee is charged under Section 16.024(a)of this Code and a plan is required (2) General and Miscelllaneus Use. to be submitted"for the solar energy system, a plan review fee is (A) Filing Fee(Nonrefundable)...........S200.00 required to be submitted for the solar energy system,a plan review (8) Annual Inspection Fee.......S300.00/annually fee of one-half('/) the solar energy permit fee shall he paid at the time of submiamg plans and specifications for review. (4) Parallel Utilities. SECTION S. Section 16.026(a) of the San Bernardino County (A) Underground. Code is amended to read as follows: (1) Filing Fee(Nonrefundable) ......S200.00 (a) Recordings of Hearings,per tape ...............S20.00 (11) Inspection Fee .........SO.501LinealFoot SECTION 6. Section 16.028 of the San Bernardino County S300.00 minimum fee Code is amended to read as follows: (8) Aerial. 16.028 County Clerk. (I) Filing Fee(Nonrefundable) ......S200.O,O ...SO.25iLineal Foot Fee ..... (a) NCR forms ..............................S.IOlfortn (11) Inspection5250.00 minimum fee Non-NCR forms,printed single-sided ........S.05/form (5) Major Construction. Non-NCR forms,printed c+vo-sided..........5.071form A Filing Fee Nonrefundable (b) Postage charges shall be added to all mail orders. ( ) g (Nonrefundable).•..•.••.•.S200.00 (c) Sales tax, as appropriate, will be charged. (B) Inspection Fee...................S20.001hr.This section does not require payment by the Federal (1) Vehicle Mileage..............SO.351mi.(6) Soil Removal or Select Disposal. Government, the Stare of California.or by any county,city district, or other public body in the State, except as otherwise specified by (D) Over 10.000 cu. yds. law. Other Stac-escablished fees are included in a special schedule (I) Filing Fee(Nonrefundable) ......5200.00 published the County Clerk. (11) Admin.and'Insp.Fee ......SO.IO/cu.yd. SECTION 1. Section 1 of the San Bernardino County (Nonrefundable) borrow Code is amended to read ass follows: SO.20/cu. yd. 16.0211 Environmental Analysis. disposal (a) Initial filing for Environmental Review. (7) Apiary Rental Site on Property ....SO.40 per colony (1) All Initial Environmental Determination (A) Minimum Fee......................S 40.00 except Minor Subdivisions................$129.00 . . . (2) Minor Subdivisions......................S 80.00 (c) Plans and Specifications. (3) Environmental Review by the Land.Development (1) Plans and Special Provisions ...............S12.00 Division of the County Surveyor's Office ...S 16.00 (2) Mailing charge,if applicable.............. S 3.00 5 Exhibit "C" Resolution No. 83-49 Page 6 of 10 (d) Reproduction Services. (C) DEHS Administrative Surcharge....S I S.00/yr. (1) Research and handling...............$10.001order (20) Temporary Trailer Paris.......S25.00/ea.operation (2) Maps and Plans. (21) Mobilehome installation and accessory structure (A) Bmwnline.....................$0.301sq.ft. permits. (As set forth in Section 1040, Mobilehome Parks Act, (B) Blueline.......................S0.201sq.ft. Chapter 2, Tide 25. Authority Sections 18300 and 18502.5, (C) From microfilm ................S0.201sq.ft. California Health and Safety Code.) (3) Miscellaneous documents(letter size)....S0.10/page (22) Dairies and Milk Production: (A) Permit Fee: (g) Flood Hazard Analysis.................$I00.001report (1) Milk peddler................S30.001yr. SECTION 9. Section 16.0213B(a)(1), (3), (8) and (10) are (11) Milk store..................S60.00/yr. amended and(18)is added and the balance of(a)and(b)of the San (III) Milk distributor .............$100.00/yr. Bernardino County Code are amended to read as follows: NOTE: A twenty-five percent (25%) penalty 16.02138 Environmental Health Services, fee will be added to the fees in subsection (a) Permits. (22)(A)(1) and (III); and a fifty percent (50%) (1) Public Eating Place penalty will be added to the fee in subsection (Seating or customer capacity): (22)(A)(11); for failure to make application for 0-39 .............................