Loading...
1990-12 RESOOLUTION NO. 9 0- 12 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF GRAND TERRACE, CALIFORNIA, RECOMMENDING APPROVAL OF SP-90-03, TTM-90-03 (TRACT 10395) AND E-90-08 (NEGATIVE DECLARATION) WHEREAS,the Applicant, Coast Construction/Honey Hill Development has applied for approval of SP-90-03 and TTM-90-03 (Exhibit A) to be located at 23400 Westwood Street; and WHEREAS, a Negative Declaration has been prepared for this project inaccordance with the California Environmental Quality Act (Exhibit B); and WHEREAS, a properly noticed public hearing was held by the Planning Commission on October 16, 1990, regarding this application and continued; and WHEREAS, a properly noticed public hearing was held by the Planning Commission on November 13, 1990; and WHEREAS, said Negative Declaration was reviewed by the Planning Commission at the time of said Public Hearing. NOW, THEREFORE, BE IT RESOLVED by the Planning Commission of the City of Grand Terrace, California that the following findings have been made: 1. That the site is physically suitable for the proposed type of development. The project has been designed to develop only that portion of the subject site that is suitable for development and is preserving a large percentage of the site for permanent open space. 2. That the site is physically suitable for the proposed density of development. The project has been designed to produce a maximum of 37 units and one open space on an area of land zoned for a potential of 79 units and the project has been designed to develop only that portion of the property suitable for the number of units and comparable to surrounding properties and zoning districts with regards to density and lot dimensions. 3. That the design of the subdivision and the proposed improvements are not likely to cause substantial environmental damage or substantially and avoidably injure fish or wildlife or their habitat. The project is herein conditioned to mitigate any and all environmental impacts as identified in the project's environmental review. 4. That the design of the subdivision or type of proposed improvements are not likely to cause serious health problems or cause threat to life and property from a wildland conflagration. 5. That the proposed subdivision and specific plan,together with their provisions for its design and improvements are consistent with the General Plan. 6. That the proposed subdivision is within the goals of the City's Housing Element with regards to housing availability. NOW, THEREFORE,BE IT FURTHER RESOLVED that the Negative Declaration for SP-90-03 (Exhibit B, E-90-08) is hereby recommended for approval; and - BE IT FURTHER RESOLVED that SP-90-03, including TTM-90-03 is hereby recommended for approval to the City Council of the City of Grand Terrace, California subject to the following conditions: 1. The applicant shall meet all of the requirements recommended by the City Engineer in his memorandums dated October 10, 1989, August 1, 1990 and October 12, 1990 attached as Exhibit C. 2. The applicant shall meet all of the requirements recommended by the Forestry and Fire Warden Department in their memorandums dated June 18, 1990 and October 5, 1990 attached as Exhibit D. 3. The applicant shall meet all of the requirements recommended by the Riverside Highland Water District in their memorandum dated June 20, 1990 attached as Exhibit E. 4. The applicant shall meet all of the requirements recommended by the San Bernardino County Environmental Health Services Department in their memorandum received June 13, 1990 attached as Exhibit F. 5. The applicant shall meet all of the recommendations included in the Specific Plan's soils report dated August 1990 included in the Specific Plan's Technical Appendix Vol. I attached as Exhibit A. 6. Any portion of the individual homesites outside of the identified ." buildable pad areas shall remain in its natural state (subject to required fire control regulations) and shall be restricted to open space and natural vegetation, all grading, development, use and/or construction of any type shall be prohibited. Those lots without identifiable buildable pads shall have the location of the respective buildable pads identified by the Site and Architectural Review Board at the time of the required review. 7. Each individual lot shall be subject to independent site and architectural review per the Grand Terrace Municipal Code prior to the issuance of building permits. Such review shall endeavor to prevent the unreasonable blockage of existing and potential views from adjacent and other lots in the area. 8. The proposed project shall be constructed in accordance with the Specific Plan as approved by the Planning Commission on November 13, 1990, Exhibit A. 9. Separate open space areas, Lot 39, shall be offered for dedication to the City as permanent open space and the development of Lot 39 shall be restricted to minimal impact uses such as hiking and equestrian trails and related facilities. Lot 38 shall be a private open space area held in ownership by the Homeowner's Association, the size and location of Lot 38 and Lot 39 shall be approved by the Planning Director. 10. A Home Owner's Association shall be established and shall at a minimum be responsible for the ownership and maintenance of all common areas and private improvements, including streets, water (except for those owned and maintained by the Riverside Highland Water Company) and sewer service lines, entry treatment improvements and landscaping in accordance with the standards of the City of Grand Terrace. 11. Covenants, Conditions and Restrictions shall be established, reviewed and approved by the Planning Director and City Attorney prior to recordation of the Tract Map. The Covenants, Conditions and Restrictions shall include a copy of the approved specific plan and all conditions of approval and shall be recorded at the County Recorder's Office and shall include verbage to insure enforcement powers of the CC&Rs by the City of Grand Terrace. 12. Driveway accessibility and emergency vehicle access at the terminus of Westwood Street shall not allow public or private access from Westwood Street through to Reche Canyon and such improvements shall be approved by the Planning Department. 13. An additional exhibit shall be added to the Specific Plan that clearly identifies the buildable pads of each lot. Said Exhibit shall include the following wording: "The final location of each buildable pad shall be identified on the approved final Grading Plan." PASSED AND ADOPTED by the Planning Commission of the City of Grand Terrace, California at a regular meeting held on the 13th day of November, 1990, by the following vote: Ayes: 4: CHAIRMAN HAWKINSON, COMMISSIONERS HILKEY, SIMS, VAN GEEDER Noes: 1: COMMISSIONER MUNSON Absent: 1: COMMISSIONER HARGRAVE Abstain: 1: VICE-CHAIRMAN BUCHANAN Aaw'kinson, Chairman nning Commission ATTEST anita Brown, City Clerk, APPROVED AS TO FORM n Harper, City Attorney �' ct rr ) y :- s -. . .• Planning c,r> nticE Department 'NOTICE OF FIhING NEGATIVE DECLARATION Pursuant to the California Environmental Quality Act, a Negative Declaration is hereby filed on the below referenced project, on the basis that said project will not have a significant effect on the environment due to mitigation measures included in the project and described in the Initial Study project. DESCRIPTION OF THE PROJECT: An application of TT-i=9'0=03w(Tentative Tract Map 10395) , a Specific Plan SP-90-03, and Environmental Review E-90-08. Tentative Tract Map subdividing 5 parcels totalling 79.5 ± acres into 27 lots in the RH District, and a Specific Plan for a private, gated, custom lot -subdivision consisting of 37 building sites, private streets and one. common area open space lot in the RH District. � APPLICANT: Coast Construction Company, Inc./Honey Hills Development LOCATION: 23400 Westwood Street. (APN# 282-022-014/018 & 276-049-001/002/003) Copies of the Negative -Declaration and Initial Study for this project are available for -review at the City of Grand Terrace planning Department, 22795 Barton Road, Grand Terrace, CA, (714- 824-6621). Anyone wishing to comment on this project may do so prior to October 5, 1990. All comments should be directed to David Sawyer, Community Development Director, City of Grand Terrace. Aa David Sawyer;. Date Community Development Director City of Grand Terrace X -118.I T- :- . - r :...a; oe' California_92324-5295 � 1.) = � � `�2795 Baiton.R�ad .._ �Grari . e . ;,, ,.:... r ,,k . ,,,., .. R • -- Planning ° = . A�TER Department NEGATIVE DECLARATION, Pursuant to the California Environmental Quality Act, .a Negative Declaration is hereby filed on the below referenced project, on the basis that said project will not have a significant effect on the environment due to mitigation measures included in the project and described in the Initial Study project. DESCRIPTION OF THE PROJECT: An application of TTM-90-03 (Tentative Tract Map 10395) , a Specific Plan SP-90-03, and Environmental Review E-90-08. Tentative Tract Map subdividing 5 parcels totalling 79.5 ± acres into 27 lots in the RH District, and a Specific Plan for a private, gated, custom lot subdivision consisting of 37 building sites, private streets and one common area open space lot in the RH District. ,-� APPLICANT: Coast Construction Company, Inc./Honey Hills Development LOCATION: 23400 Westwood Street (APN# 282-022-014/018 and 276-049-001/002/003) See attachment map '-for specific boundaries. FINDING OF NO SIGNIFICANT EFFECT: Based upon the attached Initial Study, there is no substantial evidence that the project will have .a significant effect on the environment. avid vydr, Q Date Community Development Director City of Grand Terrace - - ;� :� 4 ;: : ` ; = 24�5295r ("11.j<8246621 =a=- :�-;Grand%Teiface= California 923 �: _. ii._ - .22795 Sartori' gad ..: �:_ -- :_ :<>, :z�4:...... . .�.:, 7T�cr Ive /0395 /V lMf A�s•w+'•NrA•Abe~.aw-WA-~Icq,wrnn..r /,1 iwnw►af A"Wft W) AM^rr rnrr Aw..A-.•w.vr,►nw•.r r A-rNMr•I MAAOI�I ���/S�T.�WJ�' „�f,,,,,,,,,,,t a iI'N.1r•LJ.[uY.rcA�.act/s'c'!ot ••� rI Af An►rnrrN.A Aryr.rAr �'.i'i'.• Ar.rw: crecsr rr,.:w'co. . IwlMyrii � nw..(iwOlM.rNIA.Jr A , .`�1:t�•' /I P—wAIAP/!;F�J rf ..a•-�'�' ,• ,`''"1'' ;.,.�-u�`•.:ire ,�r\\?, �. �,,��"'�:'.-.• ','..y�',.;!'1, '• . . ',l:;��.• r'f' . r 1 ^�. ..i' 1, r / MS' �Y Dom'1'•�:F •;t:: �/% �••;� •� f ' �• -,., � �✓� � Hwy •• \� ifa . •' n\• /nir..���'•"/• /• •,� /f� �•.• •):ram �t /� ./.A'� 1►�� � ., '�'•'•%,.;,' ��^\ �/••i. .IG",' � �`•ti � � /1/'S r � 1,t.,.. r� -JJJ}t___�' f, 'y., I! � e�. }, A �t• ,, �,�r 1 `:ter f:. r .`�f\���7�=�,:�• �''�. ;;;. . . ' . .a. : L'. r4'•y.• •i) .��• 1� I\ 10 ' '•`�f%/ 1 t•�,II / r .. 1111} - i`�r„1.. .�\•\\. ��• .�l�,,y':,11'1 ,;� ••'L• ._ !�; ��•.•. . • •t.. � �• � .�• � •` 'y ,r�^ Z ?, .1� '�J� sir C;�.. t,� ••�� .'r.�,} :. i:`. P? N r�..4 nvar�~ !-1 rr7lPget•OAVII ZZ�1V.•' �' 1'�`' li�t1 3 S�•\�'• '7 f >> •,'�:5 `'. n.a ra...,r....0 AOWAMW Awfr.rf f}•MY�-♦ra••M••I N M AwlAwr+,Iw♦rf+r, AOA5LM p,fA of""AAf •♦: AA1i+IMAL4 •AN •��' -„•.wr..r'/'•.