2003-02 RESOLUTION NO. 03-02
1 -
RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF GRAND TERRACE,
TERRACE, STATE OF CALIFORNIA MODIFYING THE CONDITIONS OF APPROVAL
OF CONDITIONAL USE PERMIT NO.99-01,SITE AND ARCHITECTURAL REVIEW NO.
99-06 AND ENVIRONMENTAL REVIEW NO. 99-06 AS REQUESTED UNDER
CONDITIONAL USE PERMIT NO. 99-01A23
WHEREAS, the applicant, Thatcher Engineering & Associates, Inc., on behalf of
Swertfeger's Equipment, have applied for the modification of the conditions of approval of
Conditional Use Permit Case No. 99-01, Site and Architectural Review No. 99-06 and
Environmental Review Case No. 99-06 to complete various improvements required by the
original approval including those of Phase 1, 2 and 3 for an additional period of time; and
WHEREAS, a properly noticed public hearing was held by the Planning Commission
on February 20, 2003; and
WHEREAS,the findings that were made by the Planning Commission regarding the
original approval on January 18, 2001 still apply; and
WHEREAS, under the California Environmental Quality Act (CEQA), Article 11,
Section 15164,this approval qualifies as an addendum to the original Negative Declaration
in that the modifications to this project do not affect the status of the Negative Declaration
for the original project in that the finding that there is no substantial evidence that the
project, as modified, will have a significant impact on the environment still applies; and
NOW THEREFORE, BE IT RESOLVED BY THE PLANNING.COMMISSION OF
THE CITY OF GRAND TERRACE, STATE OF CALIFORNIA, AS FOLLOWS:
1. That all conditions and requirements of the original approval by the Planning Commission
on January 18, 2001 for Conditional Use Permit No. 99-01, SA-99-05 and E-99-01 shall
remain in full force and effect except as modified herein.
2. Grading of the site must be completed prior to any paving of the site.
3. That the Business Plan required by the Hazardous Materials Division of the County Fire
Department be updated and kept current as required by that agency.
4. The following Implementation Table and Deadlines shall be complied with:
1
ACTION I DEADLINE
A. Install the Phase I paved access drive and parking area Said Phase I paving of the
with landscaping as soon as possible but no later than the access drive and parking to be
indicated deadline. (Please see Condition No. 14 of the completed by January 18,
original approval.) 2004
B. Complete the installation of the proposed landscaping, as Said landscaping to be
shown on the approved landscaping plan, along Michigan installed by January 18, 2004.
soon as possible but no later than the indicated deadline.
(Please see Condition No. 16 of the original approval.)
C. Install access drive, curb cuts and driveway apron, Said improvements to be
pavement, curb, gutter and sidewalk along Michigan. (Please completed and installed by
see.Condition No. 15 of the original approval.) January 18, 2004.
D. Install landscaping/screening and irrigation along the Said landscaping/screening
northern,western and southern property lines. (See Condition and.irrigation to be installed
No. 21 of the original approval.) by January 18, 2004.
E. Install street light along Michigan. (Please see Condition Said street light to be
No. 22 of the original approval). installed by January 18, 2004.
F. All other requirements of the original approval including Said requirements for the
those for Phase 1, 2 and 3 must be completed. entire project shall be
completed by January 18,
2004.
PASSED AND ADOPTED by the Planning Commission of the City of Grand Terrace,
California, at a regular meeting held on the 20st day of February, 2003.
AYES: Chair :Wilson, Vice Chair.Addington, Commsooner Whitley,
Comm ssi oner, Comstock,, Commi ssi oner Si dney
NOES: None
ABSENT: None
ABSTAIN: None
ATTEST: APPROVED AS TO FORM:
Brenda Stanfill, Doug Wilson
City Clerk Chairperson, Planning Commission
c:WlyFiles\John\swertfeger\cup9901 A3-resolution
2