$ 80.001yr. yearly renewal within thirty(30)days of annual 40-79 ............................S 120.001yr, expiration date, or for failure to apply for a 80-119 ...........................S 160.00/yr. permit in the case of a new business or seasonal 120-159 ..........................S200.00/yr. operation, before opening for business or 160-up ...........................S240.001yr. before commencing operation. NOTE: In computing drive-in restaurant seating (8) Inspection Fee: capacity, each parking space shall be calculated as (1) Dairy Farm: equivalent to a seadng capacity of 2 persons. (i) 3 to 299 cows.........S40.00/mo. (ii) 300 to 599 cows.......S40.001mo. (3) Food Handling Places, Food Processors. (iii) 600 to 999 cows.......S40.00/mo. Warehouses, Wholesalers, Bakeries, Grocery, (v) I,000 or more cows....S40.001mo. Vegetable, and Meat Markets. (Total The above fees to be paid by the square footage to include the entire producer or distributors of operation, including, but not limited to, market milk storage rooms, display areas, toilets and (11) Milk Products Plant......S0.002(2 mills) dressing rooms,and any other space required per gallon of market milk per month by law for operation of the establishment): (maximum S 150.00 per month) 0-999 sq.ft........................S 60.001yr. Fees are to be paid quarterly and are 1,000-1,999 sq.ft...................SI00.001yr. due fog payment on January 1, April I, 2,0W-2,999 sq.ft...................$140.00/yr. July I, and October I of each year. When 3,000-3,999 sq.ft...................S 180.00/yr. a quarteriy payment is delinquent 4,000 sq.ft.and up..................S220.001yr, thirty(30) days,a penalty equal to ten _ percent(10%)shall be added to the (8) Itinerants: fee due. (A) Food concessions at fairs. circuses. (23) Sewage Holding Tanks: special events,and traveling shows (A) Sewage holding tank operating (1) 1 -5 days, per permit(a yearfy permit) ...........S55.001yr. concession.............S25.00/loadon (B) Sewage holding tank construction (11) 6- I I days, per permit, (a permit good for the period concession.............S40.00/location of time while other construction permits (B) Food concessions at large-sale or building permits are in force special events and effect).........................S30.00 (I Packaged food handling only, (C) Multiple ownership septic systems .S100.001yr. I-3 days food handling .only, ...550.00 NOTE: A fifty percent(50%) penalty shall be plus S15.00 each additional day over added to the fees in subsection(23)for failure (11) Food_preparadon to make application for yearly renewal within I-3 days.....................$100.00 thirty(30) days of annual expiration. plus S15.00 each additional day over (24) Temporary Dependent Housing: (A) Initial permit application.............S 185.00 (10) Public Swimming Pools(housing unit) ....S50.00/yr. (B) Biannual renewal...................SI 10.00 each additional pool.......... yr. ................S 50.00 ..S50.00/ (25) Home Occupation: Public Swimming Pools(commercial).....S75.001yr. A Home occupation.initial application....S50.00 Pools operated by recreation districts, ( ) P PP public schools, and other public (8) Annual renewal..................S25.00/yr. districts...............................Exempt (C) Appeal............................S50.00 (b) Other fees. (I8) Hazardous Wane Generator Permit (1) Apartment House, Hotel, and Motel Regulations. 0-9 employees.....................S 81.00/yr. (A) Certificate of Occupancy. 20-99 employees...................S I50.00/yr. (I) Apartment house..............