-r+ i. ,�%.;... �oM IAw�L/r•�A-jIww.M Aw.a.lw.r Aw ir..w A,.•MA/A1M• •'A'AP Ar�M ',�.. IAr-r••A -_AyN•AA ry11••��AM IJ/I /�./AwwrrA AI•�AI„fY(y)wu lip ''' I A•.•++r•••r+A„,µi"1'•~ w..w.+.v.w.+r..a+,r�rr.►,nw.r�rf ,r,'•i�""A,.in�.,•�'w.•M...Jr �:,,(: . ww ••'•I r,rrnn�AArAfw,AIAAArr ',,i': .r` rrrr,ll -Aw"fwflf••.-.+f••�tIM fir. M•k -M✓A•A A- f�• 1 MI -^ A LwM ' A&-AWZ •I /IKAAA•/�Mall�• �•/..•• '�. CITY OF GRAND TERRACE PLANNING DEPARTMENT INITIAL ENVIRONMENTAL STUDY I Background 1. Name .of Proponent: City of Grand Terrace 2. Address and Phone-Number of Proponent: City of Grand Terrace 22795 Barton Road, Grand Terrace,. CA 92324-5255 Attention: David Sawyer, Planning Director 3. Date of Environmental Assessment: 4. Agency Requiring Assessment City .of Grand Terrace�o�P��y' �C. 4COAm- Co�lsneu�r7'oN 5. Name of Proposal, if applicable -M_qo-n3. SP—QO=03. F y0`-O$ 6. ..Location of Proposal: a34nn W.=-v wood II Environmental Impacts (Explanations of all oyes" and "mayi?e" answers are provided on attached sheets.) Yes Maybe No 1. Earth. Will the proposal -result in: a._ Unstable earth conditions-or in changes in geologic substructures? b. Disruptions, displacements, compac- tion or -overcovering of the soil? c. Substantial change in topography or ground surface relief features? -4. The.destruction, covering -or modi- fication of any unique geologic or physical features? e. Any substantial increase in wind or water erosion.of soils.., either on or -or off site? pzi '_;r - . .-k r n.Gw -ti. .-�±�;k`�' •-�' -t.. �.,.yay':{:.-rye. .a-...:»...`.• =.-�.': ii^= 3 -az>,3� :;.j:rsL%r :�':t'1.�'•'• ��:;: - r�' ''�2.% Sri�i�=�-� '�;�.'.r::;'�".,..�ie-c ..,..-rr��:�Tv tiy`k.. 't'r�.•^- •-�.....+=�: _.ti..... •'Y::' -- ' Yes Maybe No f. Changes in deposition or erosion of r" beach sands, or changes in siltation, deposition or erosion which may modify the channel of a river or sti-eam or the bed of the ocean or any bay, inlet or lake? g. Exposure of people or property to geologic hazards such as earth quakes, landslides, mudslides, ground failure, or similar hazards? 2. Air. Will the proposal result in: , a. Substantial air emissions or deterior- ation of ambient air quality? b. The creation of objectionable odors? c. Alteration of air movement, moisture, or temperature, or any change in climate, whether locally or regionally? 3. ..Water. Will the proposal result in: a. Substantial changes in currents, or the course or direction of water movements; - in either marine or fresh waters? b. Substantial changes in absorption rates, drainage patterns, or the rate and amount of surface runoff? c. Alterations to the course or flow -of flood waters? d. Change in the amount of surface water in any water body? e. Discharge into surface waters, or in any-alteration of surface water qual- ity, including, but not limited to, temperature, dissolved oxygen or ! turbidity? - f. Alteration of the direction or rate of flow of ground waters? y: {�.:.4`�-•:'� •ir:�._ can:: _ ..c! ..::Y.-. r.�:n„ . - _ '. _`i:.:�_ :•�:..:."r .ralc.r-�3'+-"3.:s_:4`.�;.•..%Frl'7.,,-":3;c-:... ?_a'1'-a�Ma.; .: ' Yes Maybe No g_ Change in the quantity of ground waters, either through direct addi- i' tions or withdrawals, or through inter- ception of an aquifer by cuts or excavations? h. Substantial reduction in the amount of water otherwise available for public water supplies? i. Exposure of people or property to water related hazards such as flood- ing or tidal waves?. 4. Plant Life. Will the proposal result in: a. Change in-the diversity of species, or number of any native species of plants (including trees, shrubs, grass, crops, and aquatic plants)? b. Reduction of the numbers of any unique, rare, or endangered species of plants? c. Introduction of new species' of plants into an area of native .vegetation, -or in a barrier to the normal r6plenish- ment of existing species? d. Substantial reduction -in.acreage of any agricultural crop?- 5. Animal Life. Will the' proposal result in: a. Change in the diversity of species, or numbers of any species of animals (birds, land animals-including rep- tiles, fish and shellfish, benthic organisms or insects)? b. Reduction of the numbers of any, unique, ' rare or endangered species df animals? c. Deterioration to existing fish or Wildlife habitat? i 4ei.- - :fin _- :l,Yn�.'•�'� 1.'r-`-ti'ri7:n`ti�:d'.`_ i u`:?�::'��:::':•• .) . - .�:+: �.a= '•i:__ :r'�': .sc '.rc".�-�.+a�,?*rb:�a.?:a,,.+. --�4hx c5ca.:-•:�,....is _ • - 1, -• l r•l • Yes Maybe No 6. Noise_ Will the proposal result in: - \ a. Increases in existing noise levels? b. Exposure of people to severe noise levels? 7. Light and Glare. Will the proposal produce substantial new light or glare? 8. Land Use. Will the proposal result in a substantial alteration of the present or ` planned land use of an area? x 9. Natural Resources. Will the proposal result in: a. Substantial increase in the. rate of use of any natural resources? b. Substantial depletion of any. non- v renewable natural. resource? 1` 10. Risk of Upset. Will the proposal involve: _ a. A risk of an explosion or the release of hazardous substances (including, but not limited to, oil, pesticides, chemicals or radiation) in the event of an. accident or upset conditions? b. Possible interference with an emerg- ency response plan or an emergency evacuation plan? 11. Population. Will the proposal. alter the location, distribution, density, or growth " rate of the-human population of an area? �C 12. Housing. Will the proposal affect existing housing or create a demand for additional housing? - 13. Transportation/Circulation.. Will 'the .pro- proposal result in: a. Generation of substantial additional vehicular movement? _ :.t."6•"�<'•' [•i.,'��..'`.. ..t_ '�"�v .,r-ram 4� �-5._ is+ -`._:: .' - ••fit'. '_a.P..v -..,.A ?i�'"= :K .t.-`. �M�.—..yr!?�±i�(f..'::.c+�`71.-'.^��`tif n-.G�J,.•...`^..- �.�s.. f Yes Maybe No b_ Effects on existing parking facili- ties, or demand for new parking? c. Substantial impact upon existing v transportation systems? d. Alterations to present patterns. of circulation or movement of people and/or goods? e. Alterations to waterborne, rail or air traffic? f. Increase in traffic hazards to motor vehicles., bicyclists or pedestrians? 14. Public Services. Will the proposal have substantial effect upon, or result in a need for new or altered governmental services in any of-the following. areas: a. Fire 'protection? b. Police protection? cw Schools? . d. Parks or other recreational•faci- lities? _ e. Maintenance of public facilities, `/ w including roads? Jt f. Other governmental services? , 15. Energy. Will the proposal result in: a. -Use of substantial amounts of fuel or energy? b. Substantial Increase In demand upon existing sources of energy, or re- quire the development of new sources X of energy? 16. Utilities.. Will the proposal-r:esult In a need for new systems, or substantial alterations to the following utilities: X. . Z. Power or.natural gas? r-` • - _ _ _ _ - _ ••c-�.=e:.�';•j�tI�-.::�•�:•.ti=ci::T:.:�L::• :ice:. �+•j':`_''\: _ - :!_•' � - -)a a.-n .^:`,�,ti.....r>�= ^^-:� C?^t.:r h• ittiritc. .x• .fw � tip. .S- t�•. 1:4. rk.:i.:.:.•-:. •:r!�••'"v '�:.-rer v.- �.�.� s 't r .+�T.xe•:�:` '.;�`S.=�i�'L••.-.^• .:y7:,.`•.y- .':?:` _.`•iA .ii`i•:::,µb11�.. `.`t�.!•..�..M�...s .[�.'itC �`� --+t�+S �'-5.T. iV^rJ:: - ', .:. f`%y'' -�r:Y.•' :. u.x ..�r�c. r�t'y"`' ..-.?cd-...td.w`,i_...-. -+.-..``^1•.-•�'.'.a-. �_:_.."i� «:3 r../.�,`s� w.:. .•*•.�v .:-.K:. . —' t�:T�t'^:,....J'.:+..ron.'•a.-'tom --.;.:--.. _.Y_'ie-_��_-. �..-_ ':-a•r+.:—. ..�r_s..•:.,a��:�v'cw - Yes Maybe No b_ Communications systems? c. Water? d. Sewer or septic tanks? e. Storm water drainage? f. Solid waste and disposal? 17. Human Health. Will the proposal result in: a. Creation of any health hazard or potential health hazard (excluding mental health)? b. Exposure of. people to potential health hazards? x 18. Aesthetics. Will the proposal result in the obstruction of any scenic vista or view open to the public, or will the proposal result in the creation of an aesthetically offensive site open to public view? 19. Recreation. Will the.proposal result in an impact upon the quality or quantity ` of existing recreational opportunities? x 20. Cultural Resources. a. Will the proposal result in the . alteration--.of or the destruction of a prehistoric or, historic archaeo- logical site? , b. Will the proposal- result in adverse physical or aesthetic effects to a prehistoric or -historic building.,.. structure, or object? X c. Does the proposal have the potential to cause a physical_ change which - would affect unique ethnic cultural values? i ?{ }a.`l': — r—�ki.�;4'r. �•ii- � J: 1.. ti?r�`,s_µC� a..s ..: �- r.++'%^`ej^ _ _$=��•=.S'.;:-?. I�^�.. ".•:}�':?.•�<a5y��tx_�. .� y•4.�E`�. 'YK^'G+.w...- �o7.--a- . ^ .i.^1.!. '{_-. ..'!�..: .ti• .N+;:C'r.:- - •e-i -.:.5.���r ...s�.-'t"3r�.;� �.t t.�!'.`y_r�l i.��.:v.�..a V�.. .ry i Yes Maybe No d- Will the proposal restrict existing -, religious or sacred uses within the .v potential impact area? /� 21 . Mandatory Findings of Significance. a. Does the project have the potential to degrade the quality of the environ- ment, substantially reduce the habitat of a fish or wildlife species, cause a fish or wildlife population to drop below self sustaining levels, threaten to eliminate a plant or animal or eliminate important examples of the major periods of California history x or prehistory? b. Does the project have the potential to achieve short-term, to the dis- advantage of long-term, envirod- mental goats? (A short-term impact on the environment is one which oc- curs in a relatively brief, definitive period of time while long-term impacts will endure well into the future.) c. Does the project have impacts which are individually limited., but cumu- latively considerable? (A project's . _impact on two_or more separate resources may be relatively small, but where the effect of the total of _ those impacts on the environment is significant.) n d. Does the project have environmental effects which will cause substan- tial adverse effects on human beings, either directly or indirectly? ' I J. t? . +F- _ .. 'r_.. t= ENVIRONMENTAL DETERMINATION On the basis of this initial evaluation: find that the proposed project COULD NOT have a significant effect on the environment, and a NEGATIVE DECLARATION will be prepared. l find that although the proposed project could have a signi- ficant effect on the environment, there will not be a signi- ficant effect in this case because the mitigation measures described on attached sheets have been added to the project. A NEGATIVE DECLARATION WILL BE PREPARED.. I find the proposed project MAY have a significant effect on the environment, and an ENVIRONMENTAL IMPACT- REPORT is required. . David Sawyer Planning for Date tgnature Y For City of Grand Terrace a _ -:3` .'.'G:: -t. :F',•.:C'.v% _ ''.- -.:C,_ =r7f'�r�;.-,. .