1987-09 RESOLUTION NO. 87-09
i
A RESOLUTION OF THE PLANNING COMMISSION OF
THE CITY OF GRAND TERRACE, CALIFORNIA
RECOMMENDING APPROVAL OF SP/CUP-87-1 AND
ADOPTING A NEGATIVE DECLARATION FOR THE
DEVELOPMENT
WHEREAS , the Applicant , Forest City Dillon, has applied for
approval of SP/CUP 87-1 , (Exhibit A) at 11914 Mt . Vernon Avenue;
and
WHEREAS , the adoption of SP/CUP-87-1 would incorporate the
adoption of a Conditional Use Permit ; and
WHEREAS , a Negative Declaration has been prepared for this
project (Exhibit B) ; and
WHEREAS , a properly noticed public hearing was held by the
Planning Commission on September 21 , 1987 , regarding this
application; and
I
WHEREAS , the Planning Commission has found that the adoption
of SP/CUP-87-1 are consistent with the goals of the City' s
General Plan.
NOW, THEREFORE, BE IT RESOLVED by the Planning Commission of
the City of Grand Terrace, California, that :
1 . The Negative Declaration for SP/CUP 87-1 is hereby
recommended for approval ;
BE IT FURTHER RESOLVED that SP/CUP 8T-1 is hereby approved
subject to the following conditions :
1 . Canal Street
a) Widen Canal Street in accordance with a plan
approved by the City of Grand Terrace .
b) Provide access across Gage Canal to Canal Street
as approved by the City of Grand Terrace, City of
Riverside and Gage Canal Company. The access to
be approved shall include vehicular, pedestrian
and utilities as may be required by the proposed
development.
2 . Mt . Vernon Avenue
a) Dedications to the ultimate right of way 44 foot
half street shall be provided.,
b) Install curb and gutter 12 feet from centerline .
c) Install standard sidewalk.
d) Access to subject property from Mt . Vernon Avenue
shall be provided at a location where the sight
distance and the stopping distance meets at least
the minimum requirements of the Highway Design
Manual .
e) Median turning lane shall be constructed for the
left and right turn movement into the development.
Said median island shall be approved by the
Planning Department as to architectural treatment
of the materials to be used within the island
area.
3 . Install ornamental street lights .
4. Provide adequate drainage facilities and an erosion
control plan during construction.
5 . Pay pro-rata share of the traffic signal installation
at the following intersections :
a) Barton Road and Mt . Vernon Avenue.
b) Barton Road and Canal Street .
6. File a one lot subdivision on the parcels on which this
project is prepared.
7 . Pay off all outstanding sewer bond amounts for A.D. 1
CSA 70 Zone H.
8 . Provide access easement to any parcel abutting this
property which may now have access across Gage Canal .
9 . Prior to- the issuance of a building permit , a "Will
Serve" letter from the Riverside Highland Water Company
shall be submitted to the Department of Building and
Safety.
10 . All utilities shall be underground.
11 . All private streets shall be constructed to provide a
structural section based on a traffic index of five .
12 . Prior to the issuance of building permits , the
developer shall submit a comprehensive grading plan to
the Department of Building and Safety. The plan shall
comply with the Uniform Building Code .
13 . Prior to the issuance of building permits , the water
system shall be designed by a registered civil engineer
to the satisfaction of the Riverside Highland Water
Company, the San Bernardino County Fire Department and
City Engineer.
14 . Prior to the issuance of building permits , street
improvements plans shall be designed by a registered
civil engineer to the satisfaction of the City
Engineer.
15 . All improvements shall be constructed to the
satisfaction of the City Engineer.
16 . Prior to the issuance of building permits , street
improvement plans shall be designed by a registered
civil engineer to the satisfaction of the City
Engineer.
17 . All off-site run-off that presently drains over the
site shall continue to be accepted.
18 . Prior to the issuance of building permits , obtain a
letter of non-interference from any utility company
that may have rights of easement within the property
boundaries .
19 . The maintenance of graded slopes and landscaped areas
shall be the responsibility of the developer.
20 . Prior to the issuance of building permits , the
developer shall pay all applicable school development
fees that may exist at that time .
21 . The water system and fire hydrants shall be installed
in accordance with the requirements of the State Health
and Safety Code, the California Administrative Code ,
and plans approved by the designated fire protection
authority.
22 . The planting and permanent irrigation system(s) shall
be installed per approved landscape plan.
23. All parking areas shall be designated with clearly
painted lines and equipped with. wheel stops .
24. Prior to any occupancy, a Certificate of Final
Completion shall be issued by the City Building
Department, after which, an application shall be
submitted to the Department of Environmental Health
Services for a Certificate of Occupancy.
25 . Construction plans for the swimming pools and spas
shall be submitted to the Department of Environmental
Health Services prior to construction and shall be
adequately fenced per City and County regulations .
26 . A detailed lighting plan shall be submitted to and
approved by the Planning Director and City- Engineer.
27 . A detailed landscaping and irrigation plan shall be
submitted to and approved by the Director of Building
and Safety and the Planning Director.
28 . An additional twenty-two guest parking spaces shall be
provided for a total of 58 guest parking spaces . All
guest parking spaces. shall be identified and located in
various groupings throughout the project .
29 . Street improvement plans for Mt . Vernon Road shall be
consistent with those approved for Phase I .
30 . The location of the security gates , in relation to the
public r-o-w, shall be approved by the City Engineer.
31 . All conditions of approval listed in the Fire
Department ' s memo dated September 1 , 1987 (Exhibit C) .
32 . Upon agreement with the holder of the Gage
Canal Easement, the applicant shall landscape
the Gage Canal as approved by the Planning
Director and City Engineer. A maintenance
agreement between the City and the applicant
shall be executed whereas the applicant will
reimburse the city for the costs of
maintenance .
PASSED AND ADOPTED by the Planning Commission of the City of
Grand Terrace , California, at a regular meeting held the 21st day
of September, 1987 by the following vote :
AYES : 6
NOES : 1
ABSENT: Q.'
ABSTAIN-0
Norman Caouette, Chairperson,
Grand Terrace , Planning Commission
ATTEST
_D6uty City Cl'erk
APPROVED AS TQ M
r
Ivan Hopkins , lCity Attorney