$100.00 100-499 employees.................S250.00/yr. (11) Hotel,motel and resorts........S 25.00 500 and up employees................S300.00/yr. (2) Mobilehome and Recreational Parks. (19) Mobilehome park, travel trailer park, A Transfer or thane of ownership 515.00 recreational vehicle park, incidental (3) Plan Check and Form Review Fees. camping area and tent camps, or any (A) Public eating establishments: combination thereof. Seating capacity 0- 39............S 50.00 ( )A Annual Permit........... ..525.00!r •••••• y•. Seating capacity 40- 79............S 75.00 plus S2.00 per lot or camping parry, Seating capacity 80-119............S 100.00 plus(B) and(C) below: Seating capacity 120-159............S125.00 (B) State Fee: Seating capacity 160-u S 150.00 Number of Lots or (1) Remodel existing permitted Camping parties State Fee establishment .....50%of plan check fee 2-49.........................S 75.001yr. (B) Food handling establishments: 50-99........................S 125.00/yr. 0- 999 sq.ft. ................S 50.00 100-;99......................S225.00/yr. 1,000-1,999 sq.ft. ................S 75.00 500 or more ...................S350.00/yr. 2,000-2.999 sq.ft. ................S 100.00 6 Exhibit "C" Page 7 of 10 Resolution No. 83-49. 3.000-3,999 sq.ft. ................$125.00 (13) Environmental Health Education 4,0W sq.ft.-up...................S150.00 Training and Special Inspections (1) Remodel existing permitted (not covered by permit fee)............S35.001hr. establishment .....50%of plan check fee or fraction thereof (C) Swimming pools and special use pools: (14) Food Industry Retail Service - 0- 799 sq.ft. ................S 75.00 Training Certificate 800-2.499 sq.ft. ................S100.00 Certificate only ..........................$5.00 2,500 sq.ft.-up...................$150.00 Duplicate certificate.......................$3.00 Water slides.......................$150.00 (15) Keeping of Exotic Animals (D) Sewage Plans, Reports,and Permits. Accessory Use Application...............S 100.00 (1) Lot plan and soil review.........S 70.00 (16) On-site Improvement Bond processed (11) Single family dwelling by the Department of Environmental percolation test report review ...$ 60.00 Health.................................$75.00 (III) Commercial development (17) Designated Maintenance Areas percolation test report review ...$120.00 (A) Individual system permit (IV) Subdivision percolation fees ......................$40.00 for 2 yrs. test report review .............S 120.00 including permit and survey plus S3.00/hr. (8) Contractors registration fee........S20.00/yr. or part of an hour, after the first (18) Registration and authorization to certify four hours that a waste disposal system is in (V) Alternative/experimental compliance with the standards and sewage disposal system review....$60.00 requirements of Chapter 6 of Division 3, plus S35.00/hr. over 2 hrs. Title 3 (on-site individual waste (VI) FHA and VA approvals: disposal systems within Designated (i) Tract maps...............I S20.00 Maintenance Areas) ..............S 15.001fiscal yr. plus$5.00 ea. additional copy beginning fiscal year 1981/82 (ii) Sewage approval NOTE: A fifty percent (50%) penalty shall be added to plans...........S 10.00 for 2 copies the fees in subsections(6),(7)and(17)for failure to make plus$5.00 ea. additional 2 copies application for yearly renewal within thirty (30) days of (iii) Sewage approval annual expiration. fortes .....................S5.00 . . . (E) Water plans. (I) Plan checking ..................S50.00 (11) Field inspection .............$35.00/hr. SECTION 10.Section 16.0215 of the San Bernardino County or fraction thereof Code is amended to read as follows: (F) Organized camps and 16.021S ' Land Use and Building Regulations. boarding schools....................S85.00 (a) Fees for Zoning Regulations. Additions or alterations..............$35.00 (I) R-I District-Accessory Uses Permitted. (G) Dairy farm plan check and (A) On-site Subdivision sign. sanitary construction inspection ......$200.00 Application(DEHS) ................S 53.00 -Dairy farts reoccupancy 12-month Extension(DENS).........S 59.00 sanitary inspection ................:S 50.00 Appeal(DEHS) ....................S 32.00 (4) Duplication of Records Late application promulgated by Copies of documents,per page.............S0.10 DEHS enforcement action...........S 53.00 Certification.............................S5.00 (B) Temporary Real Estate Office. (5) Special Laboratory Examination Fee Application(DEHS) ................S 53.00 (A) Milk samples,per examination.........