±'$x:.vq. .F. III. DISCUSSION OF THE ENVIRONMENTAL EVALUATION. i lb. Development of the site will involve excavation and compaction of approximately 150,000 cubic yards of earth and rock. All excavated material will be placed and compacted within the confines of the project boundary under the observation of licensed geotechnical consultants, and in conformance with all grading regulations of the City of Grand Terrace. lc. The total project area consists of approximately 79.5 acres. However, development involves grading of 20.7 acres, with the remaining acreage left in its natural land form. Project grading will create 32 building pads with 5 lots being left in their natural state,requiring custom design grading and foundations as individual lots are developed. Grading for the most part develops conventional terraced pads. Cuts will reach a maximum vertical depth of approximately 35 feet, but due to topography of the natural ground, will create two major cut slopes reaching 50 feet in height, measured from top of slope to toe of slope. Fills will reach a vertical depth of 50 feet in the two major canyon areas in -- the northerly portion of the property.* Fill slopes, approximating 75 feet in height, measured from top of slope to toe of slope, will terminate the . north south canyons traversing the property. Fills slopes for the most part are all located in the lower areas being graded. le. Project development should not result in any substantial increase in wind erosion. Newly graded slopes will be susceptible to water erosion All slopes in excess of five(5)feet in height will be planted and irrigated with landscape materials prescnbed.by the project landscape architect that are compatible with native plant material in the area. Once established this plant material will provide adequate erosion protection for all graded slopes. Building pads will be graded sloping towards the street and protective berms will be constructed to prolnhit storm flow from the pads over graded slopes. During the rainy season,sandbags.and/or other protective measures will be. placed to prohibit erosion of lot swales and streets that may not.yet be paved. The grading contractor will be required to monitor erosion control devices as . prescribed by the-evil engineer for the areas where grading is not yet 'completed during the-rainy season, generally defined as October 1,through April 15,of the following year. . tf 5^ •:ti T .. - ,.P....T Ala... ..3.�'tr - _ - - {.-.,...:. _ .. - t^ Design of the permanent drainage facilities will include installation of energy dissipators and velocity reducers at the outlet of all storm drains, returning flow to as near a natural state as possible prior to leaving the property. Development of the project will result in an increase in a total peak runoff leaving the project-of approximately OS%with the maximum increase in the small 5 acre watershed of less than 10%. Flow increases of this magnitude should not cause substantial increase in erosion of natural watercourses downstream from the project Ig. According to the report prepared by Gary Rasmussen and Associates, Inc., project geologist, no active faults are suspected to exist on the site. Future dwellings will be exposed to earthquake activity from known active faults in the general vicinity. The San Jacinto Fault is approximately one mile northeast of the northeast comer of the site. Other fault systems in the vicinity of Grand Terrace that could expose future dwellings to earthquake activity are the San Andreas Fault,nine miles to the northeast; the Elsinore Fault,20 miles to the southwest; and the Cucamonga Fault, 13 miles to the north_ The San Jacinto and San Andreas Faults are considered to be the most significant active faults to the site. Other active faults located in the general vicinity are considered less significant to the site due to their greater distance and/or lower probability of having a significant earthquake occur along them, which might affect the property... Recurrence intervals for maximum probable earthquakes cannot, yet, be precisely determined. However,based on information available at this time, maximum probable.earthquakes should be expected(at least 5096' chance of occurrence within the next 100 years) up to Richter magnitude of 7.0 along the San Jacinto Fault, and magnitude 75 along the San Andreas Fault. Geological conditions other than seismic,are not considered to be hazardous to this development: Current City of Grand Terrace building codes provide the arr.,„r.;ate design requirements to address potential seismic activity in the area. All grading -within the project area will be conducted in consideration of the potential forces from seismic actMty. 3b. The total drainage area of which Tract 10395 is a part, consists of tr.xI,,..;mately 995 acres. 43 acres of the tributary area situated in the southeast corner of the property will be left in its natural state. Drainage flows from this small area leaves the property along the easterly boundary and is not involved in the development._ The remaining 952 acres of drainage-area flows into a series of northerly drainingravines,nitimatelymerging into two(2)major points of concentration :.t.- r_ - it.F along the north boundary of the property, and one small tributary area situated between these two major points of concentration- These tributary areas in the undeveloped state consist of 37.6 acres, 53 acres, and 513 acres at their respective points of concentration along the north boundary of the property. After development the respective areas are 38.0 acres, 3.7 acres, and 53.5 acres,which maintains, for the most part, the drainage pattern of the undeveloped condition. JHI3 Consultants, tract engineers, have classified the undeveloped property as 'barren (rockland, eroded and graded land)", with soils groups B&C as defined in the San Bernardino County Flood Control District hydrology manual. Development of the property will physically involve approximately 20.7 acres of streets, pads,and slopes. The remaining 58.8 acres will be left natural in one large parcel to be dedicated to the Homeowners Association as open space, or as undeveloped portions of the subdivided lots that will be deed- restricted from further development Because of the relative impervious nature of the natural ground compared to graded lots, there will actually be an increase in absorption rates for the developed area. However, due to a change in the time of concentration of storm flows, there will be a slight increase in peak flows in the two larger tnibutary areas. The most westerly drainage area will increase 10 year peak flow from 48.7 CFS to 53A CFS, an - � increase of approximately 9.6% The most easterly drainage area 10 year peak flow will increase from.,72.0 CFS to 73.2 CFS, an increase of approximately L796'. The small central drainage area will be reduced in size so that there will be a reduction in peak flow from 1L8 CFS to 6.6 CFS, a reduction of approximately 449o. Because of the relatively small area of property to be graded and the fact that a significant portion of the graded area will be landscaped with natural plant material, the impact of grading and development-on the natural drainage patterns of the area will be less significant than usually found in subdivided properties. 3c. The development Iran been laid out in such a manner as to maintain the natural tributary areas to the extent possible. Nnor modifications due to development street patterns w81 occur. Appoo®mately 4.3 acres of tributary area in the southeast portion of the property will,as stated in3(b)above,be left untouched and no changes of the tributary area or flow patterns will be altered as a result of development Three tributary areas are involved in the area to be.,graded As discussed previously in Section 3(b), development WM alter these areas as follows: . j vt'e '� t Westerly tributary area will be changed from 37-6 to 38-0 acres. Peak 10-year flows will increase from 48-7 CFS to 53.4 CFS. Central tributary area will change•from 53 acres to 3.7 acres. Peak 10-year flows will decrease from 11.8 CFS to 6.6 CFS. Easterly tributary area will change from 513 acres to 53.5 acres. Peak 10-year flows will increase from 72.0 CFS to 73.2 CFS. It should be noted that peak flows for each tributary area will not necessarily occur at the same time during any given storm. Generally speaking peaks for c,,,allPr tributary areas will occur fast. Design of drainage will return all flows to a -natural state to the extent possible, before fit.�;,�aaP leaves the project boundaries. 3£ As reported by Gary S.P-ern- ccen and Associates,a general shallow ground water is not expected to exist under the site. SignM,nnt groundwater should exist under the site within the old alluvium in the easterly portion of the property. Additionally,sigrmt n*quantities of groundwater will typically be flowing along the contact between granitic rock and the old alluvium, at whatever depth this contact occurs. Sir;4;,--n*bodies of water should also be expected within the granitic rock yvhere decomposition of the rock decreases to a point where the waxer will no longer flow through it. Groundwater conditions should be at a.,,av;n,,,n, during the wet portions of the year, and would typically daylight or be-exposed-as springs-,within the more deeply incised drainages. In general,excavation and the resulting cut slopes to be constructed as a part of the grading operation will occur along the ridges. Compacted fills and fill slopes will be constructed for the most part in the lower ravines. Prior to pta^PmPn* of fills; ravine and canyon bottoms where alluvium is present will be processed to the extent that alluvium will be removed to the contact with underlying bedro& Where groundwater exists or has the potential to exist along the contact between alluvium and bedrock subdrains will be constructed to r,a-, -An flow. Soils engineers and geologists will monitor the arts during grading to de* if exposed conditions may result in groundwater seepage or potential springs, and where appropriate rel-mmoAroi mitigating measures. . Because of'the potential for increased percolation of surface water from = irrigation of i,,**o4v,,nT%ed areas resulting-from development;a slight; in groundwater -flows along near �^r �P.geologic features, as previously " z- •"3L 4: - •:YV - - i r - x =e — ,:�:':+..•- Vie, --,•;,.•`+.•:•- described, is possible_ 3g_ The site is underlain by granitic bedrock and, therefore, a static groundwater table is not expected to exist. Intermittent flow of seasonal springs and near surface flows do have the potential to be increased due to landscape irrigation, or on the other hand, decreased in the event shallow aquifers are intercepted by cut areas. The natural riparian areas, as indicated by the biologic assessment for the project area, are,for the most part,left undisturbed by development and will be incorporated into dedicated open space or otherwise precluded from development by deed restriction. 4a. Development of 37 residential lots will,due to the personal taste of individual residents, introduce species of plants that are not native to the area. Graded slopes, however, will be planted with a native palette to the extent possible, as specified on schematic landscape drawings prepared by Clark & Green, project landscape architects. 