G.7 - Measure I Capital ProjectsJuly 13, 2021
Measure I Capital
Improvement Plan for
FY 2021/2022
(Street Improvements)
Supports 2030 Vision Goal #2:
‘Maintain Public Safety’ by investing in
improvements to public infrastructure
•City of Grand Terrace submits a Five Year Roadway Capital Improvement Plan
to San Bernardino County Transportation Authority (SBCTA)
•Five Year Plan identifies streets that need preventative maintenance and is
funded by Measure ‘I’
•Moving forward to the ‘next phase of street improvements’: Grind and Overlay
•Five Year Measure ‘I’ look ahead (estimated costs):
•FY 2021-2022 Total: $1.64 million
•FY 2022-2023 Total: $707,000
•FY 2023-2024 Total: $401,000
•FY 2024-2025 Total: $563,000
•FY 2025-2026 Total: $579,000
BACKGROUND
Adopt a ‘Resolution of the City Council of the
City of Grand Terrace adopting the Measure I
Five Year Capital Improvement Plan for FY
2021/2022
RECOMMENDATION:
Questions?
Year 2021-2022 Grind and Overlay 2" Asphalt Concrete/Resurfacing
Street From To
Vivienda Ct.Cul-de-Sac Vivenda Ave.
De Soto St.Mirado Ave.Mt. Vernon Ave.
Pico St.Michigan St.Reed Ave.
Van Buren St.West End.Michigan Ave.
Van Buren St.Reed Ave.Mt. Vernon Ave.
Vivienda Ave.Vivienda Ct. Barton Rd.
Fulmar Pl.Pascal Ave.Cul-de-Sac
La Cadena Dr.Litton Ave. Barton Rd.
Estimated grind and overlay
cost:$1,368,666
Other roadway repairs and
striping:$270,000
Fiscal Year 2021/2022
Grand Total:$1,638,667
Year 2022-2023 Grind and Overlay 2” Asphalt Concrete/Resurfacing
Street From To
Thrush St.Warbler Ave.Oriole Ave.
Hampton Ct.Observation Dr.Cul-de-Sac
La Paix St.Oriole Ave.Dos Rios Ave.
Minona Dr.Mt. Vernon Ave.Kingston St.
Estimated grind and overlay
cost:$410,812.80
Other roadway repairs and
striping:$270,000
Fiscal Year 2022/2023
Grand Total:$706,830
Year 2023-2024 Grind and Overlay 2” Asphalt Concrete/Resurfacing
Street From To
Merle Ct.Canary Ct.Cul-de-Sac
Vivienda Ave.End Vivienda Ave.
Victoria St.Pascal Ave.Canal St.
Estimated grind and overlay
cost:$131,424.00
Other roadway repairs and
striping:$270,000
Fiscal Year 2023/2024 Grand
Total:$401,424
Year 2024-2025 Grind and Overlay 2” Asphalt Concrete/Resurfacing
Street From To
Grand Terrace Rd.Newport Ave.End
Cardinal Ct.Michigan Ave.Cul-de-Sac
Kingston St.La Paix St.De Soto Ct.
Vista Grande Wy Grand Terrace Rd.Vista Grande Wy.
Canary Ct.Merle Ct.Cul-de-Sac
Estimated grind and
overlay cost:$293,016
Other roadway repairs and
striping:$270,000
Fiscal Year 2024/2025
Grand Total:$563,016
Year 2025-2026 Grind and Overlay 2" Asphalt Concrete/Resurfacing
Street From To
Blue Mountain Ct.Pico St.Cul-de-Sac
Kentfield St.Warbler Ave.Oriole Ave.
Napa Ct.Fremontia Ave.Cul-de-Sac
Ladera St.Fremontia Ave.Reed Ave.
Terrace Ave.Walnut Ave.Barton Rd.
Estimated grind and
overlay cost:$308,916.00
Other roadway repairs
and striping:$270,000
Fiscal Year 2025/2026:$578,916