$10.00 Extension(DENS)..................S 59.00 Standard Place Count Appeal(DEHS) ....................S 32.00 Coliforn Counc Late application promulgated by Laboratory Pasteurization Count DEHS enforcement action...........S 53.00 (8) Water, Sewage, Soil, and Hazardous (2) General Provisions and Exceptions. Materials Analysis. (A) Temporary Trailer Coach Use Permits. (1) Total coliform count..S20.00/initial exam Annual Permic(DEHS)..............S 118.00 additional exam S10.001ea. Renewal of Same(DENS)............3118.00 (11) Fecal coliform count ..$20.00/initial exam Appeal(DEHS) ....................S 32.00 additional exam S10.001ea. Late application promulgated by (III) Standard place count..S20.00/initial exam 'DEHS enforcement action...........S 80.00 additional exam S10.00/ea. (8) Site Approvals. (IV) Other analysis...............S35.00/hr. Filing Fee-Public Hearing or fraction thereof Site Approval......................S882.00 (6) Application for Domestic Water Filing Fee-Nonhearing Systems Permit: Site Approval......................S411.00 (A) State small system................S30.001yr. Administrative Review and Approval...S 32.00 (8) Noncommunity system ...........S50.00/yr. Drainage Review by Land Development (C) Community system Division of the County (1) Less than 100 service Surveyor's Office on connections ...............S 150.00/yr. Site Approvals.....................S 155.00 (II) 100 or more service Review by DEHS...................S 54.00 connections ...............S150.00/yr. Late application promulgated by (7) Well Driller Registration (renewable DEHS enforcement action...........S 80.00 January 1)..........................S 20.00/yr. (C) Signs Adjacent to Freeways. (8) Real Estate Letter.......................$20.00 (1) Directional. (9) Backflow Prevention Device Application...................S 59.00 Tester Certification...................510.00/yr. Appeal(DEHS).................S 32.00 (10) Mosquito Control Services.............$35.001hr. Late application promulgated by or fraction thereof, second visit DEHS enforcement action.......S 80.00 (II) Sanitary Survey.. .....................535.00/hr. (11) Temporary On-site Subdivision Signs. or fraction thereof Application(DENS) ............S 53.00 (12) Reinspecdons of Commercial Poultry Renewal(DEHS)...............S 59.00 Operations as provided in Section 32.119(c) Appeal(DEHS)................S 32.00 of this Code............................S35.00 Late application promulgated by per each inspection DEHS enforcement action.......S 80.00 7 Exhibit "C" page 8 of 10 Resolution No. 83-49 (III) Temporary Off-site Subdivision Signs. (C) Review by Land Development Division Application(DEHS)............S 53.00 of the County Surveyors Office for Appeal(DEHS)................S 32.00 all filings on PUDs..................S240.00 12-month Extension(DEHS).....S 59.00 plus S0.55/unit Appeal(DEHS)................S 32.00 (D) Review by DEHS...................$107.00 Late application promulgated by (b) Subdivision Code. DEHS enfortemenc action.......S 80.00 (1) Fees, Bonds and Deposits. (D) Findings of Conformance..S41 I.001plan review (A) Tentative Tracts. (E) Off-site Subdivision Sign (1) Filing Fee....................S1,177.00 Location Plan ....:..........