4c. Development landscaping will not be a barrier to normal replenishment, but as previously discussed in Section 4a,personal preference will introduce new species of plants in the landscaped areas of individual residential lots. Open spaces of native material will remain throughout the development and approximately 83%of the project area will be left natural or consist of graded slopes-planted with native materials. As individual lots are built upon,fuel modification zones will be required for fire protection. Plant material in these zones will be restricted to be as . compatible to the native materials as possible and still provide the required protection. 5c. The subject property consists of approximately 79.5 acres, the majority of which currently exists as undisturbed,natural terrain. There is one residence on the property that will be demolished,and at some time in bistory a roadway was graded, crossing the property in a east/west manner connecting the two ends-of Westwood Street,terminating at the west and east boundaries in the cities of Grand Terrace and Colton. Ibis access road has since deteriorated to the point it is no longer passable except by off- road vehicles. Several trailers also traverse the property and appear to be used intermittently by bikers and off-mad vehicles. -Observation of topographic maps indicates that 4ppL :mately 4-5-acres of-the site-is involved in these uses. •mot+. -L..::. -,,: .'.3:--:t.. �;y y ':.'Y� -ter:^�+.., -'•ni :'sa�• Y� Development of the project will utilize approximately 21 acres in streets, pads and slopes, with 58+ acres left natural. Portions of the natural area will be disturbed during the grading operation, but should re-establish itself over a period of time. The grading operation and introduction of houses into this area will remove, permanently, some area now available to natural wildlife. 6a. Existing noise levels will be increased substantially during the grading operation, and will diminish to ambient neighborhood levels associated with 37 residential lots after all lots have been sold and new homes constructed and occupied. It is expected that the occasional nuisance and noise from off- road vehicle use of the property will be permanently eliminated by development. 7. It is possible that construction material utilized in development will give off reflected light. Introduction of home lighting and street lights in the area will also be a source of light and glare during night time hours. Street lights will be of an approved design to minimize glare to the extent possible. 8. Development will generate an additional 36 single famrly homes(total 37) on a 79-5 acre site currently used as a single family residence. This existing residence will be demolished during the development of the project and replaced by a new, custom home. This is a substantial intensification of the residential use of the property,albeit a use contemplated by the General Plan and zoning of the property. 13a. According to the traffic report prepared- by Wes Pringle and Associates, development of the property will result in a maximum of 320 daily trips to be added to the existing Westwood Street traffic in the City of Grand Terrace. Current traffic on Westwood Street is estimated to be less than 500 vehicles per day. A daily volume of 1,000 or less is typical for residential streets.. The traffic report does state that volumes of up to 2,000 vehicles per day are considered light traffic and that the resulting traffic volumes after project development will be within acceptable levels for residential streets. The present plan calls for emergency access between the cities of Grand Terrace and Colton; however, this will.be a gated access available only to emergency vehicles. 13£ To the extent that any increase in traffic volume whatsoever increases the potential for accidents involving vehicles, bicyclists an4 pedestrians, an increase of 320 trips per day.will result in increased accident potential, accordingly. Streets to be developed within the project, as well as existing streets to be accessed by the project, do -have .adequate capacity to .handle the post ti A. ter: !.' development traffic flows, and the potential for accidents should be well within the tolerance for developments of this nature. 14e. Tract 10395 is to be a private, gated community and all facilities within the project boundary with the exception of water and dry public utilities, will be maintained by the Homeowners Association and maintenance thereof will not be a burden on public resources. The private sewer system within the development will connect to public facilities at the tract boundary; however, the introduction of 37 residential units is not considered a substantial impact on existing facilities. Westwood Street and Honey Hills Drive will provide public access from the tract boundary to Barton Road,the nearest major roadway. Increased traffic on these roads to local roadways due to project development should not alter the routine maintenance program now in effect. Construction and maintenance of other public utilities such as"electrical, telephone, gas and cable TV will fall under the normal service programs provided by these public utilities. 16e. Development will result in a need for significant storm drain systems within the project area. This entire storm drain system will be private and maintained by the Homeowners Association. Increase in peak flows downstream from the project as -a result of the development, are -considered minor (refer to Section le above) and no alteration to existing systems should be required as a result of development. 19. Project will result in potential increase of passive recreational facilities available to"the public. W.O. 12-1.1058 RAND MEMORANDUM 22795 Barton Road T Grand errace :alifornia and 5295 TO= David Sawyer, Community Devel- opment Director Civic Center FROM: Joseph Ki cak, City Engineer (714) 824-6621 DATE: October 12, 1990 SUBJECT: Tentative Tract 10395 Byron R. Matteson Following recommendations should be considered -as conditions of approval Mayor for subject project: 1. Attached memorandum dated October 10, 1989 identified certain Hugh J. Grant Mayor Pro Tempor concerns during the preliminary review of the proposed sub- division. Some of the concerns have been addressed in the Barbara Pfennighausen Specific PI an 90-03. However, those that were not shal 1 be Si resolved prior to final approval of Tract 10395. Therefore the Jimsingley Gene rom attached memorandum -should be considered part of. this report Council Members and conditions of approval . Thomas J. Schwab 2. Streets City Manager (a) Since all of the streets are proposed to be private, a standard cul-de-sac or other form of turn around facil- ities shall be provided at the east end of Westwood Street. That turn around facility shall be dedicated to the City. Curb, gutter and standard roadway shall- be con- structed within that area. The structural section shall be designed to a TI=6. (b) Westwood Street and Street "A" proposes a rolled curb. It is recommended that- a standard 8" curb and 24" gutter be constructed on both sides of Westwood Street and "A" Street within the subdivision. (c) Construct standard roadway between new curbs. Structural section for roadway shall be designed to TI=6. (d) "A" Street - Cul-de-sac north and south of Westwood ex- ceeds the maximum allowable length. -� 3. No sidewalks are being proposed within the subdivision. EXHIBIT== Memorandum to -David Sawyer October 12, 1990 Page 2 4. Street lighting shall be provided in accordance with City stand- ards for the illumination. All of the energy costs for street lighting shall be the responsibility of Property Owners/POA. Developer shall make the necessary arrangements with SCE for energy to the street Tights. 5. Sanitary sewer system shall be constructed to City standards to provide 'service to each parcel. The pump station shall be constructed with dual pumps and provisions must be made for stand-by power. The system shall be private with no responsibility to the City for maintenance or operation. 6. Storm Drain System, - (a) All of the run-off shall be discharged in such a manner as to maintain the energy at or below that existing in the current natural setting. (b) Engineer shall provide proof that the storm run-off directed toward the northwest and north,--into the existing sewer ease- ment shall in no way impact the existing sanitary sewer system. Therefore, location of existing channel; its capacity and the relationship of sewer manholes horizontally and vertically shall be provided. 7. Water system shall be designed to Riverside Highland Water Company standards and "Will Serve Letter" shall be provide to the City. 8. Grading (a) As stated in my memorandum of October 10, 1989, based on the proposed pad elevations, large cuts and fills will be re- quired. No preliminary grading plan was submitted, therefore it is not possible to estimate the extent of grading that will be required. (b) Grading plan shall be provided for the subdivision prior to final approval. Grading plan shall indicate the proposed grading (a possible alternative) for each and every lot within the subdivision. (Chapter 70 - U.B.C.) (c) If blasting is required, permits shall be obtained from the required agencies. Memorandum to David Sawyer October 12, 1990 Page 3 9. Permits, Fees and Assessments (a) Developer shall show proof that sewer assessments if any, have been paid, or request re-apportionment of the balance through San Bernardino County Special Districts. (b) All fees shall be paid in accordance with the ordinances and resolutions of the City. A deposit of $5,000.00 shall be made with the first submittal of plans for plan check. (c) Permits shall be required prior to beginning of any- con- struction. 10. All improvements shall be designed by owner's Civil Engineer to the specifications of the City Engineer. JK/ct l MEMORANDUM l . C_ DATE: August 1, 1990 W.O. 12-01.1058 RRMD TO: David Sawyer, Community Development Director FROM: Joseph Kicak, City Engineer 22795 Barton Road RE: Tentative Tract Map 10395 Grand Terrace California 92324-5295 -----------------------7---------------------- Civic Center (714) 824-6621 The recommendations for the approval of subject tract are based on the assumption that all of the facilities within the boundary of tract shall be privately owned and operated by entity other than the City. These facilities shall include the following: 1. Street Byron R. Matteson 2. Storm- Drain Mayor 3. Sanitary Sewer 4. Street Lighting and Landscaping in public Hugh J. Grant Rights-of-Ways. Mayor Pro Tempom 5. All other facilities benefiting the residents of this development not maintained by public utility Barbara Pfennighausen or public agency. Jim Singley Gene Cadstrom Following recommendations should be considered as Camcd Membm conditions of approval of Tentative Tract Map•.10395. Thomas J Schwab 1. Prepare final tract map to comply with the City Manager requirements of subdivision map act. 2. Provide grading plan for the subject site (all parcels) . 