Loading...
2006-02 RESOLUTION NO. 06-02 RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF GRAND TERRACE APPROVING CUP-06-03, SA-06-05,AND E-06-06 TO CONSTRUCT A WIRELESS TELECOMMUNICATION TOWER AND EQUIPMENT AT 12745 ORIOLE AVENUE,AT ROBINSON HALL OF CHRIST-THE-REDEEMER CATHOLIC CHURCH,IN THE R1-7.2 DISTRICT WHEREAS,the applicant, Omnipoint Communications, Inc.,has applied for the approval of Conditional Use Permit 06-03, Site and Architectural Review Case No. SA- 06-05, Environmental Review Case No. E-06-06 to construct a wireless telecommunication facility to be located at 12745 Oriole Avenue, Grand Terrace (Robinson Hall of Christ-The-Redeemer Catholic Church), in the R1-7.2 District; and WHEREAS, a properly noticed public hearing was held by the Planning Commission on July 06, 2006; and WHEREAS,pursuant to the California Environmental Quality Act (CEQA), this project qualifies for a Negative Declaration under E-06-06 in that said proposed project will not have a significant effect on the environment. NOW THEREFORE,BE IT RESOLVED by the Planning Commission of the City of Grand Terrace that the following findings have been made in accordance-with the approval of CUP-06-03 and SA-06-05. T 1. The proposed wireless telecommunication facility will not be detrimental to the general health, safety, morals;comfort, or general welfare of the persons residing or working in the neighborhood of the proposed use or within the City. 2. The architectural design of structures,their materials, and colors are visually harmonious with surrounding development and natural landforms; are functional for the proposed project; and are consistent with the Grand Terrace Municipal Code. Said materials will match existing materials and colors of Robinson Hall of Christ the Redeemer Catholic Church to which it will be attached.. 3. The project will not have a detrimental effect on the neighborhood or within the City. It does not interfere with other communication facilities,radio, and television frequencies or other. 4. There is no indiscriminate clearing of property, destruction of trees or natural vegetation or the excessive and unsightly grading of hillsides, thus the natural beauty of the city, its setting and natural landforms are preserved. The subject site is developed as a Catholic Church. 5. Conditions of approval for this project necessary to secure the purposes of the Grand Terrace Municipal Code and General Plan are made a part of this approval as set forth in the accompanying Resolution of Approval. 6. The proposed use will not be injurious to property or improvements in the neighborhood or within the City. As conditioned below, the project will not have a detrimental or injurious effect on any physical property or improvements in the neighborhood or within the City. The development of the project is conditioned to meet building codes,F.A.A. regulations, aesthetic elements of Site and Architectural Review, site developments for the Zone District and mitigate any future impact of health issues as determined by the Federal Government. 7. The proposed use is consistent with the latest adopted General Plan. The current General Plan designates the land use of low density residential (R1-7.2 Zoning). This proposed project meets the General Standards and Special Standards under the Wireless Telecommunication Facilities Ordinance (GTMC 18.71.070). BE IT FURTHER RESOLVED that SA-06-05,E-06-06, and CUP-06-03 are hereby approved subject to the following conditions: 1. The proposed project shall be constructed in accordance with the Site and Architectural Review as approved by the Planning Commission of the City of Grand Terrace on July 06, 2006. All plans shall be consistent in terms of property lines, easement location and dimensions and other measurements.. Minor changes or clarifications must be approved by the Community Development Department and may be made by the Director. 2. The applicant shall comply with all recommendations listed in the Building and Safety/Public Works Department Conditions of Approval dated April 5, 2006. Refer to Attachment A. 3. The applicant shall comply with all recommendations listed in the San Bernardino County Fire Marshall Fire Conditions and Guidelines dated April 22, 2006. Refer to Attachment B. 4. Prior to the issuance of permits for this project by the Department of Building and Safety/Public Works, the applicant shall have obtained whatever clearances and permits are required from the appropriate State and Federal agencies including the Public Utilities Commission of the State of California and the Federal Communications Commission. _ 5. The applicant will apply and submit four copies of plans for appropriate building permits for the facility equipment,tower, and antennas, lighting, grading, and - any other applicable permits. 6. Any significant expansion or change of use will be reviewed by the appropriate City, County, State or Federal Agencies. Additional permits and/or amendments to the Conditional Use Permit may be necessary. No future antennas shall be added to the tower which are not enclosed within the church tower. 