$41 1.00/review plus S16.0011ot (F) Alteration to a (II) Review by Land Nonconforming use..........S411.001hearing Development Division of (3) Deviations. the County Surveyor's Office (A) Filing of Application- for all filings on tentative Major Deviations...................S294.00 tracts........................S497.00 (Q -Review by DEHS ..............S 27.00 plus S5.35/loc (III) Filing fee when filed concurrent (B) Lot size major deviation when filed with or subsequent to a PUD....S588.00 concurrent with any ocher project ....S 149.00 plus$5.7511ot (4) Amendment and Changes of District. (IV) Revised Tentative Map (except (A) Filing Fee for projects of: when required by conditions I 0-10 acres...................S588.00 ....S294.00 () of .............. (11) Over 10 acres, to and (V) Refiling of expired subdivision including 25 acres..............S588.00 application approval within plus S35.25/acre for each acre 180 days of expiration..........S588.00 or portion thereof over 10 acres plus S5.75/lot (III) Over 25 acres, to and (VI) Filing fee when filed concurrent including 100 acres...........S1,118.00 with a mobilehomelrecreational plus S17.501acre for each acre vehicle park, or large sale or portion thereof over 25 acres housing project................S588.00 (IV) Over 100 acres, to and plus S5.75/1ot including 500 acres...........S2,441.00 (VII)Review by DEHS ..............S 107.00 plus S 12.251acre for each acre (B) Revert subdivided land to acreage.....S 117.00 or portion thereof over 100 acres (C) Final Map. (V) Over 500 acres ..............$7,149.00 Checking fee...................Actual Cost plus$5.751acre for each acre Deposit required...................S200.00 or portion thereof over 500 acres plus S15.001lot ,(B) Filing Fee when filed in conjunction (minimum deposit S750.00) with a filing for a General Plan (D) Engineering Fees: Amendment for the sine project S 1.00 co S25,000........4%of value of work boundary.....................No Charge Over S25,000 to and including (C) Review by DEHS...................S 27.00 S100,000.............31/1%of value of work (5) Use of Permanent Mobilehomes for Over S100,000..........3%of value of work Residential Purposes. Inspection Fees: R-1-DM, DL, DA, A-1 and A-2 Districts S 1.00 to S25,000........I%of value of work Permits and Inspection Fees(DENS). Over S25,000 co and including (A) Certificate of Occupancy ............S 165.00 S 100,000.............7/8%of value of work (B) Appeal...........................S 25.00 Over S 100,000.........r/%of value of work 6 Planned Unit Developments. (E) Subdivision Agreement time ( ) P extension request..................$214.00 (Residentials) (F) Final Flood Hazard Report......$42.00/report (A) Filing Fee for projects of: (2) Parcel Maps (1) 0-100 units ......... $1,177.00 (A) Checking Fee......................S330.00 plus S11.501unit plus S20.001parcel (II) 101-500 units ..............S2,354.00 (8) Checking fee for all resubdivisions plus S8.751unit for each unit of an entire lot or parcel created on over 100 units a final map or parcel map recorded (111) 501-1,000 units.............S5,885.00 after)anuary I, 1960................S125.00 plus S5.751unic for each unit (c) Mobilehome/Recreational Vehicle Pants. over 500 units (1) Establishment of Mobilehome/Recreaconal (IV) 1,001 units and over..........S8,827.00 Vehicle Park. plus$2.75/unit for each unit (A) Site approval and development plan..$1.177.00 over 1,000 units plus$11.50/space (Nonresidential) (B) Filing fee wher.filed concurrent (8) Filing fees for nonresidential PUD with tentative tract.................S550.00 projects. For PUD projects which include plus S5.50/lot both resident and nonresidential uses (C) Engineering and Inspection Fee .4%to S25,000 (other than public service support 3'h% to S75,000 uses) the per acreage fees itemized below 3% over$100.000 will be charged for the nonresidential (D) Site Review by Land Development uses, in addition to any fees required Division of the County Surveyor's above. Office for all filings on (1) 0-10 acres .................S1,177.00 M.H.P./R.V.Pants.................S240.00 (11) 10.01-25 acres.............:S 1.177.00 plus S .55/space plus S35.25/acre for each acre (E) Review by DENS...................S 107.00 or portion thereof over 10 acres (d) Minor Subdivision. (III) 25.01-100 acres.............$2.354.00 (1) Application............................