3. Provide preliminary soils and geologic report. 4. If the development is to be private, provide details of entrance and turn around facilities prior to entering this development. 5. Streets - (Geometry) (a) Street "A" north and south of Westwood Street, the length of cul-de-sac exceeds 660' (b) Westwood Street, easterly of Street "A", length exceeds 600' . (c) Recommend standard curb in lieu of rolled curb be used. Rolled curb encourages parking of vehicles in what should be a landscaped parkway, especially with 32 foot street width. TO: David Sawyer August 1, 1990 Page 2 (d) Geometry of cul-de-sacs shall be in accordance with the City standards as these standards pertain to minimum radius. (e) Street grades shall not exceed 12%. (f) Driveway approaches shall not exceed 13% with a minimum of 10 feet adjacent to garages shall not exceed 5% (recognizing that homes-- are not plotted at this time), in a grading plan for pad elevations, this should be taken into consideration. (g) No sidewalks are proposed within this development. (h) Westwood Streets (Colton-and Grand Terrace) connections; (1) Who owns the property labeled as "Not a Part". (2) Design and construction of Westwood Street cul-de-sac in Colton as well as emergency access between the two Westwood cul-de-sacs shall be -approved by the. City of- Colton. 6. Street Structural Sections (a) All streets shall be designed to a structural section for TI=5 minimum. (b) Structural sections shall be designed based on the soils Engineer's Recommendations and R-Value of material at the street grade after rough grading completed. 7. 'Street Lighting (a) Street lighting- shall be provided to meet the minimum illumination standards of Standard Subdivision. (5800 Lumen street Lighting spaced at 180 feet + 20 apart) (b) The type of-standard, if different from City standard marbelite--shall be approved by Planning for architectural appearances and engineering for illumination standards. 8. All utilities shall be underground TO: David Sawyer August 1, 1990 Page 3 9. Sanitary Sewer Standards (a) Sanitary sewers to serve the subject subdivision shall not•be maintained and operated by the City, however, City shall have the right to approve the legal entity to assume that responsibility. (b) Sanitary sewer shall be constructed to the standards specified by the City for public sewers. (c) Pumping station and all related appurtenances shall be the responsibility of the entity specified in 9(a) as it relates to maintenance responsibility. 10. Storm Drain System (a) Provide detail hydrology and hydraulics study for the storm drain run-off conveyance and disposal facilities. - (b) Discharge,into existing channels shall be permitted, provided that total flow and total energy as a result of the run-off shall be increased and the existing facilities within those channels are fully protected. (a) Storm drain easements and storm drains as shown on the tentative tract map shall not be accepted by the City for maintenance. 11. Show proof of pay-off or reapportionment of the outstanding bond amounts for assessments in CSA 70 I.Z.H. , A.D. No. 1 Grand Terrace Sewer. 12. All improvements shall be designed by owner's civil engineer to the specifications of the City. JK:dlk W.O. 12-1.1058 ear M E M O R A N D U M 22795 Barton Road TO: David Sawyer, Community Development Director Grand Terrace California 92324-5295 FROM: Joseph Kicak, City Engineer Civic Center DATE: October 10, 1989 (714) 824-6621 SUBJECT: Honey Hills (A Private Community) Preliminary Review Please consider the following comments very preliminary, based on a very preliminary plan submitted for comments. Therefore, the comments should Byron R. Matteson be considered more in a form of questions to the project proponents, Mayor rather than specific recommendations for approval of the project. These- questions or comments should be addressed prior to formal submittal of Hugh J Grant the tentative tract. Mayor Pro Tempone The areas of concern are the following: Barbara Pfennighausen Tim Singley 1. Drainage Gene Carlstrom Council Members (a) The points of discharge from the proposed subdivision appear to go into private properties to the north. What Thomas Schwab are the rights- to discharge to those properties, i.e. City Manager existing easements, proposed easements, letter of drainage acceptance. (b) Point of discharge at. the northwest corner will follow the same alignment as existing sanitary sewer. What impact will that discharge have on the existing sanitary sewer, i.e. manhole flooding,- silt in sanitary sewer. There are no existing storm drain easements of record. (c) All of drainage tributary to the southerly boundary of the subdivision, .as well as drainage generated by the proposed improved portion- of the property is indicated as being carried on the surface. Some of these surfaces are fill slopes. No indication on how that will be handled, within the subdivided area. The drainage is carried on surface streets, with no indication as-to the quantity of runoff generated and the capacity of various streets to carry the flow. Therefore, hydrology and hydraulic studies, as well as { resolution of discharge points should be addressed. . .i 1 C 1 '1. V Memorandum to David Sawyer October 10, 1989 Page 2 2. Ownership The proposed land division includes 4 Assessor's Parcels. Are these all in a single ownership? 3. Traffic (a) "A" Street exceeds the maximum Cul-de-Sac length permitted. Statement regarding Fire Marshall is recognized, however, other concerns are the requirements of the ordinance which prohibits the length as proposed. What are the alternatives? (b) A single access to the proposed development is a 26 foot wide improvement in Westwood .Street from the west, with emergency only access from the east. Is that roadway (26' wide) adequate to provide traffic that will be generated by the 83 units plus the existing development on Westwood Street and Westwood Lane. (c) There appears to be an existing access through Lot 33 to %- the parcel northerly of this development. Are there any prescriptive -rights -through that parcel? Suggest a traffic study be considered to dispute or support the traffic circulation as proposed. This would include the proposed interior streets and routes along the existing improved- streets to a major highway. 4. Grading The grading as proposed will require fairly large cuts and fills. The maximum estimated cut of 47 feet. This cut may require blasting. If such cut is in fact part of the final grading plans, and blasting is required, permits from other agencies shall be required. These permits -shall be submitted to the City prior to issuance of grading permit. If blasting is required, and the material excavated by blasting is used in fill area, such materials placed in the fill area shall be subject-to provisions of Chapter 70 of UBC. Maximum fill, -based on the preliminary plan is estimated at 72 feet. Should these fills- be permitted, they shall be subject to Chapter 70 of UBC. r?:u Memorandum to David Sawyer October 10, 1989 Page 3 There appears to be grading*proposed on an area shown as "Not a Part" easterly of Lot 58. Needs some clarification as to how that grading will be handled, i.e. grading letter, easement etc. No total impact of this proposal can be evaluated at this time. 5. Seismic Good potential that a fault line may effect portion of this property. Seismic evaluation of the site by geotechnical consultant will be required. 6. "Private Community" Should the City approve this project as a "Private Community", all of the facilities constructed by this project shall be the maintenance responsibility of the "Private Community". i FORESTRY AND FIRE--1y—`i DEN -DEPARTMENT COUNTY OF SAN BERNARDINO F. Proteytion Planning Services • Gov. , Government Center OFFICE OF PUBLIC SAFETY 2'85 No.Arrowhead Avenue. Flrot Floor • 6an Bernardino. CA 92415-0186 FLOYD TTnwFir_ niroctar (714) 387-4212, 067-4213 EMERGENCY SERVICES - - 5, 1990 Mr. r1ifford C. Hood ~'•-� '' '�'� Coast Construction Company, Inc. !' • • +' �•° 480 West Capricorn Street :r!•!:•1;:,:_,t+::.. Brea, California 92621 :,: !•«i:•=••!�• Ro: TTM 90-03 Tentative Tract No. 10395 •_ . �,..1..•.:.+i:„ Dear Mr. Hood r !�.,.,.- Please find attached amended fire conditions reflecting Chief Paul Miller's review of your project. As your letter of September 13, 1990, state approved you specific plan and tentative map subject to: 1. sprinkler all buildings (See condition F24G) 2. 32 foot private roads (see aorldition F9) 3. Three access points (See condition F6) 4.,T'•'- 4. - Building construction requirements upgraded to FR1 • + -1., Vil— requirements (See condition F27) t,i,•r,.•.r ?i•:a:aH• The City of Grand Terrace is also being sent a copy of the ;:•-, : A,,,,:, updated fire conditions for their file. ;:,,.,M. ;•!e,•% r:;14(i:i r: If you have any questions, please do not hesitate contacting .%r:! KA. our office. Sincerely, +,"""'• DAVID J: DRISCOLL, Chief �""'"•'"''" County Fire Warden •:!«w :.!�t !:� if 1A By Ernyle W. Jones, t aptain Fire Protection Planning Officer. C: City of Grand Terrace 1 s�990 File I ,;:..;.:.. Ou - ,r ! FORES g RY AND FIRE * DEN DEPARTMENT ' �'; COUNTY OF SAN BERNARDINO •.Fir4 Pratealon planning services V County Government Center OFFICE OF PUBLIC SAFETY 395 No.Arrowhoad Avenue, First Floor • San Barnardino, CA 92415-0186 FLOYD TiDWELL. Director (714);,87-621Z. 397-4413 >>�i�fli� EMERGENCY.SERVICES - ---- — — - Date. The following circled conditions apply to your project. Fire Department Reference Number: Z rm `Q ` 0 ED The above referenced project is protected by the San Bernardino County Forestry and Fire Warden Department. Prior to any construction occurring on any parcel, the applicant shall contact the Fire Department for verification of current Fire Protection requirements. FEZ All new construction shall comply with the existing 02 Uniform Fire Code%Requirements and all applicable statues, codes, ordinances, or standards of the Fire Department. i, 03 The street address shall be posted with a minimum of four (4) inch numbers, visible from the street and during the hours of darkness the numbers shall be low voltage internally electrically illuminated. Posted numbers shall contrast with thoir background and be legible from the street in accordance with the uniform Fire Code. Where building set backs exceed 100 feet -from the roadway, additional• contrasting four (4) inch numbers shall be displayed at the property access entrance. E4) Prior to final inspection or occupancy each chimney used in conjunction with any fireplace or any heating appliance in which solid or liquid fuel. is used shall be maintained with an approved spark arrester as identified in the Uniform Fire Code. F-5 Prior to- any construction occurring, all flammable vegetation .sball be removed from oach building alto a minimum-distance of thirty (30) feet from any flammable building material, including a finished structure. r P-6 Prior to final- inspection or occupancy the .development - and each.phase thereof shall