7. All aspects of the proposed project, including the building and landscaping/ irrigation will be maintained in a clean and functional manner in accordance with this approval and the overall goals and objectives of the City of Grand Terrace. Any graffiti placed on the facility equipment, including the tower, must be removed by the applicant within 48 hours of notification by the City of Grand Terrace. 8. The proposed antenna tower and equipment enclosure shall be painted and finished to match the existing building to which it will be attached. 9. The following conditions from the City's Wireless Telecommunications Ordinance No.171 shall be complied with: a. The applicant shall agree to indemnify, hold harmless, and defend the City, its officers, agents, and employees from any and all liability or claims that may be brought against the City from its approval of a permit. b. A letter outlining the terms of the lease with the property owner shall be submitted to the City prior to issuance of a building permit for the facility. If the lease is extended or terminated, notice and evidence thereof shall be provided to the Community Development Director. Upon termination or expiration of the lease, the use permit for the facility shall become null and void and the facility removed within 90 days. c. Certificate of continued use of each approved facility shall be submitted on a yearly basis at the time of business renewal for as long as the facility remains in operation. This certification shall indicate that the facility is operating as approved and that the facility complies with the most current Federal Communication Commission(FCC) safety standards. Facilities which are no longer in operation shall be removed within 90 days after the date of discontinuation. d. If no annual certification is provided, the use permit for the facility may be revoked by the Community Development Director. Prior to revoking a permit, the Director shall provide the owners of record written notice of their failure to provide the annual certification and an opportunity for hearing. e. Prior to issuance of a building permit for the facility, applicant may be required to provide deposit with the City for removal of the facility and any accessory wireless equipment if such facility is found to be abandoned or the use permit is revoked by the director. f. Notice of change of ownership of the facility shall be provided to the City. g. Within 90 days of commencement of operation, applicant shall provide a preliminary report and/or field report prepared by a qualified engineer that shows the operation of the facility is in conformance with the standard established by the American National Standards Institute (ANSI) and Institute of Electrical and Electrical and Electronics Engineers (IEEE) for safe human exposure to electromagnetic fields (EMF) and radio frequency radiation(RFR). h. All changes and modifications to an approved facility shall require prior approval by the City. i. All graffiti and other forms of vandalism shall be promptly removed and/or repaired within 24 hours. 12. These conditions shall apply to the entire parcel at 12745 Oriole Avenue, Grand Terrace. NOW,THEREFORE,THE PLANNING COMMISSION OF THE CITY OF GRAND TERRACE HEREBY APPROVES SAR-06-05,CUP-06-03 AND E-06- 06 BASED ON THE ABOVE FINDINGS. PASSED AND ADOPTED by the Planning Commission of the City of Grand Terrace, California, at a regular meeting held on the 6th day of July, 2006. AYES: Chair Wilson , Vice Chair Addington, Commissioner Comstock Commissioner McNaboe , Commissioner Phelps NOES: None ABSENT: None ABSTAIN: None ATTEST: J Brenda St4fill Mesa Doug Wilson City Clerk Chairman, Planning Commission APPROVED AS TO FORM: John Harper City Attorney Building and Safety/Public Works Department Conditions of Approval Date: April 5,2006 Applicant: T-Mobile Address of Applicant: 3 Imperial Promenade,Suite 1100, Santa Ana, CA 92707 Site Location: 12745 Oriole Ave, Grand Terrace, CA 92313 Telephone: ' (909) 446-2857 W.O.#: 12-8.5428, SA 06-05 Provide four (4) construction plans and information for review of the proposed project. Below is a list of the plans and documents needed for plan review. The initial plan review usually will.take three weeks on most projects. You have received a work order number 1278.5248, for the proposed project. This number will be needed to obtain information regarding your plan review. A plan review fee and permit fee will be charged at the time plans are approved and are ready to issue. Provide the following sets of plans and documents. Buildine and Safety submittal's required at first plan review. (4) Architectural Plans (4) Structural Plans (2) Structural Calculations (4) Plot/Site Plans (4) Electrical Plans (4) Precise Grading Plan (1) Water Quality Management Plan, (WQMP) Buildin,e and Safety/Public Works General Information All structures shall be designed in accordance with the 2001 California Building Code, 2001 Mechanical Code, 2001 Plumbing Code, and the 2004 Electrical Code adopted by the State of California. Design all structures to comply with Seismic Zone (4) wind