$411.00 plus S17.501acre for each acre (2) Refiling of expired minor subdivision application or portion thereof over 25 acres approval within 180 days of expiration .....S208.00 (IV) Over 100 acres..............$8,827.00 (3) Exemptions and Certificates of Compliance .S411.00 plus S12.251acre for each acre (4) Fee for a combined application for a minor or portion thereof over 100 acres subdivision and certificate of compliance....S411.00 8 Exhibit;."V Page 9 of 10 Resolution No. 83-49 (5) Review by Land Development Division filing fee will be made, regardless of the extent of work done in of the County Surveyor's Office...........S 96.00 processing the application. (6) Review by DEHS .......................S 27.00 (1) Public Roadway Improvement Fee. (e) Special Zoning. (1) Public Roadway Improvements required (1) Control of Blowing Sand and Soil Erosion. Engineering Fees: (A) Agriculture permits. S 1.00 to S25,000.00..........4%of value of work (1) No soil disturbance ...........S2.501yr. Over S25,000.00 to and plus S .25/acre including 5100,000.00.......3%z%of value of work (11) Sail disturbance ...............S 15.00 Over SI00,000.00............3%of value of work plus SI.001acre over 15 acres Inspection Fees: (2) Airport Operating Areas and Height $1.00 to S25,000.00..........1%of value of work Standards and Limits therein. Over S25,000.00 to and (A) Nonconforming Use Permit..........S 10.00 including S100,000.00.......718%of value of work (B) Variances: Over S100,000.00...........'/%of value of work (1) Permit.......................S 50.00 (2) Request for Waiver of Public (11) Appeal.......................S 50.00 Roadway Improvements..............S55.00leach (I) General Plan Amendments for projects of: (m) Lot line adjustment..........................$117.00 (1) 0-100 acres.........................S1,765.00 (n) Dam Systems Research plus$11.50/acre or portion thereof Request .....................S32.00 for the first hour (2) Over 100 acres, to and or any portion thereof: including 500 acres....................S2,942.00 plus S8.001each 15 minute plus S8.751acre for each acre increments subsequent to first hour or portion thereof over 100 acres (o) Appeal of land use decisions(except as (3) Over 500 acres, to and identified under specific land use actions)........S 117.00 including 1,000 acres ..................S6,473.00 (p) Revised conditions of approval, plus S5.75/acre for each acre subject to public hearing .....................S294.00 or portion thereof over 500 acres (q) Appeal to Planning Commission for (4) Over 1,000 acres .....................S9,416.00 interpretations of the General Plan.............SI I7.00 plus S3.001acre for each acre (r) Department Review of Land Use and or portion thereof over 1.000 acres Development Projects.......................$117.00 (5) Review by DEHS .......................S 27.00 (s) Flood Hazard Analysis by Flood Control (g) Specific Plans. District of Land Use Proposals affecting (1) 0,100 units.........................S1,177.00 flood control facilities or creating possible plus$11.50/unit flood hazards...............................$100.00 (2) 101-500 units.......................$2,354.00 (t) Special Use Permits(DEHS) plus$8.751unit for each unit over 100 (1) Temporary Dependent Housing (3) 501-I,000 units .....................$5,885.00 (A) Initial permit application.............$185.00 plus$5.75/unit for each unit over 500 (B) Biannual renewal...................SI 10.00 (4) 1,001 units and over ..................$8,827.00 (C) Appeal...........................S 50.00 plus S3.00lunit for each unit over 1,000 (2) Home Occupation (5) Review by DEHS .......................S 107.00 (A) Initial permit application.............S 50.00 (h) Large-Scale Housing Project, '(B) Annual renewal..................$25.001yr. Planned Residential Development or (C) Appeal...........................S 50.00 Site Approval and Development. (3) Keeping of Exotic Animals :..............S 100.00 (1) Plan......:.........................