have two (2) points of 2 vehicular access for fire and other emergency equipment, and for routes of escape which will safely handle evacuations as required in the development code. -7 Prior to final inspection or viceupancy, private roadways which exceed one-hundred and fifty (150) feet in length shall be approved by the Fire Department having jurisdiction, and shall be extended to within one hundred, and fifty (150) feet of, and shall give reasonable access to all portions of the exterior walls of the first story of any building. An access road shall be provided within fifty (50) feet of all buildings if the natural grade between the access road and the building is in excess of thirty percent (30) . Where the access roadway- cannot be provided, an approved fire protection system or systems shall be provided, as required and approved by the Fire Department. F-8 Prior to final inspection or occupancy a turn-around shall be provided at the end of each roadway, one- hundred and fifty (150) feet or more In length and shall be approved by the Fire Department. Cul-de-sac length shall not exceed six-hundred (600) feet except as identified in the development code and approved by the chief. Wtl� 5d_L�CT t F-9 Private road maintenance, including but not limited to grading and snow removal, shall be provided for prior- to recordation or approval. written documentation shall be submitted to the Fire Department having jurisdiction. Private fire access roads shall provide an..:all weather surface with minimum paving width of F-10 Water systems designed to meet the required fire flow of this development shall be approved by the Fire Department having jurisdiction. The developer shall furnish the Fire Department with two copies of the water system improvement plan for approval and a letter from the water Purveyor stating the availability of the required fir* slow prior to recordation. Water systems shall be operational and approved by the Fire -Department prior to any construction occurring. The required fire flow shall be determined by appropriate calculations, using the San Bernardino County "Guide for,the Determination of Recuired Fire Flour." In areas without water-serving utilities, the fire protection water system shall be . -based on NFPA pamphlet number 1231 and Uniform fire code requirements. Z. ..... .... .. -10 MS-IL3 T:HRDUGY IL5 Water systems designed to meet the required fire flaw shall be operational and approved by the Fire Department prior to any construction occurring. The required fire flow shall be determined by appropriate calculations, using the San Bernardino County "Guide For The Determination of Required Fire Flow". In area without water-serving utilities or fire protection water serving utilities, the fire protection water system shall be based on N.F.P.A. Pamphlet Number 1231 and the San Bernardino County Uniform Fire Code. F-11 Prior to Building permits being issued approved fire hydrants and fire hydrant pavement markers shall be installed. Fire hydrants shall be 611 diameter with a minimum one 4" and one 2 1/2" connection. The hydrant and fire hydrant markers shall be approved by Fire Department. All fire hydrant spacing shall. be 300 feet with the exception of single family residential which may be inc reasiod 'to 600 feet maximum. F-12 Prior to final inspection or occupancy this development shall comply with Fire Safety overlay conditions as adopted in County Ordinance Number 3341• The development is located In Fire Review. Area. F-13 Prior to issuance of a building permit a fuel modification zone in compliance with county standards is required. F-l4 Prior to final inspection or occupancy, an approved Fire Department key•box is required. It automatic electric security gates are used an approved look switch is required on each gate in lieu .of the box. -Questions and/or comments may be directed to the Fire Protection Planning Section; County Goverrunent Center, 385 North Arrowhead, lot Floor, San Bernardino, California, 92415-0186; or call (714) 387-4225. Thank you for your cooperation. sincerely, DAVID J. DRISCOLL,- Chief County Fare warden BY .Fire Pr ction, ing Officer c: L9 LY111- 4 _ _ I F16. Fire extinguishers are required in accordance with Uniform Fire Code Standard 010-1. F17. Any gated access shall be approved by the Fire Department and emergency access arrangements made prior to occupancy. F18. Additional requirements may be applied due to the lack of sufficient information to review. Please submit building plans and. declaration of use for proper application of codes. F19. wbe building occupancy is under the jurisdiction of the State Fire Marshal. Written documentation of review and inspeotion required prior to final occupancy. Contact the West Covina office at (818) 960-6441. F20. All flammablo liquid storago and dispensing shall be in compliance with the applicable sections of the Uniform Fire Code Article 79. plan review and permit to operate are required. F21. All commercial Liquefied petroleum Gas (LPG) storage and dispensing shall be in compliance with the Uniform Fire Code Article 82 and County Ordinance #3054. Plan review -and permit to operate are required. - F22. All access roadways shall be in accordance with County ordinance #3381. F23. Development is within the Fire-safety Overlay Area (Greenbelt Standards) . Compliance with the provisions of "County Ordinance #3341 as applicable and determined by the Fire Department shall be required. in those areas not so designated under said ordinance, the appropriate Community Plan overlay Ordinance will apply. F24. An automatic fire extinguishing system is •required for the following area(s) s A. Commercial-type food heat-processing equipment (UPC Sec. 10.314) B. Spray paint booths or rooms (UFC Sec. 45.205) C. High piled combustible storage (UVC Sec. 81.101) D. Occupancy and location (UFC Sec. 10.308) E. Entire- building due to lack of access ("UFC Sec. 10.270(b) as amended by County Ordinance #3381) V F. Entire Building and/or complex as fire flow mitigating measure (UFC sac. 10.301(x) as amended by County Ordi,nanco *3381) n Other area as indicated _&LL �cw��i t•-La S S c �_x � <,ar (UFC Sec. 10.301(a)(and 10.301(b) Spl. haz. ) H. Entire building or por-"vi,b Viereof as applicable under State Fire Marshal's Regulations (Title 19, CCR) . I. As Per city Ordinance All fire extinguishing systems, including automatic sprinkler systems, Classes I, II and III combined standpipes; Halon systems and other special automatic extinguishing systems, and basement pipe inlets shall be approved by both the Fire Department and the Office of Building and Safety prior to installation. Said systems shall meet the appropriate standard whether NFPA or UBC. The Fire Department shall be notified of any testing approval and shall witness said tests. Systems shall be operational prior to occupancy. ,F25. If the project area is assigned a development fee for capital improvements per County ordinance- ar policy, the developer agrees to participate in such a foo. Infrastructure planning fees are currently proposed for this area. F26. The applicant shall agree to participate in a Mello-Roos .or special improvement zone funding for expansion of local or Protection Services, if the project is included in an ordinance prior to"building permits being issued. 27 Additional requirements shall be require I as noted; i . SPCONDI �. ltiY-k IV Iv RECT S'L'►� '( 1990 COAST CONSTRUCTION CC)MP NY, INC. 480 WEST CAPRICORN STREET. BREA.CALIFORNIA 92621 (714) 990-1121 September 13, 1990 Mr. Jim Rankin Fire Protection Planning Officer San Bernardino County Forestry and Fire Warden Department- 385• N. -Arrowhead, First Floor San Bernardino, CA 92415-0186 Re: Tentative Tract No. 10395 Dear. Mr. Rankin: We have received a copy of your conditions in review of TTM 90-03, screen check submitted 6/18/90. The specific plan and tentative map have now been submitted for formal review, and the tentative map is identical in plan to the map submitted for screen check. Condition F-8 stipulates maximum cul-de-sac lerigths of 600 feet. Please be advised that this map was reviewed with Chief Paul Miller prior to submittal and approved subject to the following: 1) Sprinkler all buildings. 2) 32' wide private roads (this is a gated, private community) . 3) 3 'access points, 12' wide to wildlands; Lot 32, Lot 7, and between Lots 25 & 26. In addition, there is an existing emergency access from Wild Canyon Drive in Colton adjacent to our easterly boundary, at the reservoir near our southeast corner. The plan also calls for emergency access to Westwood Street in Colton. - z CONTflACTORS.':8UiLDERS-ANO-DEVELOPERS:':: - �yContracto�s LiC tt266585 Mr. Jim Rankin September 13, 1990 .. Page Two Our intent is to- develop and market lots for custom homes; consequently, each house will be individually processed and compliance with your conditions as to the structures can be assured. I have a copy of the tentative map with Chief Miller's conditions and signature thereon. Please call if you would like me to have a copy made and forwarded to your offices. Hopefully, the Chief will recall the map and this won't be necessary. We%would appreciate your. response to -the final processing to reflect our agreement with Chief Miller on the subject. Very truly yours, Clifford C. Hood Vice President CCH/lw Copy to: David Sawyer., Planning Director City of Grand-Terrace 4' J F'a 7 .. ..r.sr-.i. 0.1r- �pRESTRY AND FIRE WARDEN DEPARTMENT COUNTY OF SAN BERNARDINO Fire Protection Planning Services • County Government Center OFFICE OF PUBLIC SAFETY 385 No. Arrowhead Avenue, First Floor San Bernardino. CA 92415-0186 FLOYD TIDWELL,Director 17-4)387-4212, 387-4213 — EMERGENCY SERVICES r _9 7 Q �-03 Date: D en rg the communides of: l% '�A,. Angelus Oaks (�/� 7 /i/ Baker i�� • � y Mesa Big River l'he f of owing circled condit•ons apply to your project. Buck Meadow Lrading �^ (� Boron Federal Prison 1 1 1 7 l "1 (CDF)Chino Hiiis Fire Department Reference-Number: �y of Grand TerraCe City of Needies Grafton Hills -1 The above referenced project is protected by the San Copper Mosntem Mesa Bernardino County Forestry and Fire Warden Department. oaggettAkpxl Prior to any construction occurring on any parcel, the Dc%.•we applicant shall contact the Fire Department for 0 a,Qage verification of current Fire Protection requirements. Fau.-rAin 1?��aTd F=2 All new construction shall comply with the existing Havasu Uka Uniform Fire Code Requirements and all applicable Hzzrdale statues, codes, ordinances, or standards of the Fire tcoFEle� L_ Department. 1;9c11anC -3 The street address shall be posted with a minimum of Homestead Valley four (4) inch numbers, visible from the street and Johnson Valley during the hours of darkness the numbers shall be JoshuaRer low voltage internally electrically illuminated. (CDF)Lorna USn& Posted numbers shall contrast with their background (CD9 Lucerne VaLz_ and be legible from the street in accordance with the Lytle Cr2e Uniform Fire Code. Where building set backs exceed Mentor.