speed 70 MPH, exposure T-Mobile is responsible for the coordination of the final occupancy.T-Mobile shall obtain clearances from each department and division prior to requesting a final building inspection from Building and - Safety. Each agency shall sign the bottom of the Building and Safety Job Card. Page 1 of 2 Building and Safety inspection requests and Public Works inspection request can be made twenty (24) hours in advance for the next day inspection. Please contact (909) 825-3825. You may also request an inspection at the Building & Safety public counter. Toilet facilities shall be provided for construction workers and such facilities shall be maintained in a sanitary condition. Construction toilet facilities of the non-sewer type shall conform at ANSI ZA.3. All construction materials which are not used shall be recycled. Receipts from the recycle company responsible for excepting the materials shall be kept in the construction office for viewing by the City Inspector. Construction projects which require temporary electrical power shall obtain an Electrical Permit from Building&Safety.No temporary electrical power will be granted to a project unless one of the following items is in place and approved by Building and Safety and the Planning Department. (A) Installation of.a construction trailer. or, (B) Security fenced area where the electrical power will be located. Installation of construction/sales trailers must be located on private property. No trailers can be located in the public street right of way. Buildinir Permit Conditions 1. Prior to issuance of permits,site grading and pad certifications shall be submitted to Building and Safety. Prior to concrete placement,submit a certification for the finish floor elevation and set backs of the structure. The certification needs to reflect that the structure is in conformance with the Precise Grading Plans. Compaction reports shall accompany pad certifications. 2. Prior to issuance of building permits, provide a certificate from the Colton Unified School District stating that all school fees have been paid. 3. All construction projects shall comply with the National Pollutant Discharge Elimination Systems, (NPDES). NPDES reports shall be submitted with projects plans at time of plan review. 4. The proposed electrical and any additional utility shall be installed underground to the facility. CADocuments and Settings\Administrator.JEFF-MDE7B30G3\L.ocal SettingATempU-Mobile, 12745 Oriole Ave.wpd Page 2 of 2 COUNTY FIRE DEPART_ ME�'1 ` COUNTY OF SAN BERNARDINC OFFICE OF THE FIRE,MARSHAL COMMUNITY SAFETY DIVISION 620 South "E"Street—San Bernardino, CA 92415-0179 1853 (909)386-8465-(909)386-8463-(909)386-8466 Fax(909)386-8460 APRIL 22,2006 EXPIRATION: APRIL 2007 T-MOBILE FILE: MIS GT06/19306 LOCATION: 12745 ORIOLE AVE.—GRAND TERRACE PROJECT TYPE: ANTENNA INSTALLATION APN: 1178-211-01 PLANNER: RICHARD GARCIA Dear Applicant: With respect to the conditions of approval regarding the above referenced project, the San Bernardino County Fire Department requires the following fire protection measures to be provided in accordance with applicable local ordinances, codes, and/or recognized fire protection standards. The following information of this document sets forth the FIRE CONDITIONS and GUIDELINES,which-are applied to this project. ❑Approved ®Approved w/conditions ❑ Not Approved FIRE CONDITIONS: Jurisdiction. The above referenced project is under the jurisdiction of the San Bernardino County Fire Department herein ("Fire Department'). Prior to any construction.occurring on any parcel, the applicant shall contact the Fire Department for verification of current fire protection requirements. All new construction shall comply with the current Uniform Fire Code requirements and all .applicable statutes, codes, ordinances and standards of the Fire Department. [F-1] Cell Towers. Cell towers that are proposed in the FS1, FS2 or FS3 Overlay Districts with a camouflaged covering [e.g. tree] shall submit four (4) sets of plans to the Fire Department for approval. These plans shall indicate that all such exterior camouflaged coverings shall be of an approved fire resistive material. [F-49] Cell Site buildings. The applicant shall submit two.(2) sets of building plans to the Fire Department for review and approval. When the proposed cell site equipment storage buildings include a fire suppression system four (4) sets . of plans shall be submitted for approval. (Add to plan when applicable) This site is within the FS1, 2 or 3 Overlay District and all such buildings shall have a fire suppression system. [F-50] PSTS Interference. Cell site installation and operation of the proposed system shall not cause harmful interference to the County's Public Safety Telecommunications System (PSTS). If- it is determined that the system causes harmful interference with PSTS operations the cell tower operations shall cease immediately upon order of the Fire Chief or other County official. [F-51] Sincerely, DOUG CRAWFORD, Planning& Engineering Supervisor San Bernardino.County Fire Department Community Safety Division DC:ww E3