$1,177.00 (u) Agricultural Preserves and (2) When riled concurrent with Agricultural Preserve Contracts a tentative tract........................$882.00 (1) Agricultural Preserve Disestablishment (3) Review by DEHS ..._...................S 107.00 (A) For projects of (4) Review by Land Development Division (1) 0-10 acres...................$535.00 of the County Surveyor's Office (11) Over 10 acres, to and for all filings on L.S.H./P.R.D./ including 25 acres..............S535.00 site approvals..........................S240.00 plus S32.001acre for each acre or plus S .551unit portion over 10 acres (i) Extensions(except as specified above)..........S 117.00 (III) Over 25 acres, to and Whenever an approval or a permit extension is requested including 100 acres...........$1,016.00 and the project delay was caused solely by reason of the application plus S16.001acre for each acre or of a governmental law, regulation, ruling or judgment which legally portion thereof over 25 acres prevented that further carrying on of the project,then the Planning (IV) Over 100 acres, to and Director may waive any extension request fee-upon proof of facts including 500 acres...........S2,220.00 submitted in writing which satisfy the conditions set forth above. plus$10.00/acre for each acre or Any such waiver shall have no bearing on the determination of the portion thereof over 100 acres merits of the extension request. (V) Over 500 acres..............$6.500.00 (j) Affordable Housing Credit. A reduction of the filing fee plus$5.25/acre for each acre or for a subdivision,mobilehome park/recreational vehicle park or large- portion thereof over 500 acres scale mobilehome project will be granted to Affordable Housing (2) Agricultural Preserve Contract projects at the following rate: Cancellation For each 10%increment of Affordable Housing......5% (A) For projects of reduction of filing fee (1) 0-100 acres ................SI,605.00 (k) Refunds. Where the applicant voluntarily withdraws the plus S10.00/acre or portion thereof application, the following refunds will apply: (II) Over 100 acres, to and (1) Application is accepted, including 500 acres...........S2,675.00 o plus S8.00/acre for each acre or no further work done............90/o of filing feeonion thereof over 100 acres (2) Notification of hearing n III Over 500 has been made mine000 acres .........S5,885.00............75/o of filing fee ( ) acres, to and includin 1 (3) Subdivision Committee Meeting including .1,000 been held...................50%of filing fee plus S5.251acre for each acre or (4) Staff report has been written ......25%of filing fee portion thereof over 500 acres (5) Planning Commission has (� I Over 11,000 acres ............S8,560.00 begun consideration ..........:.......No refund plus S2.501acre for each acre or Where a staff error at the initial counseling session results portion thereof over 1.000 acres ' in mandatory withdrawal of-the application, a 100% refund of the (3) Agricultural Preserve Contract preparation and recordation .........S85.00/parcel 9 Exhibit "C" ' Resolution No. 83-49 page 10 of' 10 SECTION II.Section 16.0219 of the San Bernardino County (1) 30 copies of map and Code is amended to read as follows: 30 copies of legal description .............S 80.00 16.0219 Probation. (2) Additional charge after 4 hours .........S20.001hr. _ (a) Support Payment Fee,per payment.........2%flat rate (b) All Ozalid Printing.......................Actual Cost (b) Community Responsibility Training (c) Microfilm Prints. Unit Reimbursement Rate......................$65.00 (1) All orders..........................Actual Cost (c) Kuiper Youth Center Reimbursement Rate.......S62.02 (d) 'Xerox Prints............................Actual Cost (d) Verdemont Boys'Ranch Reimbursement Rate.....$53.21 Xerox 2080 Prints(ONLY) ...............Actual Cost (e) Juvenile Hall Reimbursement Rate...............S60.24 (e) Microfiche..............................Actual Cost (f) Installment processing fee .....................