- 100 feet from the roadway, additional contrasting four Mo„nm-,VWw Acre (4) inch numbers shall be displayed at the property p Valle. access entrance. Oak Gk- ()Gk Fe F- Prior to final inspection or occupancy each chimney PaA y1ob used in conjunction with any fireplace or any heating P&,r,T D= appliance in which solid or liquid fuel is used shall P•hela be maintained with an approved spark arrester as Pam— 'identified in the Uniform•Fire Code. Red sus an.A San Antcr° F=g Prior to any construction occurring, all flammable Lat vegetation shall be removed from each building site a v2 minimum distance of thirty (30) feet from any - su=a•Valk flammable building material, including a finished Yucai; structure. JCDF)Yucca Valli F-6 Prior to final inspection or occupancy the development and each phase thereof shall have two (2) points of vehicular access for fire and other emergency equipment, and for routes of escape which will safely handle evacuations as required in the development code_ F-7 Prior to final inspection or occupancy, private roadways which exceed one-hundred and fifty (150) feet in length shall be approved by the Fire Department having jurisdiction, and shall be extended to within one hundred and fifty (150) feet of, and shall give reasonable access to all portions of the. exterior walls of the first story of any building_ An access road shall be provided within fifty (50) feet of all buildings if the natural grade between the access road and the building is in excess of thirty percent (30) . Where the access roadway cannot be provided, an approved fire protection system or systems -shall be provided, as required and approved by the Fire Department. Prior to 'final inspection or occupancy a turn-around shall be provided at the end of each roadway, one- hundred and fifty (150) feet or more in length and shall be approved by the Fire Department. Cul-de-sac length shall not exceed six-hundred (600) feet except as identified in the development code and approved by the chief. - -9 Private road maintenance, including but not limited to grading and -snow removal, shall be provided for prior to recordation or approval. Written documentation shall be submitted to the Fire Department having jurisdiction. Private fire access roads shall provide an all weather surface with minimum.paving width of twenty (20) 'feet. -10 Water systems designed to meet the required fare flow of this development shall be approved by the Fire Department having jurisdiction. The developer shall furnish the Fire Department with two copies of the - water system improvement plan for approval and a letter from the Water Purveyor stating the availability of the required fire flow prior to recordation. Water systems shall be operational and approved by the Fire Department prior to any construction occurring. The required- fire_ flow shall be determined by appropriate calculations, using the San Bernardino County "Guide- for the Determination of R�!_guired Fire Flow." in areas without water-serving _ utilities, the fire protection water system shall be ry based on NFPA pamphlet number -1231 and Uniform .fire . Code requirements. j.,,. F-10 MS-IL3 THROUGH IL5 Water systems designed to meet the required fire flow shall be operational and approved by the Fire Department prior to any construction occurring. The required fire flow shall be determined by appropriate calculations, using the San Bernardino County "Guide For The Determination of Required Fire Flow". In_ areas without water-serving utilities, or fire protection water serving utilities, the fire protection water system shall be based on N.F.P.A. Pamphlet Number 1231 and the San Bernardino County Uniform Fire Code. F-1 Prior to Building permits being issued -approved fire hydrants and fire hydrant pavement markers shall be installed. Fire hydrants shall be 6" diameter with a minimum one 4" and one 2 1/2" connection.' The hydrant and fire hydrant markers shall be approved by Fire Department. All fire hydrant spacing shall be 300 feet with the exception of single family residential which may be increased to 600 feet maximum. F=12 Prior to final inspection or occupancy this development shall comply with Fire Safety overlay conditions as adopted in County Ordinance Number 3341. The development is located in Fire Review Area. F-13 Prior to issuance of a building permit a fuel modification zone in compliance with county standards is required. F-14 Prior to final inspection or occupancy, an approved Fire Department key box is required. If automatic electric security gates are used an approved lock switcli is required on each gate in lieu of the box. Questions and/or comments may be directed to the Fire Protection Planning Section; County_Government Center, 385 North Arrowhead, 1st Floor, San Bernardino, California, 92415-0186; or call (714) 387-4225. Thank you for your cooperation. Sincerely, DAVID J. DRISCOLL, Chief County Fire Warden By �G,� /I ire Protection Planning Officer _ .'fin.... `'Jh��•w:..- y \•• ` 1450 Washington Street • Colton, California 92324 • (714) 825-4128 9•`� d �. �hSfAvwZ�c. O.AQ June 20, 1990 City of Grand Terrace 22795 Barton Rd. Grand Terrace, Ca. 92324 ATTN: David Sawyer RE: TTM-90-3 79.5 acres Cost Construction/Honey Hills Development Tentative Tract 10395 David, Riverside Highland Water Company has an 8" water line that extends into this project 2001 past the ead�of the existing pavement on Westwood Street. The water service to 23400 Westwood is tapped onto the end of this -line. These existing facilities need to be protected during construction. One other condition would be that all houses blow 1350' elevation would need pressure regulators. Thank you. Sincerely Rich Haubert Distribution Superintendent RH/kb -. ^s C'D JUL -4)1990 Planning -- T4D�Rtice Department June 13, 1990 FILE NO. TIM-90-03 APPLICANT Coast Construction Co./Honey Hills Development LOCATION -23400 Westwood, Grand Terrace PROJECT An application to subdivide 79.5 acres in the RH District into 27 lots. Dear Reviewing Agency: The above referenced application is on file with the Grand Terrace Planning Department Please submit any comments your agency may have regarding this application to the attention of David R. Sawyer, Community Development Director, 22795 Barton Road, Grand Terrace, California,92324. Any such replies must.be received in this office no later than June 27, 1990. ' U 1111 Y COMPANIES: No input is necessary unless you have existing rights of ways or easements. YOUR RESPONSES CANNOT BE INCLUDED IN THE STAFF REPORT IF YOU DO, NOT MEET THE DEADLINE. Sincerely, a ,� fiA �AAA / David M Sawyer Sc,��di�JislOK �4�)s / •7` CommunityDevelo nLt Director + �/� P . (.c.1,fG;� !'�ov'7��t /�Flv DRS:mb t ao'o Enclosure d:\wp\planning\maps\ttm9003.mI qop,��.S, Y ,'H �e Aoo �(Iq=-A=u z s-laO 22795 Barton Road.--.* Grand-Terrace; California 92324-5295 (71824-6621<.:,_. d 1� '.cI — . -C b R.I. COL 4 -)N JOINT UNIFIED SCI'. �)OL DISTRICT 1212 Valencia Drive,Colton,California 92324-1798 (714)876-4227 �i BOARD OF El2UQATION September 17, 1990 MRS.PHYLLIS V.ZIMMERMAN President MRS.WENDY&CURRAN City of Grand Terrace Vice President Community Development Department MR.RAYABRIL,JR. 22795 Barton Road der` Grand Terrace, CA 92324-5295 MRS.DORM E.COOLEY MRS.RUM O.HARRIS SUBJECT TENTATIVE TRACT SP-90-03, TfM-90-039 E-90-08 MR.ARLIE R.HUBBARD MRS.PATRICIA L M The Colton Joint Unified School District is impacted at the present time. As a result, the school district assesses a fee of $1.58 per square foot of new residential floor area. ADMINISTRATION Unfortunately, the revenue generated by these "builders fees" is not nearly adequate to construct new schools, and is in mist MR.RUSSELL LDIGCINsoN instances claimed by the state as part of the "Match" Superintendent contribution under the State Lease-Purchase Program. MR.CHARLES K JORDAN Assistant superintendent The District is very concerned about the effects new residential Personnel projects will have on its existing schools, most of which are at MR.ROBERT W.MURPI Y or near capacity. As enrollments continue to clia .to record Ass`s`antSupefteness levels, Districts in western San Bernardino County are seeking methods to finance new schools, and will increasingly look to MISS NANCYA.NORTON cooperate with cities, counties, and developers in identifying Assistant superintendent. Cuffkub m and lnsuuceon appropriate finance mechanisms. MR DANNY CARRASCO Dimcoo.Admiriistrativeservices Please feel free to contact the District Facilities Office if you MR.ROLLWGRIDER have any questions, or wish to discuss the matter further. Director.Cuniculum MRS.BONNIE RUSSELL 1UNT Sincerely, Oirecto.Prrpl Personnel Services � 4j Greg G. Gage Coordinator, School Facilities GGG/mb SAP �91990 EXHIBIT Joining Together to Go the E)dra Mild �. STATE OF CAUFORNIA--BUSINESS, TRANSPORT. i AND HOUSING AGENCY GEORGE DEUKMEIIAN, Govrmor DEPARTMENT OF TRANSPORTATION A DISTRICT 8, P.O. BOX 231 . SAN BERNARDINO, CALIFORNIA 92402 TDD (714) 383-46W �b June 19, 1990 08-SBd-215-1_3 Mr. David R. Sawyer Community Development Director City of Grand Terrace 22795 -Barton Road Grand Terrace, CA 92324-5295 _ Dear Mr. Sawyer: Tentative Tract Mau 90-03 Although the traffic generated by this proposal does not appear to have a significant effect on the state highway system, consideration must be- given to the cumulative effect of continued development in this area. The City of Grand Terrace should consider the following to reduce congestion and fund improvements: * Formation of* an area wide program to reduce home based work trips in the City of Grand Terrace. * Each new project should be responsible to fund the pro-rata share of improvements to correct the deficiency in Level 'of Service caused by continued development in Grand Terrace. If you have any questions, please contact Tom Meyers at (714) 383-6908 or FAX (714) 383-4936. Very truly yours, HARVEY J. SAWYER Chief, Transportation Planning Branch B IB T::.. i EG'n OCT 0 Cl aqn SOUTHERN CALIFORNIA _gCIS . COMPANY 1981 LUGONIA AVENUE • REDLANDS, CALIFORNIA MAILING ADDRESS. BOX 3003. REDLANDS. CALIFORNIA 92=-9982 October 4, 1990 David R. Sawyer 22795 Barton Road Grand Terrace, CA 92324 ATTENTION: RE: SP-90-03, TTYS-90-03, E-90-08 Thank you for inquiring about the availability of natural gas service for your project. We are pleased to inform you that Southern California Gas Company has facilities in the area where the above named project is proposed. Gas service to the project could be provided from 4" main in Westwood without any significant impact on the environment. Tht service would be in accordance with the Company's policies and extension rules on file with the California Public Utilities Commission at the time contractural arrangements are made. You should be aware that ..his "Letter is not to be interpreted as a contractural commitment to serve the proposed project. but only as an informational service. The availability of natural gas service, as set fort: in this letter, is based upon present conditions of gas supply and regulatory policies. As . a public utility, the Southern California Gas Company is under the jurisdiction of to California Public Utilities Commission. We can also be affected by actions of federal regulatory agencies. Should these agencies take any action which affects gas supply or the conditions under which service is available, gas service will be provided in accordance with revised conditions. Typical demand use for: a. Residential (System Area Average/Use Per Meter) Yearly Single Family 799 therms/year dwelling unit Multi-Family 4 or less units 482 therms/year dwelling unit Multi Family 5 or more units 433 therms/year dwelling unit These averages are based on total gas consumption in residential units served by Southern California Gas Company,_ and it should not be implied that any particular home, apartment or tract of homes will use these amounts of energy. b. Commercial Due to the fact that construction varies so widely (a glass building vs_ a heavily insulated building) and there is such a wide variatio-' in types of materials and equipment used, a typical demand figure is not available for this type'of construction. Calculations would need i to be made after the building has been designed. XHIQIT RUT 0 CT COAST CONSTRUCTION COMPANY, INC. 480 WEST CAPRICORN STREET, BREA, CALIFORNIA 92621 (714) 990-1121 October 19, 1990 Mr. David Sawyer Community Development Director City of Grand Terrace 22795 Barton Road Grand Terrace, CA 92324-5295 Dear Mr. Sawyer: Considering the vast number of issues that were discussed at the Planning Commission Hearing on October 16, 1990, I have taken the opportunity to itemize some of the issues where we were either in disagreement with the staff reports, or needed some further discussion to arrive at a determination. . There will, undoubtedly, be other matters that Staff or Commissioners wish to pursue; but, at least by starting out with this list, we can minimize the issues that need to be resolved at the next Planning Commission Hearing. We have also enclosed for your perusal a list of the lots, lot areas and pad areas for the 37 residential lots. Please be advised that these are preliminary areas, and variations during design should be expected. I would like to take this opportunity to express our appreciation on the fairness of the staff presentation at the meeting of October- 16th, and I certainly reiterate my willingness to meet with you or members of the Commission, should they desire to discuss any of the particulars involved in this development. Very truly yours, . Clifford C. Hood Vice President ' CCH/lw _ Enclosure ATTAII�/I �IT CONTRACTORS. BUILDERS AND DEVELOPERS Contractor's Lic. #266585 SP-90-03/TTM-90-03/E-90-08 REVIEW OF RECOMMENDED CONDITIONS OF APPROVAL Itemized below are comments on those items of the recommended conditions of approval and engineer's memoranda, wherein we see some further discussion necessary prior to Planning Commission action on this matter. Due to the length of the meeting, our position on some of these items may have not been made clear; this report is an attempt to rectify the situation should that be the case. RECOMMENDED CONDITIONS 1. Please refer to comments under Engineering Memoranda. 4. We are unaware of the flight pattern impact on this project, and will confirm that if this is, indeed, the case, the appropriate conditions will be added to the CC&R's. 6. We feel that the condition needs to acknowledge the natural lots 3, 4, S, 6 , and 7, that will require special architectural consideration. Also, the condition implies that there will be no use, of any kind, of those areas of the lots to be left in their natural -state. We feel this may be too restrictive, and uses such as pet areas, play areas, view gazebos, etc. , should be considered. 8. It is our understanding that this condition was to refer to the approval of this specific project and, therefore, does need some clarification. 9. As we stated .at the Planning Commission Meeting, it is our preference that lot 38 remain as private open space for the reason stated. Public uses will intringe on the neighborhood we are attempting to- create. and it is not our intent that public access be available through the tract's private streets. 10. It is our understanding that, -water will -be maintained by the Riverside Highland Water District, and. the private roads will be dedicated as public utility easements for that purpose. ENGINEER'S MEMORANDUM - OCTOBER.12, 1990 2(a) Prior to the next meeting an attempt will be made to reach agreement between the Fire Warden and City Engineer with respect to the turnaround requirements. 2 2(b) Assuming we can satisfy the hydraulic needs of the street section, we would prefer a rolled curb and gutter, or similar special design, that provides a more rural flavor than the conventional curb and gutter. Additionally, since these are custom lots a rolled curb will provide more flexibility to the buyer in driveway placement, and .avoid removal and replacement of curb and gutter for driveway purposes. We are not concerned about the parkways being utilized for parking in that they will be heavily landscaped and policed by the Association. 3. We prefer there be no sidewalks. There are none outside the development and we do not expect much pedestrian traffic. 4. The matter of street lights was briefly touched upon, and it is our feeling that they may not be preferred by the community. We would propose that no conventional street lights be installed, but rather significant use of low (three to four feet) landscape lighting in the parkway areas be substituted. 6. We had no problem with this condition, providing we are not asked to correct a fault in the original design. This will not become known until the engineers have had the opportunity to perform the hydraulic calculations requested; this may not be until after the final hearing. 8. Grading was the obvious primary concern of the project. The tentative map does indicate the grading concept to be adhered to in the design, and proposed pad elevations for all lots other than lots 3, 4, 6, and 7, are on the map. Lot 5 does have a pad but it is not intended to be the entire site, and is only being padded to gain access to the area further to the rear of the lot that we feel will, probably, be where the custom designed house will follow the terrain. We would like to emphasize that this is a hillside project and the nuances of grading in hillside areas must be considered. The project has been planned as a cut-fill balance of approximately 150,000 cubic yards. This original earthwork was done by the conventional contour planimetering, and is the usual procedure for tentative map design. Considering the discussion, 'we have now asked our engineers to do a computer analysis of the earthwork prior to the next meeting so that any minor changes necessary to effect a design balance can be presented. It should also be noted that even though the grading plan will indicate a balance, certain assumptions will be made . regarding shrinkage of some materials, and actual swell of the rock material existing in the westerly ridges. Consequently, as the grading operation proceeds, it is 3 absolutely routine in grading that an imbalance of 5-10% �- will occur during the grading operation. This is ordinarily adjusted out by design changes so as to avoid export or import. Because the rock areas that will require some demolition are situated along the westerly ridge adjacent to the existing development of the City of Grand Terrace, no adjustment in grades in that area would be expected once the final grading plan has been designed. It is not practical to go back into an area and do additional blasting once the grades have been established. We would, therefore, anticipate raising or lowering the eastern sector of the tract from lots 13 through 25 as required to bring the final grading operation into balance. This is an absolutely normal procedure in grading operations of this magnitude. OTHER COMMENTS 1. We do need to address the request of the City of Colton pertaining to their equestrian trails. We have no knowledge as to the City of Grand Terrace's position in this matter. As stated at the Commission Hearing, we are certainly willing to work out something at the southeast corner of our project, but any equestrian trail that traverses the site from north to south and is intended to access the westerly terminus of Westwood Street in the City of Colton, will be ` looked at with close scrutiny particularly,. pertaining to the privacy factor of our buyers and the liability of the Association relative to the use of Association property. 2. The access drive crossing lot 7 is intended to be an access easement and will be so noted. The owner of the property to the north at this particular location does have easement rights crossing this property, which will follow the route of the private streets to this easement. 3. Although it is probably not an issue that needs to be included in the conditions, we- have committed to work out legal access to the owner of the piece shown as "not a part", which does happen to lie in .the City of Colton. We feel his unfortunate situation can easily be corrected during the course of our development and, unless there 'is some legal or other reason unknown'to us not do so, we will proceed in that direction. 4. We would appreciate the proposed wording for the CC&R's relative to view preservation of adjacent property, prior to the next meeting so that we may have our attorneys review same 4 and be prepared to present mutually acceptable wording to '. the Commission at the next meeting. Other technical issues in the CC&R' s will, undoubtedly, be worked out during the course of the ensuing months as the final documents are being processed. TRACT 10395 AREA TABULATION (Planimeter Accuracy) (Natural) Lot # Lot Area Pad Area. Slope Area Ungraded Area 1 22000 ft2 (0.51 ac) 10500 ft2 2100 ft2 9400 2 30500 (0. 70 ac) 13700 7600 9200 3 65000 (1.49 ac) - 1000 64000 4 51500 (1.18 ac) - 9000 42500 5 40100 (0.92 ac) 10100 1500 28500 6 37200 (0.85 ac) - 2000 35200 7 78700 (1.80 ac) - 11500 67200 8 .158600 (3.63 ac) 16000 35800 106800 9 114600 (2.62 ac) 17200 4700 92700 10 29700 (0.68 ac) 10000 8500 11200 11 15000 (0.34 ac) 10000 5000 12 11500 (0.26 ac) 10000 1500 13 23400 (0.54 ac) 11000 12400 14 37500 (0.86 ac) - 11000 19300 7200 15 42400 (0.97 ac) 18200 12700 11500 16 13500 (0.31 ac) 11200 2300 17 14700 (0.34 ac) 14200 500 - 18 47500 (1.09 ac) 17800 10000 19700 19 34500 (0. 79 ac) 16700 12000 5800 20 100200 (2.29 ac) 34800 10000 55400 21 16700 (0.38- ac) 11000 800 4900 22 12500 (0.29 ac) 8800 3700 - 23 21500 (0.49 ac) 13000 2800 5700 24 33600 (0. 77 ac) 11500 10000 12100 25 58000 (1.33 ac) 13400 27000 17600 26 23900 (0.55 ac) 12000 7400 4500 27 24900 (0.57 ac) 10100 11700 3100 28 24000 (0.55 .ac) 10700 4200 9100 29 23700 (0.54 ac) 10300 3500 9900 30 37000 (0.85 ac) 12200 8000 16800 31 60700 (1.39 ac) 12800 18400 29500 32 39300 (0.90 ac) 13500 5000 20800 33 62500 (1.43 ac) 13400 16100 33000 34 66000 (1.51 ac) 21100 9900 35000 35 27500 (0.63 ac) 12100 2500 12900 36 20400 (0.47 ac) 10000 6000 4400 37 27500 (0.63 ac) 12400 7100 8000 1547800 (35.44 ac) 440700 313500 793600