$30.00 (f) Map Certification...........................S 2.W SECTION 12. Section 16.0220(e) is added to the San (g) Road and Subdivision Standards. Bernardino County Code to read as follows: and Specifications Book......................S 25.00 (e) Certification fee.........................I....S 1.00 includes tax and postage SECTION 13.Section 16.0225 of the San Bernardino County (h) Grading Plan Review in Conjunction Code is amended to read as follows: with Issuance of Grading Permit...............S 135.00 16.0225 Transportation. (i) Nonsingle Family Building Permit (a) Highway Permits. Review in Conjunction with Issuance (I) Issuance Fees: of Building Permit...........................S 85.00 (A) Parade............................S 15.00 SECTION 15. Section 16.0229(a)(5), (7), and (9) of the San (B) Overweight and overdimension Bernardino County Code are amended to read as follows: single trip permit...................$ 15.00 16.0229 Weights and Measures. (C) Annual or repetitive moving .........S 75.00 (a) Fees for checking noncommercial (D) Construction......................$ 15.00 weighing and measuring devices: Encroachment Permit...............S 15.00 (GSubdivisions.......................S 15.00 (5) Platform meat beam, and ) Excavations.......................S 15.00 overhead crack scales.....................$14.00 (H) Tree Removal.......................no fee (b) Inspection Fees: (7) Prescription scales and (1) Open Trench Excavation: analytical balances .......................SI8.00 (A) Minimum fee up to 300 LF ofcrench .........................S 60.00 (9) Tank compartment: (B) Minimum fee for 30 1-500 LF (A) Capacity of 1.000 gals.or less.........S 18.00 oftrench .........................S 90.00 (8) Overl,000 gals..................S18.60fhr. (C).For each additional 100 LF or SECTION 16.This ordinance shall take effect on July 1, 1983. fraction therof.....................S 4.00 (2) Driveways: CAL McELWAIN, Chairman (A) Residential........................S 25.00 Board of Supervisors (B) Commercial.......................S 25.W ATTEST: (c) Service Connections: ANDREE DISHAROON, Cleric of (1) Each connection under annual permit ......S 4.00 the Board of Supervisors (2) Each connection not under annual permit...S 25.00 STATE OF CALIFORNIA I (3) County patch(Mountain area)............S250.00 COUNTY OF SAN BERNARDINO 1 ss' (d) Project Plans ...Special Provisions: 1, ANDREE DISHAROON,Cleric of the Board of Supervisors (I) Persec charge'. ...applicable ...............S 13.00 of the Count of San Bernardino,State of California,hereby certify (2) Mailing charge,if applicable...............S 3.00 r r (e) Processing Fee-Road Abandonment: that at a regular meeting of the Board of Supervisors of said County (1) Abandonment investigation ..............SI50.00 and State,held on the 2nd day of May, 1983.ac which meeting were (2) Processing approved abandonment ........S200.00 present Supervisors John Joyner, David L McKenna; Robert 0. (f) Reproduction Services: Townsend; Robert L. Hammock; and the Clerk, the foregoing (1) Research and handling...............SIO.00/order ordinance was passed and adopted by the following vote, to wit: (2) Maps and Plans: AYES; Supervisors Joyner, McKenna, Townsend, Hammock. (A) Brownline.....................SO.30fsq.ft. NOES: None. (B) Blueline.......................SO.201sq,ft. ABSENT: Supervisor McElwain. (C) From microfilm ................SO.20fsq.ft. IN WITNESS WHEREOF, I have hereunto set my hand and (3)"Miscellaneous documents(letter size)....SO.101page affixed the official seal of the Board of Supervisors this 2nd day of 4 County road maps(complete book May, 1983. ( ) ry p p ) ...Bernardino Bounty ANDREE DISHAROON. SECTION d Senior folio 8 of the San Bernardino County Clerk of the Board of Supervisors Code is amended to read as follows: of the County of San Bernardino. 16.0228 Surveyor. State of California. (a) Maps and Legal Description Preparation. 10